Site
Inspection Summary
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contract No. |
HY/2008/09 (Between Island House Interchange and
Ma Wo) |
Date: |
4
June 2014 |
Time: |
14:00 |
Inspection No.: |
447 |
|
Nil |
|
Follow Up
Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
New
Observations |
|
|
1. |
Waste
batteries were observed on the ground. The Contractor should collect and
dispose of the unwanted batteries properly. |
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
5
June 2014 |
Time: |
14:00 |
Inspection No.: |
448 |
|
Nil |
|
Follow Up Observations |
1. |
General refuse was removed (Closed). |
2. |
Muddy water
and sand were cleared, and the drainage system was protected after
reinstatement (Closed). |
3. |
Chemicals on the ground were
removed (Closed). |
|
New Observations |
4. |
Silt and grit were observed
in the drains and the U-channel was observed to be obstructed. The Contractor
should remove the deposited materials in the U-channel regularly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2008/09 (Between Island House Interchange and
Ma Wo) |
Date: |
11
June 2014 |
Time: |
09:00 |
Inspection No.: |
449 |
|
Nil |
|
Follow Up
Observations |
|
|
1. |
Waste batteries were cleared (Closed). |
|
|
|
|
|
|
|
New
Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
12
June 2014 |
Time: |
14:00 |
Inspection No.: |
450 |
|
Nil |
|
Follow Up Observations |
1. |
Silt was
removed from the U-channel (Closed). |
|
|
|
|
|
New Observations |
|
Nil. |
|
Reminders |
|
Exposed working area was observed. The Contractor
was reminded to enhance preventive measures for rainstorm protection to
prevent silt from depositing in the river nearby. Moreover, mud trails were
observed on the access road. The Contractor was reminded to clear the mud
trails on the access road. |
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2008/09 (Between Island House Interchange and
Ma Wo) |
Date: |
18
June 2014 |
Time: |
09:00 |
Inspection No.: |
451 |
|
Nil |
|
Follow Up
Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
New
Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
19
June 2014 |
Time: |
14:00 |
Inspection No.: |
452 |
|
Nil |
|
Follow Up Observations |
|
Nil. |
|
|
|
|
|
New Observations |
1. |
Mud was observed on the
public road outside Gate 30. The Contractor should clear the mud regularly
and ensure vehicles have their wheels washed before they leave the site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2008/09 (Between Island House Interchange and
Ma Wo) |
Date: |
25
June 2014 |
Time: |
09:00 |
Inspection No.: |
453 |
|
Nil |
|
Follow Up
Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
New
Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
26
June 2014 |
Time: |
14:00 |
Inspection No.: |
454 |
|
Nil |
|
Follow Up Observations |
1. |
Mud was cleared on the public road outside Gate
30 (Closed). |
|
|
|
|
|
New Observations |
2. |
Water was observed in plastic
containers. The Contractor should clear the water to prevent mosquito
breeding. |
3. |
Mud was observed
on the footpath. The Contractor should clear the mud regularly. |
4. |
A water hose was disconnected and water spilled
on the footpath. The Contractor should clear the mud washed onto the
footpath. |
|
|
|
|
|
|
|
|
|
Nil |