Site
Inspection Summary
Contract No. |
HY/2012/06 |
Date: |
3 March 2015 |
Time: |
14:00 |
Inspection No.: |
68 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
The
compactor has been removed off site for repairing and all contaminated soil
has been cleared. (Closed) |
|
|
|
New
Observation(s) |
2. |
The
Contractor should review their mechanism to collect muddy water to prevent
muddy water from discharging to public areas by clearing the mud accumulating
in the U-channel or carrying out equivalent measures. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
10 March 2015 |
Time: |
14:00 |
Inspection No.: |
69 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
The
U-channel has been cleared, slurry on the concrete surface has been removed
and a water pump at the end of the U-channel has been deployed to prevent
leakage of muddy water. (Closed) |
|
|
|
New
Observation(s) |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
19 March 2015 |
Time: |
14:00 |
Inspection No.: |
70 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
|
Nil. |
|
|
|
New
Observation(s) |
1. |
An
oil drum was placed on bare ground without drip tray. The Contractor should
provide a drip tray to the oil drum to retain oil leakage, if any. |
2. |
A chemical
container was observed without chemical label. The Contractor should stick
appropriate labels on the chemical container. |
|
Reminder(s) |
|
|
1. |
The
Contracotr was reminded to use another means such as pH papers to monitor the
pH of the water in the sedimentation tank regularly. |
|
|
2. |
The Contractor was
reminded to post the latest version of Environmental Permit at all site
entrances. |
3. |
The Contractor was
reminded to ensure all water discharged from the construction site has passed
the sedimentation tank. |
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
24 March 2015 |
Time: |
14:00 |
Inspection No.: |
71 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
A
drip tray has been provided to chemicals. (Closed) |
2. |
Corresponding
chemical label has been affixed to the chemical container. (Closed) |
|
New
Observation(s) |
3. |
Stagnant
water and general refuse was observed in a trench. The Contractor should
clear the stagnant water to prevent mosquito breeding and clear the refuse to
maintain site hygiene. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
31 March 2015 |
Time: |
14:00 |
Inspection No.: |
72 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
Stagnant
water and general refuse was cleared. (Closed) |
|
|
|
New
Observation(s) |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |