Site
Inspection Summary
Contract No. |
HY/2012/06 |
Date: |
1 September 2015 |
Time: |
14:00 |
Inspection No.: |
94 |
|
Nil |
|
|
|
Follow-up Observation(s) |
1. |
The
bared ground surface was dampened more regularly for dust suppression.
(Closed) |
|
|
|
New
Observation(s) |
2. |
The
Contractor should wrap the breaker tip with acoustic-resistant materials to
reduce noise nuisance. |
|
|
|
Reminder(s) |
|
Nil. |
|
|
|
|
|
|
|
Nil |
|
Name |
Signature |
Date |
Prepared by |
Oscar Yip |
|
7 September 2015 |
Checked by |
Y W Fung |
|
7 September 2015 |
Contract No. |
HY/2012/06 |
Date: |
8 September 2015 |
Time: |
14:00 |
Inspection No.: |
95 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
The
breaker tip has been wrapped with sound absorbing material. (Closed) |
|
|
|
New
Observation(s) |
2. |
Muddy
water was observed in a catch pit. The Contractor should remove the muddy material
in catch pit and drainage. |
3. |
Potential
surface runoff and muddy water generated by wheel washing are observed at
site entrance. The Contractor should implement proper mitigation measures to
prevent any site water from entering public roads. |
4. |
The
load on vehicle was observed uncovered. The Contractor should ensure the load
on vehicle was covered entirely before leaving the site. |
|
Reminder(s) |
|
Nil. |
|
|
|
Nil |
|
Name |
Signature |
Date |
Prepared by |
Oscar Yip |
|
14 September 2015 |
Checked by |
Y W Fung |
|
14 September 2015 |
Contract No. |
HY/2012/06 |
Date: |
17 September 2015 |
Time: |
14:00 |
Inspection No.: |
96 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
Muddy
material in catch pit was removed. (Closed) |
2. |
The
mitigation measures to prevent site water from entering public roads are
still insufficient. The Contractor is recommended to install wheel washing
facility to prevent water generated by wheel washing from entering public
road. (Follow-up) |
3. |
The
load on vehicle was covered. (Closed) |
|
|
|
New
Observation(s) |
4. |
The
stagnant water in U- channel at SA 340 was observed to be turbid. The
Contractor should regularly remove the sediment at the bottom of the
U-channel. |
5. |
Dry
haul roads at W76A should be dampened to reduce dust generation. |
6. |
Environmental
Permit was observed missing at SA346. The up-to-date EP should be posted at
all entrances/exits. |
|
Reminder(s) |
|
Nil. |
|
|
|
Nil |
|
Name |
Signature |
Date |
Prepared by |
Oscar Yip |
|
18 September 2015 |
Checked by |
Y W Fung |
|
18 September 2015 |
Contract No. |
HY/2012/06 |
Date: |
22 September 2015 |
Time: |
14:00 |
Inspection No.: |
97 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
Wheel
washing bay has been constructed to prevent muddy water generated by wheel
washing entering the public road. (Closed) |
2. |
The
U- channel at SA 340 has been washed and the water quality has been improved.
(Closed) |
3. |
Regular
watering for the haul roads at W76A has been arranged. (Closed) |
4. |
Updated
EP has been displayed. (Closed) |
|
|
|
New
Observation(s) |
5. |
A
section of U- channel inside the site boundary at SA 340 was observed
accumulated with mud. The Contractor should remove the mud regularly
especially after rain fall to maintain a high efficiency of the WetSep. |
6. |
Open
stockpile was observed. The Contractor should cover the stockpile after
works. |
7. |
Mud
trail was observed on public road. The Contractor should remove the mud trail
accordingly. |
|
Reminder(s) |
|
Nil. |
|
|
|
Nil |
|
Name |
Signature |
Date |
Prepared by |
Oscar Yip |
|
24 September 2015 |
Checked by |
Y W Fung |
|
24 September 2015 |
Contract No. |
HY/2012/06 |
Date: |
29 September 2015 |
Time: |
14:00 |
Inspection No.: |
98 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
The
mud in the U-channel was cleared. (Closed) |
2. |
The
stockpile of excavated material has been removed. (Closed) |
3. |
Mud
trail on public road has been cleaned. (Closed) |
|
|
|
New
Observation(s) |
4. |
The
Contractor should provide sufficient mitigation measures to prevent muddy
water generated by wheel washing from entering public road. |
5. |
Stagnant
water was observed in a material skip. The Contractor should remove the
stagnant water. |
|
Reminder(s) |
|
Nil. |
|
|
|
Nil |
|
Name |
Signature |
Date |
Prepared by |
Oscar Yip |
|
2 October 2015 |
Checked by |
Y W Fung |
|
2 October 2015 |