Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

2 April 2014

Time:

09:00

Inspection No.:

429

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

1.

The Contractor was reminded to provide a drip tray to the chemicals.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

3 April 2014

Time:

14:00

Inspection No.:

430

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Construction materials were removed from the trees (Closed).

 

 

 

 

 

New Observations

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

7 April 2014

Time:

14:00

Inspection No.:

431

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The chemicals were removed (Closed).

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

Stagnant water was observed at the catch pit. The Contractor was reminded to clear the water or treat the water regularly with larvicidal oil to prevent mosquito breeding.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

10 April 2014

Time:

14:00

Inspection No.:

432

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

 

Nil.

 

 

 

 

 

New Observations

1.

Exposed slope was observed. The Contractor was reminded to prevent soil from being depositing in existing drainage systems and the river nearby by covering the slope with tarpaulin sheets.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

16 April 2014

Time:

09:00

Inspection No.:

433

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Stagnant water at the catch pit was cleared (Closed).

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

17 April 2014

Time:

14:00

Inspection No.:

434

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Exposed slope is covered (Closed).

 

 

 

 

 

New Observations

2.

The Contractor was reminded to spray dusty surfaces with water.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

23 April 2014

Time:

09:00

Inspection No.:

435

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

24 April 2014

Time:

14:00

Inspection No.:

436

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

Dusty materials were removed off site (Closed).

 

 

 

 

 

New Observations

2.

General refuse was observed near the worker rest area. The Contractor was reminded to clear the refuse to maintain site cleanliness.

3.

Oil drums were observed at the east abutment of Bridge 18. The Contractor was reminded to remove the oil drums.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

30 April 2014

Time:

09:00

Inspection No.:

437

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

30 April 2014

Time:

09:00

Inspection No.:

438

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

Follow Up Observations

 

1.

General refuse was removed (Closed).

2.

Oil drums were removed (Closed).

 

 

 

New Observations

3.

The Contractor was reminded to clear the water at the wheel-washing facilities.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil