Agreement No. CE 73/98 Investigation Assignment for Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling – Environmental Impact Assessment |
Environmental Impact
Assessment Final Assessment Report
Volume 1 of 2
TECHNICAL CHECKLIST (ONTM ANNEX 11) TO REVIEW AN EIA REPORT
1. INTRODUCTION
3. RELEVANT ENVIRONMENTAL LEGISLATION
4. AIR QUALITY IMPACT ASSESSMENT
7. SOLID WASTE MANAGEMENT ASSESSMENT
8. ECOLOGY
9. LANDSCAPE AND VISUAL IMPACT ASSESSMENT
10. CULTURAL HERITAGE IMPACT ASSESSMENT
11. ENVIRONMENTAL MONITORING AND AUDIT
12. CONCLUSIONS
13. SCHEDULE OF RECOMMENDED MITIGATION MEASURES
Volume 2 of 2
· FIGURES
· DRAWINGS
· APPENDIX 1.1 Construction Programme
· APPENDIX 4.1 Emission Factors
· APPENDIX 4.2 "CALINE4" Modelling Results Summary
· APPENDIX 4.3 "CALINE4" Modelling Output Files
· APPENDIX 5.1 Construction Plant Inventory
· APPENDIX 5.2 Estimation of Maximum Construction Traffic Flows
· APPENDIX 5.3 Traffic Flow Forecast supplied by MVA Hong Kong Limited
· APPENDIX 5.4 Predicted Construction Noise Levels
· APPENDIX 5.5 Correspondence from MVA Indicating the Worst Traffic Scenario is Year 2020
· APPENDIX 5.6 Predicted Traffic Noise Levels
· APPENDIX 5.7 "siteNoise" (Construction Noise) Input Files Sample
· APPENDIX 5.8 "roadNoise" Input Files Sample
· APPENDIX 5.9 Computer Plot of "roadNoise" Model
· APPENDIX 5.10 Correspondences from Government Department
· APPENDIX 5.11 Equipment Sound Power Levels Information from Local Suppliers
· APPENDIX 8.1 Summary of Freshwater Benthic & Fisheries Surveys
· APPENDIX 8.2 Photos from Ecological Survey
· APPENDIX 9.1 Compensatory Planting Proposals
· APPENDIX 9.2 Soft Landscape Treatment Area and Location
· APPENDIX 10 Archaeological Impact Assessment Report