Site Inspection Summary

 

Inspection Information

Contract No.

HY/2012/06

Date:

7 October 2014

Time:

14:00

Inspection No.:

47

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

1.

Unused chemical drums were removed off site. (Closed)

 

 

 

 

New Observation(s)

 

Nil.

 

Reminder

 

The site area was observed to be dry. The Contractor was reminded to enhance water spraying frequency for dust suppression.

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

16 October 2014

Time:

14:00

Inspection No.:

48

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

 

Nil.

 

 

 

 

New Observation(s)

1.

Muddy water was observed near the water barrier along the site boundary. The Contractor should clear the muddy water and add sand bundings near the site boundary to prevent the discharge of muddy water when necessary.

2.

General refuse was observed accumulating. The Contractor should clear the refuse regularly to maintain site hygiene.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

21 October 2014

Time:

14:00

Inspection No.:

49

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

1.

Muddy water observed near the water barriers along the site boundary was cleared. (Closed)

2.

General refuse was cleared. (Closed)

 

New Observation(s)

3.

Stockpiles of dusty materials were observed without dust suppression measures. The Contractor should spray the stockpiles with water or cover them entirely by tarpaulin sheets for dust suppression.

4.

A generator was observed on bare ground without a drip tray. The Contractor should provide a drip tray to the generator to retain any oil leakage.

 

Reminder(s)

 

The site was observed to be dry. The Contractor was reminded to spray water on main haul roads to maintain the surfaces wet and suppress dust.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2012/06

Date:

28 October 2014

Time:

14:00

Inspection No.:

50

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation(s)

1.

Stockpiles of demolition materials have been flattened to form a hard pavement surface. (Closed)

2.

A drip tray has been provided. (Closed)

 

New Observation(s)

 

Nil.

 

 

 

Reminder(s)

 

Stockpiles of construction materials were observed with entire covering. The Contractor was reminded to cover the stockpiles properly by tarpaulin entirely after work.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil