Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

3 July 2013

Time:

9:00

Inspection No.:

351

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Temporary stockpile of construction waste had been enclosed at Gate 47. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

The Contractor was reminded to remove the stockpile of construction materials away from the retained trees at NB 22.

 

 

3.

The Contractor was reminded to remove the stagnant water within the construction area at NB 19.

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

4 July 2013

Time:

14:00

Inspection No.:

352

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

Oil drum placed on the ground at NLK South Ramp had been removed. (Closed)

 

 

 

 

 

2.

The improperly dumped materials at NLK P10 had been removed from the recycling bins. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

3.

Stockpile of construction wastes were accumulated at Bridge 12A NA. The Contractor was reminded to remove the construction waste regularly.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

10 July 2013

Time:

14:00

Inspection No.:

353

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Stockpile of construction materials had been removed away from the retained trees at NB 22.(Closed)

 

 

2.

Stagnant water within the construction area had been removed at NB 19. (Closed)

 

 

 

 

 

 

 

 

 

 

New Observation

 

3.

The Contractor was reminded to remove the general refuse at NB 17.

 

 

.

Remainder

4.

The Contractor was reminded to remove the stagnant water within the construction area regularly especially during rainy seasons.

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

11 July 2013

Time:

14:00

Inspection No.:

354

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

Stockpile of construction wastes at Bridge 12A NA had been removed. The Contractor was reminded to clear the wastes at regular intervals.(Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

The Contractor was reminded to remove the stagnant water within the drip tray to prevent overflowing at Wall 59.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

17 July 2013

Time:

9:00

Inspection No.:

355

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

General refuse at NB 17 had been removed.(Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

.

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

18 July 2013

Time:

14:00

Inspection No.:

356

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

The drip tray holding the stagnant water together with the oil drum had been removed after site clearance. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

        

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

24 July 2013

Time:

9:00

Inspection No.:

357

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Oil drum was put on bare ground at Gate 3. The Contractor was reminded to provide a drip tray to prevent oil leakage.

 

 

 

 

2.

Sand and soil stockpiles at Gate 3 were not covered. The Contractor was reminded to cover the

stockpiles with tarpaulin.

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

25 July 2013

Time:

14:00

Inspection No.:

358

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

General refuse was dumped into the recycling bins at Bridge 12A. The Contractor was reminded to remove the general refuse and dump only the recycling materials into the appropriate recycling bins.

2.

Stagnant water was observed within the consturction site at Bridge 12A. The Contractor was reminded to remove the stagnant water to prevent mosquito breeding.

3.

The Contractor was reminded to cover the soil stockpiles at Bridge 12A with tarpaulin.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

31 July 2013

Time:

9:00

Inspection No.:

359

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Drip tray had been provided for the oil drum at Gate 3. (Closed)

 

 

 

 

2.

Soil stockpiles had been covered with tarpaulin. (Closed)

 

 

 

 

 

 

 

 

New Observation

 

3.

The Contractor was reminded to remove the oil stains found at Bridge 11A.

 

 

 

 

 

 

 

 

Remarks

 

 

Nil