Site Inspection Summary

 

Inspection Information

Contract No.

HY/2012/06

Date:

3 February 2015

Time:

14:00

Inspection No.:

64

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

 

Nil.

 

 

 

New Observation(s)

 

Nil.

 

Reminder(s)

 

The Contractor was reminded to cover soil stockpiles entirely with tarpaulin for dust suppression.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

12 February 2015

Time:

14:00

Inspection No.:

65

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

 

Nil.

 

 

 

New Observation(s)

1.

Muddy water was observed on public road outside various site entrances. The Contractor should clear the muddy water regularly and review the wheel-washing facilities.

2.

The Contractor should enhance the watering frequency of the site area for dust suppression. (for the general site)

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

17 February 2015

Time:

14:00

Inspection No.:

66

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

1.

The mud on the public road has been cleared. (Closed)

2.

Manual watering of the site area has been arranged. (Closed)

 

New Observation(s)

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

24 February 2015

Time:

14:00

Inspection No.:

67

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

 

Nil.

 

 

 

New Observation(s)

1.

Oil leakage was observed from the compactor. The Contractor should provide a drip tray to retain the oil leakage and dispose of the stained soil properly as chemical waste.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil