Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
2 May 2013 |
Time: |
14:00 |
Inspection No.: |
333 |
|
Nil |
|
Follow Up
Observations |
1. |
General refuse at Area C had
been removed. (Closed) |
2. |
General refuse in the recycling bins had been
removed and only the recycling materials had been |
|
dumped into the recycling bins. (Closed) |
|
|
|
|
|
|
|
|
|
New Observation |
3. |
The Contractor was reminded to sort and segregate
the construction waste before removal at Area A. |
4. |
Dusty
constrcution materials were exposed at Area A. The Contractor was reminded to
cover the construction materials to avoid emission of fugitive dust. |
5. |
The Contractor was reminded to cover the open
stockpiles of construction materials with tarpaulin. |
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
3 May 2013 |
Time: |
9:15 |
Inspection No.: |
334 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Stagnant water accumulated inside the I-beam at
Gate 3 had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Stagnant water was observed within the
construction area at NB10. The Contractor was reminded to remove the stagnant
waster regularly. |
3. |
The Contractor was reminded to cover the exposed
stockpiles of sands and stones with tarpaulin. |
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
8 May 2013 |
Time: |
14:00 |
Inspection No.: |
335 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Stagnant water observed within the construction
area at NB10 had been removed. (Closed) |
|
|
|
|
2. |
The
exposed stockpiles of sands and stones had been covered with tarpaulin.
(Closed) |
|
|
|
|
|
|
|
New
Observation |
3. |
The Contractor was reminded to clear the refuse
or cover the refuse before removal at Gate 28. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
9 May 2013 |
Time: |
14:00 |
Inspection No.: |
336 |
|
Nil |
|
Follow Up
Observations |
1. |
The construction waste at Area A had been removed.
(Closed) |
2. |
The construction materials at Area A had been
covered with tarpaulin. (Closed) |
|
|
|
|
3. |
The open stockpiles
of construction materials had been covered. (Closed) |
|
|
|
|
|
New Observation |
4. |
Several cans of oil were placed on bare ground at
Bridge 13A. The Contractor was reminded to provide a drip tray to prevent oil
leakage or remove the oil cans if applicable. |
5. |
Stagnant
water was observed within the car wheels at Bridge 15A. The Contractor was
reminded to remove the stagnant water to prevent mosquiro breeding. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
15 May 2013 |
Time: |
9:15 |
Inspection No.: |
337 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Construction waste at Gate 28 had been covered
with tarpaulin. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
16 May 2013 |
Time: |
14:00 |
Inspection No.: |
338 |
|
Nil |
|
Follow Up
Observations |
1. |
Chemicals placed at Bridge 13A had been removed. (Closed) |
2. |
Stagnant
water within the car wheels at Bridge 15A had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
23 May 2013 |
Time: |
9:15 |
Inspection No.: |
339 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
23 May 2013 |
Time: |
14:00 |
Inspection No.: |
340 |
|
Nil |
|
Follow Up
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
1. |
Opened cement bag was placed on bare ground
without being covered at Area NLK P4. The Contractor was reminded to cover
the bag or remove it if applicable. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
29 May 2013 |
Time: |
9:15 |
Inspection No.: |
341 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Stagnant water was observed within the
construction area at Gate 26. The Contractor was reminded to remove the
stagnant water so as to prevent mosquito breeding. |
2. |
The Contractor was reminded to clear the
construction waste accumulated at Gate 26 regularly. |
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
30 May 2013 |
Time: |
14:00 |
Inspection No.: |
342 |
|
Nil |
|
Follow Up Observations |
1. |
Opened cement bag at area NLK P4 had been
removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
2. |
The Contractor was reminded to remove the oil
stains on the ground at NB 42. |
3. |
The
Contractor was reminded to cover the soil stockpiles with tarpaulin at Truck
Sewer. |
|
|
|
|
|
|
|
|
|
|
|
Nil |