CONTRACT NO. HY/2012/06

Widening of Fanling Highway

Between Tai Hang and Wo Hop Shek Interchange (Stage 2)

 

ENVIRONMENTAL COMPLAINT ACTION FORM

                                     Environmental Enquiry No.: EC-01

(Related Previous Enquiry NO.: --  )

COMPLAINT DETAILS

Date Received

19 December 2013

Parameter

 * Air / Noise and Odour nuisance / Water / Waste / Landscape  

Enquirer’s Details

Name

Not disclosed

Contact Tel No.

Not disclosed

Address

Not disclosed

 

FOLLOW-UP ACTION

First Contact with the Complaint by

* Telephone / Site Visit / Referred from EPD (ref. N05/RN/00030582-13)

Date of the First Contact

19 December 2013

Details of Complaint:

EPD referred a complaint from Lot no. 116 of Fui Sha Wai at Tai Hang of Tai Po which concerned about the construction noise and diesel-liked smell generated from construction activity nearby which caused nuisance and health problem in the morning on 19 December 2013.

Investigation and Findings :

According to the information of the Contractor (China State Construction Engineering (HK) Ltd.), ground investigation for site preparation work was carried out at the area nearby Fui Sha Wai at Tai Hang of Tai Po on 19 December 2013. The diesel-liked smell is likely generated from the exhaust of drilling rig during operation (Figure 1).

Upon the receipt of complaint on 19 December 2013, the Contractor met with the complainant to discuss for the improvement measure to be taken for the works on the same date (Figure 2). The Contractor subsequently extended the exhaust duct of drilling rig to a higher position for achieving a better gas dispersion and hence to reduce the impact to the public on 20 December 2013 (Figure 3).

 

The Contractor willing to defer operation time of the drilling rig to later time in the morning to minimize nuisance caused to public.

 

The noise and odour nuisance complaint is considered project-related.

 

The Contractor is advised to implement the mitigation measures as stated in “Recommended Mitigation Measures”.

Exceedance Associated with Site Activity to

* No Exceedance / Action / Limit

Recommended Mitigation Measures:

1)  Extended the exhaust duct of drilling rig to a higher position for achieving a better gas dispersion and hence to reduce the impact to the neighbouring resident

2)  Reschedule of works to minimize noise disturbance to the neighbouring resident;

3)  To inspect the PMEs regularly and well maintained to ensure that they are operating efficiently and that exhaust emissions are not causing nuisance

4)  Informing the nearby residents in advance (at least one day) of any noisy works to be carried out in the morning.

* Delete where inappropriate

 

MONITORING

Ad hoc Monitoring undertaken

* Yes / No

 

 

 

* Delete where inappropriate

 

FOLLOW-UP SITE VISIT

Date

Observation

Signature

 

 

 

 

 

 

 

 

Prepared by:

Y W Fung

 

Designation:

Environmental Team Leader

 

Signature:

 

 

Date:

24 December 2013

 

 

Figure 1 – The concerned drilling rig

Exhaust of drilling rig

 

 

Figure 2 – Contractor met with the complainant

 


Figure 3 - Extended the exhaust duct of drilling rig.