TABLE OF CONTENTS
Page
1.1 Project
Organization and Contacts of Key Management
1.3 Summary
of Construction Works
2 Environmental Monitoring and Audit Requirements
2.3 Environmental
Quality Performance Limits (Action/Limit Levels)
2.4 Environmental
Mitigation Measures
5 Advice on the Solid and Liquid Waste Management Status
6 Summary of Exceedances of the Environmental Quality Performance Limit
7 Summary of Complaints, Notifications of Summons and Successful
Prosecutions
8 Comments, recommendations and Conclusions
List of
Tables
Table 1.1 Contact Information of Key Personnel
Table 3.1 Summary of 1-hour TSP
Monitoring Results in the Reporting Period
Table 3.2 Summary of 24-hour
TSP Monitoring Results in the Reporting Period
Table 3.3 Summary of the Number of Exceedances for 1-hr &
24-hr TSP Monitoring
Table 4.1 Summary of Construction Noise Monitoring Results in
the Reporting Period
Table 4.2 Summary of the Number of Monitoring Exceedances for
Construction Noise
Table 5.1 Summary of
Waste Flow Table for Contract No. HY/2012/06
Table 5.2 Summary of
Waste Flow Table for Contract No. 02/HY/2015 (Works
Order Nos. CB128520-5 and CB128519-0)
Figure 1.1 General
Project Layout Plan of Contract No. HY/2012/06
Figure 1.3a-b Locations
of Monitoring Station
List of Appendices
Appendix A Project
Organization Structure
Appendix B Construction
Programme
Appendix C Implementation
Schedule of Environmental Mitigation Measures (EMIS)
Appendix D Summary of Action
and Limit Levels
Appendix E Impact
Air Quality Monitoring Results and their Graphical Presentation
Appendix F Meteorological
Data
Appendix G Impact
Daytime Construction Noise Monitoring Results and their Graphical Presentation
Appendix H Statistics
on Complaints, Notifications of Summons and Successful Prosecutions
The proposed widening of Tolo Highway and Fanling Highway
between Island House Interchange and Fanling (the
Project) is a Designated Project under the Environmental Impact Assessment
Ordinance (Cap. 499) (EIAO). An Environmental Impact Assessment (EIA) Report
(the approved EIA Report) together with an Environmental Monitoring and Audit
(EM&A) Manual (the approved EM&A Manual) were completed and approved
under the EIAO on 14 July 2000 (Register Number: EIA-043/2000).
The objective of the Project ¡°Widening of Tolo
Highway / Fanling Highway between Island House
Interchange and Fanling¡± is to widen Tolo Highway and Fanling Highway
to dual 4-lane carriageway in order to alleviate the current traffic congestion
problems and to cope with the increasing transport demands to and from the
urban areas and also cross boundary traffic.
The construction works for this Project will be delivered in 2 stages
i.e. Stage 1 (between Island House Interchange and Tai Hang) and Stage 2
(between Tai Hang and Wo Hop Shek Interchange). Stage 2 would be implemented under three
works contracts. Contract No.
HY2012/06 ¡°Widening of Fanling Highway ¨C Tai Hang to
Wo Hop Shek Interchange¡± and the entrusted portion to
CEDD under Contract No. CV/2012/09 ¡±Liantang/Heung Yuen Wai Boundary Control Point Site
Formation and Infrastructure Works ¨C Contract 3¡±. In addition, Contract No. ¡°Provision of
Bus-Bus Interchange on Fanling Highway Kowloon Bound¡±
was carried out within the site boundary of Contract No. 02/HY/2015. This
report focuses on Contract No. HY/2012/06 ¡°Widening of Fanling
Highway ¨C Tai Hang to Wo Hop Shek Interchange¡± in Stage 2 of the Project and ¡°Provision of Bus-Bus Interchange on Fanling Highway Kowloon Bound¡± under Works Order Nos.
CB128520-5 and CB128519-0 in Contract No. 02/HY/2015 ¡°Highway Department Term
Contract (Management and Maintenance of Roads in Tai Po and North District
excluding High Speed Roads 2016-2022)¡±. The construction works of Works Order Nos. CB128520-5 and CB128519-0
under Contract No. 02/HY/2015 have been completed on 23 May 2018.
Pursuant
to the EP (EP-324/2008/E) Condition 2.7, the Capture Survey Trip Report for Ma
Wat River Northern Meander (Version 2) for the Project was submitted on 24
December 2013 by the Environmental Team (ET) and verified by the Independent
Environmental Checker (IEC) on 6 January 2014.
The
construction phase of the Contract under the EP and the Environmental
Monitoring and Audit (EM&A) programme of the contract commenced on 21 November 2013. The impact
environmental monitoring and audit includes air quality and noise monitoring.
This report documents the
findings of EM&A works conducted in the period between 1 August 2018 and 31
October 2018. As informed by the Contractor, construction activities of
Contract No. HY/12012/06 in the reporting period were as follows:
- Ground investigation
- Pipe laying
- Retaining wall construction
- Noise barrier
- Excavation
- Backfilling
- Drainage
- Bridge construction
- Piling
Reporting Change
There was no reporting change
required in the reporting period.
Breaches of Action and Limit Levels for Air
Quality
No
exceedance of Action and Limit Level was recorded for 1-hour and 24-hour TSP
monitoring in the reporting period.
Breaches of
Action and Limit Levels for Noise
No Action or Limit Level exceedance of construction
noise was recorded in the reporting period. No noise complaints related to 0700
¨C 1900 hours on normal weekdays was received and followed by Environmental Team
in the reporting period.
Complaint, Notification of Summons and
Successful Prosecution
No complaint, notification of
summons and successful prosecution was received in the reporting period.
Future Key Issues
Key
issues to be considered in the coming month include:
-
Properly store and label oils and chemicals on site;
-
Chemical, chemical waste and waste management;
-
Collection of construction waste should be carried out regularly;
-
Properly maintain all drainage facilities and wheel washing facilities
on site;
-
Exposed slopes should be covered up properly if no temporary work
will be conducted;
-
Quieter powered mechanical equipment should be used;
-
Suppress dust generated from excavation activities and haul road
traffic; and
-
Tree protective measures for all retained trees should be well
maintained.
Table 1.1 Contact Information of Key Personnel
Position |
Name |
Telephone |
Fax |
|
ER (Hyder-Arup-Black
& Veatch Joint Venture) |
Chief Resident Engineer |
Edwin
Chung |
6115 0818 |
2638 0950 |
IEC (Mott MacDonald Hong Kong Limited) |
Independent Environmental
Checker |
Steven Tang |
2828 5920 |
2827 1823 |
Contractor of [HY/2012/06] (China State Construction
Engineering (Hong Kong) Limited) |
Environmental Officer |
Michael Tsang |
9277 4956 |
2672 2501 |
C C
Chow |
9679 6315 |
2672 2501 |
||
Contractor
of [02/HY/2015] (Chiu Hing
Construction & Transportation Company Limited) |
Safety Officer |
Marty Tai |
9106 5318 |
- |
ET (AECOM Asia Company Limited) |
ET Leader |
Y W Fung |
3922 9393 |
3922 9797 |
- Site clearance
- Ground investigation
- Pipe laying
- Retaining wall construction
- Noise barrier
- Excavation
- Backfilling
- Drainage
- Bridge construction
-
Piling
Table 3.1 Summary
of 1-hour TSP Monitoring Results in the Reporting Period
Location |
Average (mg/m3) |
Range (mg/m3) |
Action Level (mg/m3) |
Limit Level (mg/m3) |
AM2 (Fanling Government Secondary School) |
68.1 |
62.9 ¨C 73.3 |
317.8 |
500 |
Table 3.2 Summary of 24-hour
TSP Monitoring Results in the Reporting Period
Location |
Average (mg/m3) |
Range (mg/m3) |
Action Level (mg/m3) |
Limit Level (mg/m3) |
AM2 (Fanling Government Secondary School) |
38.8 |
18.6 ¨C 73.4 |
200.7 |
260 |
Table
4.1 Summary of Construction Noise Monitoring Results in the Reporting
Period
|
Average (dB(A)) Leq (30 mins) |
Range (dB(A)) Leq (30 mins) |
Limit Level (dB(A)) Leq (30 mins) |
M2* (West
Tai Wo) |
68.1 |
63.1 ¨C 69.7 |
75 |
M3# (Fanling Government Secondary School) |
64.7 |
58.9 ¨C 68.3 |
65/70 |
*+3dB(A) Façade correction included
# Limit Level of 70dB(A) applies to
education institutes while 65dB(A) applies during school examination period.
Table 5.1 Summary of Waste Flow Table for Contract No. HY/2012/06
Waste
Type |
Actual
Amount |
Disposal/Reuse
Locations |
Inert
C&D materials disposed as public fill |
1,616 m3 |
Tuen Mun
38 |
Broken
concrete |
0 m3 |
Tuen Mun
38 |
C&D wastes
disposed as general refuse |
275 m3 |
NENT Landfill |
Paper/cardboard
packaging |
191 kg |
Recycling Facilities |
Plastics |
0 kg |
Recycling Facilities |
Metals |
4,562 kg |
Recycling Facilities |
C&D
materials reused on site |
4,516 m3 |
Site Area |
C&D
materials reused in other projects |
4,714 m3 |
Other projects |
Chemical wastes |
0 kg |
Licensed Contractors |
Contract No. HY/2012/06
Air Quality Impact
Construction Noise Impact
Water Quality Impact
Chemical
and Waste Management
Landscape and
Visual Impact
Miscellaneous