Agreement No. CE 73/98 Investigation Assignment for Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling Environmental Impact Assessment

 

Environmental Impact Assessment Final Assessment Report

Volume 1 of 2

CONTENTS

TECHNICAL CHECKLIST (ONTM ANNEX 11) TO REVIEW AN EIA REPORT

1.       INTRODUCTION

2.       PROJECT DESCRIPTION

3.       RELEVANT ENVIRONMENTAL LEGISLATION

4.       AIR QUALITY IMPACT ASSESSMENT

5.       NOISE IMPACT ASSESSMENT

6.       WATER QUALITY

7.       SOLID WASTE MANAGEMENT ASSESSMENT

8.       ECOLOGY

9.       LANDSCAPE AND VISUAL IMPACT ASSESSMENT

10.   CULTURAL HERITAGE IMPACT ASSESSMENT

11.   ENVIRONMENTAL MONITORING AND AUDIT

12.   CONCLUSIONS

13.   SCHEDULE OF RECOMMENDED MITIGATION MEASURES

 

Volume 2 of 2

CONTENTS

         FIGURES

         DRAWINGS

         APPENDIX 1.1 Construction Programme

         APPENDIX 4.1 Emission Factors

         APPENDIX 4.2 "CALINE4" Modelling Results Summary

         APPENDIX 4.3 "CALINE4" Modelling Output Files

         APPENDIX 5.1 Construction Plant Inventory

         APPENDIX 5.2 Estimation of Maximum Construction Traffic Flows

         APPENDIX 5.3 Traffic Flow Forecast supplied by MVA Hong Kong Limited

         APPENDIX 5.4 Predicted Construction Noise Levels

         APPENDIX 5.5 Correspondence from MVA Indicating the Worst Traffic Scenario is Year 2020

         APPENDIX 5.6 Predicted Traffic Noise Levels

         APPENDIX 5.7 "siteNoise" (Construction Noise) Input Files Sample

         APPENDIX 5.8 "roadNoise" Input Files Sample

         APPENDIX 5.9 Computer Plot of "roadNoise" Model

         APPENDIX 5.10 Correspondences from Government Department

         APPENDIX 5.11 Equipment Sound Power Levels Information from Local Suppliers

         APPENDIX 5.12 2006 Cross Border Freight Traffic Flows Extracted from the NIA for 24 Hour Opening of Border Crossings Final Report August 1996

         APPENDIX 5.13 Predicted Year 2006 Cross Border Freight Traffic Noise with the Widened Highways and Proposed Mitigation Measures

         APPENDIX 8.1 Summary of Freshwater Benthic & Fisheries Surveys

         APPENDIX 8.2 Photos from Ecological Survey

         APPENDIX 9.1 Compensatory Planting Proposals

         APPENDIX 9.2 Soft Landscape Treatment Area and Location

         APPENDIX 10 Archaeological Impact Assessment Report