Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
|
Time: |
|
Inspection No.: |
|
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Access roads have been moister. The road has been
sprayed regularly with water to maintain wet surfaces (Closed). |
2. |
Oil drums were removed (Closed). |
|
|
|
|
|
New
Observations |
3. |
The
Contractor was reminded to clear the construction waste at the waste skip. |
|
|
4. |
Dry surfaces were observed on access roads near
the site exit. The Contractor was reminded to spray water to maintain the
entire surface wet and wash the wheels of vehicles before leaving the
construction site. |
5. |
The
Contractor was reminded to clear the stagnant water at the drip
tray so as to prevent mosquito breeding.
|
|
|
|
|
|
|
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
Contract No. |
HY/2008/09 (Between Island House Interchange and
Ma Wo) |
Date: |
08
January 2014 |
Time: |
09:15 |
Inspection No.: |
405 |
|
Nil |
|
Follow Up Observations |
|
|
1. |
Construction waste at the waste skip has been
cleared (Closed). |
2. |
Water has been sprayed on dry surfaces (Closed). |
3. |
Stagnant
water at the drip tray has been cleared (Closed). |
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Photo record
(site inspection audit conducted on 24 Dec 13):
1. Dry soil
surface was observed on access roads and the Contractor was reminded to spray
the access road with water or dust suppression chemicals to maintain the entire
surface wet. (Follow up)
2. Oil drums
were observed without drip tray and the Contractor was reminded to provide trays
to oil drums as a mitigation measure. (Follow up)
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
10
January 2014 |
Time: |
14:00 |
Inspection No.: |
406 |
|
Nil |
|
Follow Up Observations |
1. |
Mud at the
footpath was cleared and the height of sand bags is increased (Closed). |
2. |
Clear water was diverted to prevent muddy run-off
from washing out (Closed). New Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2008/09 (Between Island House Interchange and
Ma Wo) |
Date: |
15
January 2014 |
Time: |
09:15 |
Inspection No.: |
407 |
|
Nil |
|
Follow Up Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
16
January 2014 |
Time: |
14:15 |
Inspection No.: |
408 |
|
Nil |
|
Follow Up Observations |
|
Nil. |
|
|
|
New Observations |
1. |
The Contractor was reminded
to clear the refuse at the waste skip at G40A. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2008/09 (Between Island House Interchange and
Ma Wo) |
Date: |
22
January 2014 |
Time: |
09:15 |
Inspection No.: |
409 |
|
Nil |
|
Follow Up Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
23
January 2014 |
Time: |
09:15 |
Inspection No.: |
410 |
|
Nil |
|
Follow Up Observations |
1. |
The refuse at the waste skip
at G40A was cleared (Closed). |
|
|
|
New Observations |
2. |
The Contractor was reminded
to provide a drip tray to the chemical container on Lam Kam Flyover or remove
the chemical container. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2008/09 (Between Island House Interchange and
Ma Wo) |
Date: |
28
January 2014 |
Time: |
09:15 |
Inspection No.: |
411 |
|
Nil |
|
Follow Up Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
29
January 2014 |
Time: |
09:00 |
Inspection No.: |
412 |
|
Nil |
|
Follow Up Observations |
1. |
The chemical container on Lam
Kam Flyover was removed (Closed). |
|
|
|
New Observations |
2. |
The Contractor was reminded
to clear the muddy water at the wheel-washing facilities in Shek Kwu Lung. |
3. |
The Contractor
was reminded to clear the general refuse inside and next to the rubbish bin. |
4. |
The Contractor was reminded to wrap the breaker
properly with sound-absorptive materials. |
|
|
|
|
|
|
|
|
|
Nil |
The construction waste within the construction area
at bridge 10 had been removed. (Closed)
Stagnant
water was observed within the construction area at Gate 26.
The Contractor was reminded to clear the
construction waste accumulated at Gate 26 regularly.