Site Inspection Summary

 

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

2 July 2014

Time:

09:00

Inspection No.:

455

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

4 June 2014

Time:

14:00

Inspection No.:

447

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

1.

Waste batteries were observed on the ground. The Contractor should collect and dispose of the unwanted batteries properly.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

5 June 2014

Time:

14:00

Inspection No.:

448

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

General refuse was removed (Closed).

2.

Muddy water and sand were cleared, and the drainage system was protected after reinstatement (Closed).

3.

Chemicals on the ground were removed (Closed).

 

New Observations

4.

Silt and grit were observed in the drains and the U-channel was observed to be obstructed. The Contractor should remove the deposited materials in the U-channel regularly.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

11 June 2014

Time:

09:00

Inspection No.:

449

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Waste batteries were cleared (Closed).

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

12 June 2014

Time:

14:00

Inspection No.:

450

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Silt was removed from the U-channel (Closed).

 

 

 

 

 

New Observations

 

Nil.

 

Reminders

 

Exposed working area was observed. The Contractor was reminded to enhance preventive measures for rainstorm protection to prevent silt from depositing in the river nearby.

 

Moreover, mud trails were observed on the access road. The Contractor was reminded to clear the mud trails on the access road.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

18 June 2014

Time:

09:00

Inspection No.:

451

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

19 June 2014

Time:

14:00

Inspection No.:

452

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

 

Nil.

 

 

 

 

 

New Observations

1.

Mud was observed on the public road outside Gate 30. The Contractor should clear the mud regularly and ensure vehicles have their wheels washed before they leave the site.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

25 June 2014

Time:

09:00

Inspection No.:

453

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

26 June 2014

Time:

14:00

Inspection No.:

454

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Mud was cleared on the public road outside Gate 30 (Closed).

 

 

 

 

 

New Observations

2.

Water was observed in plastic containers. The Contractor should clear the water to prevent mosquito breeding.

3.

Mud was observed on the footpath. The Contractor should clear the mud regularly.

4.

A water hose was disconnected and water spilled on the footpath. The Contractor should clear the mud washed onto the footpath.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

3 July 2014

Time:

14:00

Inspection No.:

456

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Water was removed together with the plastic containers (Closed).

2.

Mud on the footpath was cleared (Closed).

3.

Mud washed onto the footpath was cleared (Closed).

 

New Observations

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

9 July 2014

Time:

09:00

Inspection No.:

457

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

10 July 2014

Time:

14:00

Inspection No.:

458

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

 

Nil.

 

 

 

 

 

New Observations

1.

Stagnant water and general refuse were observed on Bridge 18A. The Contractor should clear the stagnant water to prevent mosquito breeding and clear the refuse to maintain site cleanliness.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

17 July 2014

Time:

14:00

Inspection No.:

459

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Stagnant water and general refuse were cleared on Bridge 18A (Closed).

 

 

 

 

 

New Observations

2.

General refuse was observed. The Contractor should clear the general refuse to maintain site tidiness.

3.

Exposed slope was observed. The Contractor should cover the exposed slope for rainstorm protection by impervious sheeting.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

24 July 2014

Time:

14:00

Inspection No.:

460

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

The accumulated general refuse was cleared (Closed).

2.

Exposed slope was covered by tarpaulin sheets and will be permanently covered by grass net (Closed).

 

 

 

New Observations

 

Nil.

 

Reminders

 

Exposed slopes were observed without dust suppression measures. The Contractor was reminded to cover the slopes after work for rainstorm protection.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

31 July 2014

Time:

14:00

Inspection No.:

461

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

 

Nil.

 

 

 

 

 

New Observations

1.

Open stockpiles were observed without dust suppression measures. The Contractor should cover the stockpiles with tarpaulin sheets or carry out equivalent dust suppression measures.

2.

Mud was observed on the footpath. The Contractor should clear the mud regularly.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil