            | Project Title | : 
              Widening of Tolo Highway between Island House Interchange and Tai Hang |   
            | Client Department | : 
              Highways Department |   
            | Engineer | : 
              Hyder-Arup-Black & Veatch Joint Venture (HABVJV) |   
            | Environmental Team | : 
              AECOM Asia Co. Ltd. |   
            | Independent Environmental Checker | : 
              Mott MacDonald Limited |    The Widening of Tolo Highway 
          between Island House Interchange and Tai Hang, comprises mainly: 
          Please visit the Project 
        Website for detailed information. 
            | (i) | Widening 
              of a 5.7 km section of Tolo Highway between Island House Interchange 
              and Tai Hang from the existing dual 3-lane to dual 4-lane, including 
              construction of new vehicular bridges; 
 |   
            | (ii) | Widening 
              of interchange sections at Island House Interchange, Tai Po North 
              Interchange, and Lam Kam Road Interchange from dual 2-lane to dual 
              3-lane except Sha Tin bound carriageway at Tai Po North Interchange, 
              which is widened from 3-lane to 4-lane, including realignment of 
              various slip roads; 
 |   
            | (iii) | Improvement 
              to the existing substandard merging arrangement at the southbound 
              carriageway of Wo Hop Shek Interchange; |   
            | (iv) | Modification 
              and reconstruction of highways, vehicular bridges, underpasses and 
              footbridges; and |   
            | (v) | Construction 
              of Kau Lung Hang Vehicular Bridge. |     |