Site Inspection Summary

 

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

4 September 2014

Time:

14:00

Inspection No.:

466

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

 

Nil.

 

 

 

New Observations

 

Nil.

 

Reminders

 

Active removal of stockpiles by excavators was observed. However, the Contractor was reminded to cover the exposed slopes entirely by impervious sheeting when there are no construction activities in the concerned area.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

4 June 2014

Time:

14:00

Inspection No.:

447

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

1.

Waste batteries were observed on the ground. The Contractor should collect and dispose of the unwanted batteries properly.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

5 June 2014

Time:

14:00

Inspection No.:

448

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

General refuse was removed (Closed).

2.

Muddy water and sand were cleared, and the drainage system was protected after reinstatement (Closed).

3.

Chemicals on the ground were removed (Closed).

 

New Observations

4.

Silt and grit were observed in the drains and the U-channel was observed to be obstructed. The Contractor should remove the deposited materials in the U-channel regularly.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

11 June 2014

Time:

09:00

Inspection No.:

449

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Waste batteries were cleared (Closed).

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

12 June 2014

Time:

14:00

Inspection No.:

450

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Silt was removed from the U-channel (Closed).

 

 

 

 

 

New Observations

 

Nil.

 

Reminders

 

Exposed working area was observed. The Contractor was reminded to enhance preventive measures for rainstorm protection to prevent silt from depositing in the river nearby.

 

Moreover, mud trails were observed on the access road. The Contractor was reminded to clear the mud trails on the access road.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

18 June 2014

Time:

09:00

Inspection No.:

451

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

19 June 2014

Time:

14:00

Inspection No.:

452

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

 

Nil.

 

 

 

 

 

New Observations

1.

Mud was observed on the public road outside Gate 30. The Contractor should clear the mud regularly and ensure vehicles have their wheels washed before they leave the site.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

25 June 2014

Time:

09:00

Inspection No.:

453

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

26 June 2014

Time:

14:00

Inspection No.:

454

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Mud was cleared on the public road outside Gate 30 (Closed).

 

 

 

 

 

New Observations

2.

Water was observed in plastic containers. The Contractor should clear the water to prevent mosquito breeding.

3.

Mud was observed on the footpath. The Contractor should clear the mud regularly.

4.

A water hose was disconnected and water spilled on the footpath. The Contractor should clear the mud washed onto the footpath.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

11 September 2014

Time:

14:00

Inspection No.:

467

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

 

Nil.

 

 

 

New Observations

 

Nil.

 

Reminders

 

An exposed stockpile was observed. The Contractor was reminded to cover the stockpile entirely by impervious sheeting when the soil is not in use.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

18 September 2014

Time:

14:00

Inspection No.:

468

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

 

Nil.

 

 

 

New Observations

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil