Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
1 August 2013 |
Time: |
14:00 |
Inspection No.: |
360 |
|
Nil |
|
Follow Up
Observations |
1. |
General refuse had been removed from the recycling bins at Bridge 12A.
(Closed) |
2. |
Stagnant
water within the construction site had been removed at Bridge 12A. (Closed) |
|
|
|
|
3. |
Soil stockpiles at
Bridge 12A had been covered with tarpaulin. (Closed) |
|
|
|
|
|
New Observation |
4. |
The Contractor was reminded to provide drip tray for holding the oil
drum at Wall 74. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
7 August 2013 |
Time: |
14:00 |
Inspection No.: |
361 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Degrease agent had been applied to remove the oil
stains at Bridge 11A. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
Reminder |
2. |
The Contractor was reminded to prevent the sands
and mud from being carried out to the public road at Bridge 10. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
8 August 2013 |
Time: |
14:00 |
Inspection No.: |
362 |
|
Nil |
|
Follow Up
Observations |
1. |
Drip tray had been provided for holding the oil drum at Wall 74.
(Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
.2. |
The Contractor was reminded to remove the standing water within the
construction site at W58B. |
3. |
Sands and
debris were observed along the U-channel at Bridge 13. The Contractor was
reminded to remove the sands and debris so as to maintain the drainage
properly. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
15 August 2013 |
Time: |
14:00 |
Inspection No.: |
363 |
|
Nil |
|
Follow Up
Observations |
1. |
Stagnant water within the construction site at W58B had been removed.
(Closed) |
|
|
2. |
Sands and debris observed along the U-channel at
Bridge 13 had been cleared. (Closed) |
|
|
|
|
|
|
|
|
|
New Observation |
3. |
The Contractor was reminded to remove the general refuse within the
construction site at W58B. |
4. |
Oil drum
was placed on bare ground at W58B. The Contractor was reminded to remove the
oil drum or provide a drip tray for holding the oil drum. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
16 August 2013 |
Time: |
9:00 |
Inspection No.: |
364 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
. |
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
21 August 2013 |
Time: |
9:00 |
Inspection No.: |
365 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
22 August 2013 |
Time: |
14:00 |
Inspection No.: |
366 |
|
Nil |
|
Follow Up
Observations |
1. |
General refuse within the construction site at W58B had been removed.
(Closed) |
|
|
2. |
Oil drum placed on bare ground at W58B had been
removed. (Closed) |
|
|
|
|
|
|
|
|
|
New Observation |
3. |
Exposed cement bags were observed at Wall 59. The Contractor was
reminded to cover the cement bags or remove them. . |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
28 August 2013 |
Time: |
9:00 |
Inspection No.: |
367 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
29 August 2013 |
Time: |
14:00 |
Inspection No.: |
368 |
|
Nil |
|
Follow Up
Observations |
1. |
Exposed cement bags at Wall 59 had been removed. (Closed) |
|
|
|
|
|
|
|
New Observation |
2. |
The Contractor was
reminded to cover the soil stockpile at Wall 59. |
|
|
|
Reminder |
|
The Contractor was reminded to properly shelter the grouting station
at Wall 59. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |