Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
3 July 2013 |
Time: |
9:00 |
Inspection No.: |
351 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Temporary stockpile of construction waste had
been enclosed at Gate 47. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
The Contractor was reminded to remove the stockpile of construction
materials away from the retained trees at NB 22. |
3. |
The Contractor was reminded to remove the stagnant water within the
construction area at NB 19. |
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
4 July 2013 |
Time: |
14:00 |
Inspection No.: |
352 |
|
Nil |
|
Follow Up
Observations |
1. |
Oil drum placed on the ground at NLK South Ramp
had been removed. (Closed) |
|
|
2. |
The
improperly dumped materials at NLK P10 had been removed from the recycling
bins. (Closed) |
|
|
|
|
|
|
|
|
|
New Observation |
3. |
Stockpile of construction wastes were accumulated at Bridge 12A NA.
The Contractor was reminded to remove the construction waste regularly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
10 July 2013 |
Time: |
14:00 |
Inspection No.: |
353 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Stockpile of construction materials had been
removed away from the retained trees at NB 22.(Closed) |
|
|
2. |
Stagnant
water within the construction area had been removed at NB 19. (Closed) |
|
|
|
|
|
|
|
|
|
New
Observation |
3. |
The Contractor was reminded to remove the general refuse at NB 17. |
. |
Remainder |
4. |
The Contractor was reminded to remove the
stagnant water within the construction area regularly especially during rainy
seasons. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
11 July 2013 |
Time: |
14:00 |
Inspection No.: |
354 |
|
Nil |
|
Follow Up
Observations |
1. |
Stockpile of construction wastes at Bridge 12A NA had been removed. The Contractor was reminded to clear the wastes at regular
intervals.(Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
2. |
The Contractor was reminded to remove the stagnant water within the
drip tray to prevent overflowing at Wall 59. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
17 July 2013 |
Time: |
9:00 |
Inspection No.: |
355 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
General refuse at NB 17 had been removed.(Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
. |
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
18 July 2013 |
Time: |
14:00 |
Inspection No.: |
356 |
|
Nil |
|
Follow Up
Observations |
1. |
The drip tray holding the stagnant water together with the oil drum
had been removed after site clearance. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
24 July 2013 |
Time: |
9:00 |
Inspection No.: |
357 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Oil drum was put on bare ground at Gate 3. The Contractor was reminded
to provide a drip tray to prevent oil leakage. |
|
|
2. |
Sand and soil stockpiles at Gate 3 were not covered. The Contractor
was reminded to cover the stockpiles with tarpaulin. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
25 July 2013 |
Time: |
14:00 |
Inspection No.: |
358 |
|
Nil |
|
Follow Up
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
1. |
General refuse was dumped into the recycling bins at Bridge 12A. The
Contractor was reminded to remove the general refuse and dump only the
recycling materials into the appropriate recycling bins. |
2. |
Stagnant
water was observed within the consturction site at Bridge 12A. The Contractor
was reminded to remove the stagnant water to prevent mosquito breeding. |
3. |
The Contractor was reminded to cover the soil
stockpiles at Bridge 12A with tarpaulin. |
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
31 July 2013 |
Time: |
9:00 |
Inspection No.: |
359 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Drip tray had been provided for the oil drum at
Gate 3. (Closed) |
|
|
|
|
2. |
Soil
stockpiles had been covered with tarpaulin. (Closed) |
|
|
|
|
|
|
|
New
Observation |
3. |
The Contractor was reminded to remove the oil stains found at Bridge
11A. |
|
|
|
|
|
|
|