Appendix I Impact
Daytime Construction Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location
: NM1A (168 Shek Kwu Lung Village G/F- Façade) |
|
|
|
|
|
|
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level,
dB(A) |
Corrected
Construction Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
|
|
|
|
|
|
4-Jul-13 |
10:48 |
61.5 |
63.0 |
58.0 |
64.2 |
61.5 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
1412538 |
60.0 |
|
|
|
|
|
|
|
|
10-Jul-13 |
11:30 |
64.3 |
68.8 |
61.8 |
64.2 |
47.9 |
75 |
N |
|
|
|
61266.8 |
####### |
####### |
61266.8 |
47.9 |
61266.8 |
61.0 |
|
|
|
|
|
|
|
|
16-Jul-13 |
10:35 |
63.8 |
65.2 |
60.1 |
64.2 |
63.8 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
2398833 |
62.0 |
|
|
|
|
|
|
|
|
22-Jul-13 |
14:17 |
64.6 |
67.2 |
62.5 |
64.2 |
54.0 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
54.0 |
253764 |
64.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
60.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Max |
63.8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Min |
47.9 |
|
|
|
|
|
|
|
|
Location
: NM2 (38 Ha Wun Yiu G/F - Free Field) |
|
|
|
|
|
|
|
|
|
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A)* |
Corrected
Construction Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
Leq* |
L10* |
L90* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4-Jul-13 |
11:29 |
68.5 |
70.0 |
65.5 |
68.1 |
57.9 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
57.9 |
622916 |
67.1 |
|
|
|
|
|
|
|
|
10-Jul-13 |
9:50 |
60.3 |
64.8 |
59.6 |
68.1 |
60.3 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
1071519 |
68.1 |
|
|
|
|
|
|
|
|
16-Jul-13 |
10:00 |
67.9 |
69.3 |
65.6 |
68.1 |
67.9 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
6165950 |
69.1 |
|
|
|
|
|
|
|
|
22-Jul-13 |
14:59 |
63.7 |
65.6 |
61.7 |
68.1 |
63.7 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
2344229 |
66.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
64.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Max |
67.9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Min |
57.9 |
|
|
|
|
|
|
* +3dB(A) Façade effect correction included |
|
|
|
|
|
|
|
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
|
|
|
|
|
|
|
|
|
|
If Measured noise level < Baseline
noise level, Corrected noise level = Measured noise level |
|
|
|
|
|
|
|
|
|
|
Appendix I Impact Daytime Construction Noise
Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
Location
: NM3 (Wong Shiu Chi Middle School Rooftop - Façade) |
|
|
|
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level,
dB(A) |
Corrected
Construction Noise Level, dB(A) ** |
Limit Level, dB(A)# |
Exceedance (Y/N) |
|
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
|
|
4-Jul-13 |
11:16 |
65.4 |
67.1 |
63.3 |
64.8 |
56.5 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
56.5 |
447417 |
53.3 |
|
|
10-Jul-13 |
9:45 |
68.6 |
70.0 |
63.1 |
64.8 |
66.3 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
66.3 |
4224408 |
|
|
|
16-Jul-13 |
13:10 |
66.3 |
68.1 |
63.8 |
64.8 |
61.0 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
61.0 |
1245843 |
|
|
|
22-Jul-13 |
10:48 |
65.1 |
66.9 |
63.4 |
64.8 |
53.3 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
53.3 |
215985 |
64.1 |
|
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
Average |
61.9 |
|
|
|
|
|
|
|
|
Max |
66.3 |
|
|
|
|
|
|
|
|
Min |
53.3 |
|
|
|
|
|
|
|
|
|
|
|
Location
: NM4 (Uptown Plaza Block 4 Rooftop - Façade) |
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A) |
Corrected
Construction Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
4-Jul-13 |
10:23 |
63.9 |
65.3 |
61.7 |
67.4 |
63.9 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
2454709 |
67.4 |
|
10-Jul-13 |
10:30 |
67.9 |
69.9 |
62.7 |
67.4 |
58.3 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
58.3 |
670541 |
|
|
16-Jul-13 |
13:00 |
65.2 |
67.1 |
63.3 |
67.4 |
65.2 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
3311311 |
|
|
22-Jul-13 |
9:56 |
64.8 |
66.5 |
62.7 |
67.4 |
64.8 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
3019952 |
66.8 |
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
Average |
63.7 |
|
|
|
|
|
|
|
|
Max |
65.2 |
|
|
|
|
|
Min |
58.3 |
|
|
#
- Limit Level of 70dB(A) applies to education institutes while 65dB(A)
applies during school examination period. |
|
|
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
|
|
|
|
|
|
If Measured noise level < Baseline
noise level, Corrected noise level = Measured noise level |
|
|
|
|
|
|
Appendix I Impact Daytime Construction Noise
Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
Location
: NM5 (The Paragon Clubhouse Rooftop - Façade) |
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A) |
Corrected
Construction Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
|
|
4-Jul-13 |
13:50 |
67.3 |
69.0 |
65.0 |
65.2 |
63.1 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
63.1 |
2059007 |
63.3 |
|
|
10-Jul-13 |
13:15 |
60.9 |
64.2 |
56.8 |
65.2 |
60.9 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
1230269 |
|
|
|
16-Jul-13 |
10:55 |
67.2 |
69.2 |
63.9 |
65.2 |
62.9 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
62.9 |
1936763 |
|
|
|
22-Jul-13 |
15:18 |
62.6 |
64.3 |
61.2 |
65.2 |
62.6 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
1819701 |
62.3 |
|
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
62.5 |
|
|
|
|
|
|
|
|
Max |
63.1 |
|
|
|
|
|
|
|
|
Min |
60.9 |
|
|
Location
: NM6 (PLK Tin Ka Ping Primary School near the entrance - Free Field) |
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A)* |
Corrected
Construction Noise Level, dB(A) ** |
Limit Level, dB(A)# |
Exceedance (Y/N) |
|
|
|
|
|
|
|
Date |
Start Time |
Leq* |
L10* |
L90* |
|
|
|
|
|
|
|
|
4-Jul-13 |
13:48 |
61.8 |
63.4 |
58.7 |
64.5 |
61.8 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
1513561 |
56.2 |
|
|
10-Jul-13 |
13:30 |
65.2 |
68.4 |
61.7 |
64.5 |
56.9 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
56.9 |
492928 |
|
|
|
16-Jul-13 |
11:30 |
59.7 |
61.5 |
55.6 |
64.5 |
59.7 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
933254 |
|
|
|
22-Jul-13 |
11:12 |
62.2 |
63.9 |
60.5 |
64.5 |
62.2 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
1659587 |
64.2 |
|
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
60.6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Max |
62.2 |
|
|
|
|
|
|
|
|
Min |
56.9 |
|
|
Remarks |
|
|
|
|
|
|
|
|
|
* +3dB(A) Façade effect correction included |
|
|
|
|
|
|
|
#
- Limit Level of 70dB(A) applies to education institutes while 65dB(A)
applies during school examination period. |
|
|
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
|
|
|
|
|
|
If Measured noise level < Baseline
noise level, Corrected noise level = Measured noise level |
|
|
|
|
|
|
Appendix I Impact Daytime Construction Noise
Monitoring Results |
|
|
|
|
|
|
|
Location
: NM7 (Riverain Bayside Switch Room Rooftop - Façade) |
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A) |
Corrected
Construction Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
4-Jul-13 |
14:32 |
60.4 |
62.0 |
57.5 |
61.5 |
60.4 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
1096478 |
60.1 |
|
10-Jul-13 |
14:20 |
64.1 |
67.6 |
59.8 |
61.5 |
60.6 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
60.6 |
1157858 |
|
|
16-Jul-13 |
9:43 |
60.5 |
62.7 |
57.6 |
61.5 |
60.5 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
1122018 |
|
|
22-Jul-13 |
13:36 |
64.5 |
66.4 |
62.4 |
61.5 |
61.5 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
61.5 |
1405845 |
59.6 |
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
Average |
60.8 |
|
|
|
|
|
|
|
Max |
61.5 |
|
|
|
|
|
|
|
|
Min |
60.4 |
|
|
Remarks |
|
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
|
|
If Measured noise level < Baseline
noise level, Corrected noise level = Measured noise level |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|