Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

8 May 2014

Time:

14:00

Inspection No.:

439

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

1.

Open stockpiles were observed at the top of NB9. The Contractor was reminded to cover them with tarpaulin sheets, especially during rainstorm.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

2 April 2014

Time:

09:00

Inspection No.:

429

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

1.

The Contractor was reminded to provide a drip tray to the chemicals.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

3 April 2014

Time:

14:00

Inspection No.:

430

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Construction materials were removed from the trees (Closed).

 

 

 

 

 

New Observations

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

7 April 2014

Time:

14:00

Inspection No.:

431

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The chemicals were removed (Closed).

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

Stagnant water was observed at the catch pit. The Contractor was reminded to clear the water or treat the water regularly with larvicidal oil to prevent mosquito breeding.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

10 April 2014

Time:

14:00

Inspection No.:

432

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

 

Nil.

 

 

 

 

 

New Observations

1.

Exposed slope was observed. The Contractor was reminded to prevent soil from being depositing in existing drainage systems and the river nearby by covering the slope with tarpaulin sheets.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

16 April 2014

Time:

09:00

Inspection No.:

433

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Stagnant water at the catch pit was cleared (Closed).

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

17 April 2014

Time:

14:00

Inspection No.:

434

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Exposed slope is covered (Closed).

 

 

 

 

 

New Observations

2.

The Contractor was reminded to spray dusty surfaces with water.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

23 April 2014

Time:

09:00

Inspection No.:

435

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

24 April 2014

Time:

14:00

Inspection No.:

436

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Dusty materials were removed off site (Closed).

 

 

 

 

 

New Observations

2.

General refuse was observed near the worker rest area. The Contractor was reminded to clear the refuse to maintain site cleanliness.

3.

Oil drums were observed at the east abutment of Bridge 18. The Contractor was reminded to remove the oil drums.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

30 April 2014

Time:

09:00

Inspection No.:

437

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

30 April 2014

Time:

09:00

Inspection No.:

438

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

General refuse was removed (Closed).

2.

Oil drums were removed (Closed).

 

 

 

New Observations

3.

The Contractor was reminded to clear the water at the wheel-washing facilities.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

8 May 2014

Time:

14:00

Inspection No.:

440

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

The water at the wheel-washing facilities was cleared (Closed).

 

 

 

 

 

New Observations

2.

Stockpiles of dusty materials were not covered entirely by impervious sheets on Tai Wo Service Road West. The Contractor was reminded to cover them with tarpaulin sheets entirely.

3.

Open stockpile at W74 was not covered with tarpaulin sheets. The Contractor was reminded to cover the stockpile with tarpaulin sheets entirely.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

14 May 2014

Time:

09:00

Inspection No.:

441

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Open stockpiles have been covered (Closed).

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

15 May 2014

Time:

14:00

Inspection No.:

442

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Stockpiles of dusty material were removed (Closed).

 

2.

Open stockpile was covered by tarpaulin sheet (Closed).

 

 

 

New Observations

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

21 May 2014

Time:

09:00

Inspection No.:

443

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

22 May 2014

Time:

14:00

Inspection No.:

444

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

 

Nil.

 

 

 

 

 

New Observations

1.

Construction waste was observed near Gate 11. The Contractor was reminded to clear the waste t maintain site tidiness.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

28 May 2014

Time:

09:00

Inspection No.:

445

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

29 May 2014

Time:

14:00

Inspection No.:

446

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Construction waste was cleared (Closed).

 

 

 

 

 

New Observations

2.

General refuse was observed. The Contractor should clear the refuse to maintain site tidiness.

3.

Muddy water and sand were obseved near the drainge system in road. The Contractor should clear the muddy water and sand, and prevent muddy water from entering the draingae system by arranging sandbags or equivalent measures.

4.

Chemicals were observed on bar ground without drip trays. The Contractor should provide drip tray to chemicals.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil