Agreement No. CE 73/98 Investigation Assignment for Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling – Environmental Impact Assessment

 

Environmental Impact Assessment Final Assessment Report

Volume 1 of 2

CONTENTS

TECHNICAL CHECKLIST (ONTM ANNEX 11) TO REVIEW AN EIA REPORT

1.       INTRODUCTION

2.       PROJECT DESCRIPTION

3.       RELEVANT ENVIRONMENTAL LEGISLATION

4.       AIR QUALITY IMPACT ASSESSMENT

5.       NOISE IMPACT ASSESSMENT

6.       WATER QUALITY

7.       SOLID WASTE MANAGEMENT ASSESSMENT

8.       ECOLOGY

9.       LANDSCAPE AND VISUAL IMPACT ASSESSMENT

10.   CULTURAL HERITAGE IMPACT ASSESSMENT

11.   ENVIRONMENTAL MONITORING AND AUDIT

12.   CONCLUSIONS

13.   SCHEDULE OF RECOMMENDED MITIGATION MEASURES

 

Volume 2 of 2

CONTENTS

·         FIGURES

·         DRAWINGS

·         APPENDIX 1.1 Construction Programme

·         APPENDIX 4.1 Emission Factors

·         APPENDIX 4.2 "CALINE4" Modelling Results Summary

·         APPENDIX 4.3 "CALINE4" Modelling Output Files

·         APPENDIX 5.1 Construction Plant Inventory

·         APPENDIX 5.2 Estimation of Maximum Construction Traffic Flows

·         APPENDIX 5.3 Traffic Flow Forecast supplied by MVA Hong Kong Limited

·         APPENDIX 5.4 Predicted Construction Noise Levels

·         APPENDIX 5.5 Correspondence from MVA Indicating the Worst Traffic Scenario is Year 2020

·         APPENDIX 5.6 Predicted Traffic Noise Levels

·         APPENDIX 5.7 "siteNoise" (Construction Noise) Input Files Sample

·         APPENDIX 5.8 "roadNoise" Input Files Sample

·         APPENDIX 5.9 Computer Plot of "roadNoise" Model

·         APPENDIX 5.10 Correspondences from Government Department

·         APPENDIX 5.11 Equipment Sound Power Levels Information from Local Suppliers

·         APPENDIX 5.12 2006 Cross Border Freight Traffic Flows Extracted from the NIA for 24 Hour Opening of Border Crossings Final Report August 1996

·         APPENDIX 5.13 Predicted Year 2006 Cross Border Freight Traffic Noise with the Widened Highways and Proposed Mitigation Measures

·         APPENDIX 8.1 Summary of Freshwater Benthic & Fisheries Surveys

·         APPENDIX 8.2 Photos from Ecological Survey

·         APPENDIX 9.1 Compensatory Planting Proposals

·         APPENDIX 9.2 Soft Landscape Treatment Area and Location

·         APPENDIX 10 Archaeological Impact Assessment Report