Site Inspection Summary

 

Inspection Information

Contract No.

HY/2012/06

Date:

7 July 2015

Time:

14:00

Inspection No.:

86

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

1.

The public road has been cleaned and cleared of muddy water. (Closed)

 

 

 

New Observation(s)

2.

Stagnant water was observed at the sheetpiling area. The Contractor should deploy a pump to pump away the water and ensure the water is treated before discharging from the construction site.

 

Reminder(s)

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

16 July 2015

Time:

14:00

Inspection No.:

87

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

1.

Stagnant water has been cleared. (Closed)

 

 

 

New Observation(s)

2.

Dusty materials were observed outside the site entrances of ID1 and near NB59. The Contractor should clean the entrances regularly to prevent dusty materials from entering public roads.

 

Reminder(s)

 

The Contractor was reminded to post the latest EP at all vehicle site entrances.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

21 July 2015

Time:

14:00

Inspection No.:

88

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

1.

Dusty material outside site entrances has been cleaned. (Closed)

 

 

 

New Observation(s)

2.

The Contractor should step up noise abatement measures to minimize noise nuisance during construction works. The Contractor should maximize the area of the sound-proof canvas or use equivalent measures to close the gap between the canvas and the ground, and wrap the breaker with effective sound-proof materials.

 

Reminder(s)

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

28 July 2015

Time:

14:00

Inspection No.:

89

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

1.

The gap between the sound-proof canvas and the ground has been filled by water-filled barriers.  The breaker has been wrapped with sound-proof materials. (Closed)

 

 

 

New Observation(s)

2.

Stagnant water and general refuse was observed in the drip tray. The Contractor should clear the stagnant water and general refuse, and dispose of them as chemical waste.

 

3.

Stagnant water was found in the bar bending area. The Contractor should clear the stagnant water to prevent mosquito breeding.

 

 

Reminder(s)

 

The Contractor was reminded to ensure the pump of the pit functions properly to effectively transfer accumulated water to the wastewater treatment facilities.

 

 

 

 

 

 

 

Remarks

 

 

Nil