Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

1 August 2013

Time:

14:00

Inspection No.:

360

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

General refuse had been removed from the recycling bins at Bridge 12A. (Closed)

2.

Stagnant water within the construction site had been removed at Bridge 12A. (Closed)

 

 

 

 

 

 

 

3.

Soil stockpiles at Bridge 12A had been covered with tarpaulin. (Closed)

 

 

 

 

 

 

 

 

 

New Observation

 

4.

The Contractor was reminded to provide drip tray for holding the oil drum at Wall 74.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

7 August 2013

Time:

14:00

Inspection No.:

361

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Degrease agent had been applied to remove the oil stains at Bridge 11A. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

Reminder

 

2.

The Contractor was reminded to prevent the sands and mud from being carried out to the public road at Bridge 10.

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

8 August 2013

Time:

14:00

Inspection No.:

362

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

Drip tray had been provided for holding the oil drum at Wall 74. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

.2.

The Contractor was reminded to remove the standing water within the construction site at W58B.

3.

Sands and debris were observed along the U-channel at Bridge 13. The Contractor was reminded to remove the sands and debris so as to maintain the drainage properly.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

15 August 2013

Time:

14:00

Inspection No.:

363

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

Stagnant water within the construction site at W58B had been removed. (Closed)

 

 

 

 

2.

Sands and debris observed along the U-channel at Bridge 13 had been cleared. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

3.

The Contractor was reminded to remove the general refuse within the construction site at W58B.

4.

Oil drum was placed on bare ground at W58B. The Contractor was reminded to remove the oil drum or provide a drip tray for holding the oil drum. 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

16 August 2013

Time:

9:00

Inspection No.:

364

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

.

 

 

 

 

Remarks

 

 

Nil

 

 

 

           

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

21 August 2013

Time:

9:00

Inspection No.:

365

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

22 August 2013

Time:

14:00

Inspection No.:

366

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

General refuse within the construction site at W58B had been removed. (Closed)

 

 

 

 

2.

Oil drum placed on bare ground at W58B had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

3.

Exposed cement bags were observed at Wall 59. The Contractor was reminded to cover the cement bags or remove them. .

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

28 August 2013

Time:

9:00

Inspection No.:

367

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

29 August 2013

Time:

14:00

Inspection No.:

368

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

Exposed cement bags at Wall 59 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

New Observation

2.

The Contractor was reminded to cover the soil stockpile at Wall 59.

 

 

 

 

 

 

 

Reminder

 

 

The Contractor was reminded to properly shelter the grouting station at Wall 59.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil