Appendix
L
Statistics
on Complaints, Notifications of Summons and Successful Prosecutions
|
Date
Received
|
Subject
|
Status
|
Total
no. followed up by ET this month
|
Total
no. followed up by ET since project commencement
|
Environmental complaints
|
13 January 2014
(New)
|
EPD referred a noise complaint on 13 January 2014 from a
resident living in Grand Palisades at Tai Po. The complainant complained
about the persistent construction noise emitted between late-night hours on
Saturdays and early morning of Sundays at[n1] [n2] Tolo Highway.
|
Closed |
3
|
37
|
21 January 2014
(New)
|
EPD referred a complaint on 21 January 2014. The
complainant drove via Tai Po Tai Wo Road section of
Tolo Highway on 21 January 2014 morning. He
observed a lot of muddy water generated from the Tolo
Highway widening construction works. Besides, he saw from Google Earth Image
Satellite that a pipe was used to draw water for ground washing, causing the
outflow of muddy runoff. As the mud on the road becomes dry, dust is
generated when vehicles are passing by.
The
complainant requests follow-up as soon as possible.
|
Closed |
|||
22 January 2014
(Follow-up)
|
EPD referred a follow-up complaint from a resident of Ma Wo on 22 January 2014. The complaint is about the dust
emission at the construction site of the Tolo
Highway widening construction works at Ma Wo on 21 January 2014 afternoon and 22 January 2014
morning. The complainant complained that there was insufficient water
spraying and tarpaulin sheets were not used. He expressed that the air
pollution problem has caused nuisance to him for three years. He requests
improvements by the Contractor and follow-up by the EPD.
|
Closed |
|||
Notification
of summons
|
-
|
-
|
-
|
0
|
0
|
Successful
Prosecutions
|
-
|
-
|
-
|
0
|
0
|