TABLE OF CONTENTS
Page
1.1 Project Organization and Contacts of Key Management
1.3 Summary of Construction Works
2 Environmental Monitoring
and Audit Requirements
2.3 Environmental Quality Performance Limits (Action/Limit
Levels)
2.4 Environmental Mitigation Measures
5 Advice on the Solid and
Liquid Waste Management Status
6 Summary of Exceedances of
the Environmental Quality Performance Limit
7 Summary of Complaints,
Notifications of Summons and Successful Prosecutions
8 Comments, recommendations
and Conclusions
List of Tables
Table 1.1 Contact Information of Key Personnel
Table 3.1 Summary of 1-hour TSP
Monitoring Results in the Reporting Period
Table 3.2 Summary of 24-hour
TSP Monitoring Results in the Reporting Period
Table 3.3 Summary of the Number of Exceedances for 1-hr &
24-hr TSP Monitoring
Table 4.1 Summary of Construction Noise Monitoring Results in
the Reporting Period
Table 4.2 Summary of the Number of Monitoring Exceedances for
Construction Noise
Table 5.1 Summary of
Waste Flow Table for Contract No. HY/2012/06
Table 5.2 Summary of
Waste Flow Table for Contract No. 02/HY/2015 (Works Order Nos. CB128520-5
and CB128519-0)
Figure 1.1 General
Project Layout Plan of Contract No. HY/2012/06
Figure 1.3a-b Locations
of Monitoring Station
List of
Appendices
Appendix A Project
Organization Structure
Appendix B Construction
Programme
Appendix C Implementation
Schedule of Environmental Mitigation Measures (EMIS)
Appendix D Summary of Action
and Limit Levels
Appendix E Impact
Air Quality Monitoring Results and their Graphical Presentation
Appendix F Meteorological
Data
Appendix G Impact
Daytime Construction Noise Monitoring Results and their Graphical Presentation
Appendix H Statistics
on Complaints, Notifications of Summons and Successful Prosecutions
The proposed
widening of Tolo Highway and Fanling Highway between Island House Interchange
and Fanling (the Project) is a Designated Project under the Environmental Impact
Assessment Ordinance (Cap. 499) (EIAO). An Environmental Impact Assessment
(EIA) Report (the approved EIA Report) together with an Environmental
Monitoring and Audit (EM&A) Manual (the approved EM&A Manual) were
completed and approved under the EIAO on 14 July 2000 (Register Number:
EIA-043/2000).
The
objective of the Project ¡°Widening of Tolo Highway / Fanling Highway between
Island House Interchange and Fanling¡± is to widen Tolo Highway and Fanling
Highway to dual 4-lane carriageway in order to alleviate the current traffic
congestion problems and to cope with the increasing transport demands to and
from the urban areas and also cross boundary traffic.
The
construction works for this Project will be delivered in 2 stages i.e. Stage 1
(between Island House Interchange and Tai Hang) and Stage 2 (between Tai Hang
and Wo Hop Shek Interchange). Stage
2 would be implemented under three works contracts. Contract No. HY2012/06 ¡°Widening of
Fanling Highway ¨C Tai Hang to Wo Hop Shek Interchange¡± and the entrusted
portion to CEDD under Contract No. CV/2012/09 ¡±Liantang/Heung Yuen Wai Boundary
Control Point Site Formation and Infrastructure Works ¨C Contract 3¡±. In addition, Contract No. ¡°Provision of
Bus-Bus Interchange on Fanling Highway Kowloon Bound¡± was carried out within
the site boundary of Contract No. 02/HY/2015. This report focuses on Contract No. HY/2012/06 ¡°Widening of Fanling Highway ¨C Tai Hang to
Wo Hop Shek Interchange¡± in Stage
2 of the Project and ¡°Provision of
Bus-Bus Interchange on Fanling Highway Kowloon Bound¡± under Works Order Nos.
CB128520-5 and CB128519-0 in Contract No. 02/HY/2015 ¡°Highway Department Term
Contract (Management and Maintenance of Roads in Tai Po and North District
excluding High Speed Roads 2016-2022)¡±. The construction works of Works Order Nos. CB128520-5 and CB128519-0
under Contract No. 02/HY/2015 have been completed on 23 May 2018.
Pursuant to
the EP (EP-324/2008/E) Condition 2.7, the Capture Survey Trip Report
for Ma Wat River Northern Meander (Version 2) for the Project was submitted on
24 December 2013 by the Environmental Team (ET) and verified by the Independent
Environmental Checker (IEC) on 6 January 2014.
The construction phase of the Contract under the EP and the Environmental
Monitoring and Audit (EM&A) programme of the contract commenced on 21 November
2013. The impact environmental monitoring and audit includes air quality and
noise monitoring.
This
report documents the findings of EM&A works conducted in the period between
1 May 2018 and 31 July 2018. As informed by the Contractor, construction
activities of Contract No. HY/12012/06 in the reporting period were as follows:
- Ground investigation
- Pipe laying
- Retaining wall construction
- Noise barrier
- Excavation
- Backfilling
- Drainage
- Bridge construction
-
Piling
As informed by the Contractor, construction
activities of Works
Order Nos. CB128520-5 and CB128519-0 under Contract
No. 02/HY/2015 in the reporting period were:
-
Construction of footpath & bus lay-by
Reporting Change
There was no reporting change required in
the reporting period.
Breaches of Action and Limit
Levels for Air Quality
No exceedance
of Action and Limit Level was recorded for 1-hour and 24-hour TSP monitoring in
the reporting period.
Breaches of
Action and Limit Levels for Noise
No Action or Limit Level exceedance of construction
noise was recorded in the reporting period. No noise complaints related to 0700
¨C 1900 hours on normal weekdays was received and followed by Environmental Team
in the reporting period.
One (1) Limit Level exceedance was recorded on 9
April 2018 for noise monitoring at M3 in the previous reporting period. The
exceedance at M3 is considered to be contributed from background noise,
possibly traffic noise from Pak Wo Road and Fanling Highway. The exceedance was
considered non-project-related.
Complaint, Notification of
Summons and Successful Prosecution
No complaint, notification of
summons and successful prosecution was received in the reporting period.
Future Key Issues
Key issues to be
considered in the coming month include:
-
Properly
store and label oils and chemicals on site;
-
Chemical,
chemical waste and waste management;
-
Collection
of construction waste should be carried out regularly;
-
Properly
maintain all drainage facilities and wheel washing facilities on site;
-
Exposed
slopes should be covered up properly if no temporary work will be conducted;
-
Quieter
powered mechanical equipment should be used;
-
Suppress
dust generated from excavation activities and haul road traffic; and
-
Tree
protective measures for all retained trees should be well maintained.
Table 1.1 Contact
Information of Key Personnel
Position |
Name |
Telephone |
Fax |
|
ER (Hyder-Arup-Black & Veatch Joint
Venture) |
Chief Resident Engineer |
Edwin Chung |
6115 0818 |
2638 0950 |
IEC (Mott MacDonald Hong Kong Limited) |
Independent Environmental Checker |
Steven Tang |
2828 5920 |
2827 1823 |
Contractor
of [HY/2012/06] (China State Construction Engineering
(Hong Kong) Limited) |
Environmental Officer |
Michael Tsang |
9277 4956 |
2672 2501 |
C C Chow |
9679 6315 |
2672 2501 |
||
Contractor
of [02/HY/2015] (Chiu Hing Construction &
Transportation Company Limited) |
Safety Officer |
Marty Tai |
9106 5318 |
- |
ET (AECOM Asia Company Limited) |
ET Leader |
Y W Fung |
3922 9393 |
3922 9797 |
- Site clearance
- Ground investigation
- Pipe laying
- Retaining wall construction
- Noise barrier
- Excavation
- Backfilling
- Drainage
- Bridge construction
- Piling
-
Construction of footpath & bus lay-by
Table 3.1 Summary
of 1-hour TSP Monitoring Results in the Reporting Period
Location |
Average (mg/m3) |
Range (mg/m3) |
Action Level (mg/m3) |
Limit Level (mg/m3) |
AM2 (Fanling
Government Secondary School) |
67.4 |
58.8 ¨C 76.1 |
317.8 |
500 |
Table 3.2 Summary
of 24-hour TSP Monitoring Results in the Reporting Period
Location |
Average (mg/m3) |
Range (mg/m3) |
Action Level (mg/m3) |
Limit Level (mg/m3) |
AM2 (Fanling
Government Secondary School) |
22.5 |
9.2 ¨C 47.5 |
200.7 |
260 |
Table 4.1 Summary of Construction Noise Monitoring
Results in the Reporting Period
|
Average (dB(A)) Leq
(30 mins) |
Range (dB(A)) Leq
(30 mins) |
Limit Level (dB(A)) Leq
(30 mins) |
M2* (West Tai Wo) |
68.8 |
66.6
¨C 71.2 |
75 |
M3# (Fanling
Government Secondary School) |
63.7 |
59.8 ¨C 66.5 |
65/70 |
*+3dB(A) Façade correction included
# Limit Level of 70dB(A) applies to education institutes while 65dB(A)
applies during school examination period.
Table 5.1 Summary of Waste Flow Table for Contract No. HY/2012/06
Waste
Type |
Actual
Amount |
Disposal/Reuse
Locations |
Inert C&D
materials disposed as public fill |
1,336 m3 |
Tuen Mun 38 |
Broken concrete |
43 m3 |
Tuen Mun 38 |
C&D wastes
disposed as general refuse |
295 m3 |
NENT Landfill |
Paper/cardboard
packaging |
212 kg |
Recycling Facilities |
Plastics |
3,437 kg |
Recycling Facilities |
Metals |
0 kg |
Recycling Facilities |
C&D materials
reused on site |
3,823 m3 |
Site Area |
C&D materials
reused in other projects |
3,670 m3 |
Other projects |
Chemical wastes |
0 kg |
Licensed Contractors |
Table 5.2 Summary of Waste Flow Table for Contract No. 02/HY/2015 (Works Order Nos. CB128520-5 and CB128519-0)
Waste
Type |
Actual
Amount |
Disposal/Reuse
Locations |
Inert C&D
materials disposed as public fill |
0 m3 |
Tuen Mun 38 |
Broken concrete |
0 m3 |
Tuen Mun 38 |
C&D wastes
disposed as general refuse |
0 m3 |
NENT Landfill |
Paper/cardboard
packaging |
1 kg |
Recycling Facilities |
Plastics |
0 kg |
Recycling Facilities |
Metals |
0 kg |
Recycling Facilities |
C&D materials
reused on site |
0 m3 |
Site Area |
C&D materials
reused in other projects |
0 m3 |
Other projects |
Contract No. HY/2012/06
Air Quality Impact
Construction Noise Impact
Water Quality Impact
Chemical
and Waste Management
Landscape and Visual
Impact
Miscellaneous
Contract No. 02/HY/2015 (Works
Order Nos. CB128520-5 and CB128519-0)
Air Quality Impact
Construction Noise Impact
Water Quality Impact
Chemical
and Waste Management
Landscape and Visual
Impact
Miscellaneous