Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
2 April 2014 |
Time: |
09:00 |
Inspection No.: |
429 |
|
Nil |
|
Follow
Up Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
New
Observations |
1. |
The Contractor was reminded to provide a drip tray to the chemicals. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
3 April 2014 |
Time: |
14:00 |
Inspection No.: |
430 |
|
Nil |
|
Follow Up
Observations |
1. |
Construction
materials were removed from the trees (Closed). |
|
|
|
|
|
New Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
7 April 2014 |
Time: |
14:00 |
Inspection No.: |
431 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
The chemicals were removed (Closed). |
|
|
|
|
|
|
|
New
Observations |
2. |
Stagnant water was observed at the catch pit. The Contractor was
reminded to clear the water or treat the water regularly with larvicidal oil
to prevent mosquito breeding. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
10 April 2014 |
Time: |
14:00 |
Inspection No.: |
432 |
|
Nil |
|
Follow Up
Observations |
|
Nil. |
|
|
|
|
|
New Observations |
1. |
Exposed slope was
observed. The Contractor was reminded to prevent soil from being depositing
in existing drainage systems and the river nearby by covering the slope with
tarpaulin sheets. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
16 April 2014 |
Time: |
09:00 |
Inspection No.: |
433 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Stagnant water at the catch pit was cleared
(Closed). |
|
|
|
|
|
|
|
New
Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
17 April 2014 |
Time: |
14:00 |
Inspection No.: |
434 |
|
Nil |
|
Follow Up
Observations |
1. |
Exposed
slope is covered (Closed). |
|
|
|
|
|
New Observations |
2. |
The Contractor was
reminded to spray dusty surfaces with water. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
23 April 2014 |
Time: |
09:00 |
Inspection No.: |
435 |
|
Nil |
|
Follow
Up Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
New
Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
24 April 2014 |
Time: |
14:00 |
Inspection No.: |
436 |
|
Nil |
|
Follow Up
Observations |
1. |
Dusty
materials were removed off site (Closed). |
|
|
|
|
|
New Observations |
2. |
General refuse was
observed near the worker rest area. The Contractor was reminded to clear the
refuse to maintain site cleanliness. |
3. |
Oil drums
were observed at the east abutment of Bridge 18. The Contractor was reminded
to remove the oil drums. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
30 April 2014 |
Time: |
09:00 |
Inspection No.: |
437 |
|
Nil |
|
Follow
Up Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
New
Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
30 April 2014 |
Time: |
09:00 |
Inspection No.: |
438 |
|
Nil |
|
Follow Up
Observations |
1. |
General
refuse was removed (Closed). |
2. |
Oil drums were removed (Closed). |
|
|
|
New Observations |
3. |
The Contractor was
reminded to clear the water at the wheel-washing facilities. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |