Site Inspection Summary

 

 

Inspection Information

Contract No.

HY/2012/06

Date:

2 June 2015

Time:

14:00

Inspection No.:

81

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

 

Nil.

 

 

 

New Observation(s)

 

Nil.

 

Reminders

1.

The Contractor was reminded to cover the dusty stockpile entirely with tarpaulin for dust suppression.

2.

The Contractor was reminded to set up the wheel washing bay properly to avoid runoff from wheel washing.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

9 June 2015

Time:

14:00

Inspection No.:

82

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

 

Nil.

 

 

 

New Observation(s)

1.

 

2.

Water with oil mixture accumulated inside the drip trays were observed at SA346. The Contractor should remove the water mixture and dispose of as chemical waste properly.

General refuse accumulated under the footbridge at SA346. The Contractor should clean up the refuse regularly.

 

 

Reminders

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

18 June 2015

Time:

14:00

Inspection No.:

83

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

1.

The water mixture has been removed and collected as chemical waste. (Closed)

2.

The general refuse has been cleared. (Closed)

 

New Observation(s)

 

Nil.

 

Reminder(s)

 

The Contractor was reminded to enhance the water spraying frequency for dust suppression for the construction site.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

23 June 2015

Time:

14:00

Inspection No.:

84

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

 

Nil.

 

 

 

New Observation(s)

 

Nil.

 

Reminder(s)

 

Nil

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

30 June 2015

Time:

14:00

Inspection No.:

85

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

 

Nil.

 

 

 

New Observation(s)

1.

Muddy surface runoff was observed on the public road from the site area near Ho Ka Yuen Footbridge. The Contractor should clear the runoff from the public road and ensure there are sufficient sand bundings surrounding the site area.

 

Reminder(s)

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil