Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

2 May 2013

Time:

14:00

Inspection No.:

333

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

General refuse at Area C had been removed. (Closed)

2.

General refuse in the recycling bins had been removed and only the recycling materials had been

 

 

 

 

 

dumped into the recycling bins. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

3.

The Contractor was reminded to sort and segregate the construction waste before removal at Area A.

4.

Dusty constrcution materials were exposed at Area A. The Contractor was reminded to cover the construction materials to avoid emission of fugitive dust.

5.

The Contractor was reminded to cover the open stockpiles of construction materials with tarpaulin.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

3 May 2013

Time:

9:15

Inspection No.:

334

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Stagnant water accumulated inside the I-beam at Gate 3 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Stagnant water was observed within the construction area at NB10. The Contractor was reminded to remove the stagnant waster regularly. 

 

 

3.

The Contractor was reminded to cover the exposed stockpiles of sands and stones with tarpaulin.

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

8 May 2013

Time:

14:00

Inspection No.:

335

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Stagnant water observed within the construction area at NB10 had been removed. (Closed)

 

 

 

 

2.

The exposed stockpiles of sands and stones had been covered with tarpaulin. (Closed)

 

 

 

 

 

 

 

 

New Observation

 

3.

The Contractor was reminded to clear the refuse or cover the refuse before removal at Gate 28.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

9 May 2013

Time:

14:00

Inspection No.:

336

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

The construction waste at Area A had been removed. (Closed)

2.

The construction materials at Area A had been covered with tarpaulin. (Closed)

 

 

 

 

 

 

 

 

3.

The open stockpiles of construction materials had been covered. (Closed)

 

 

 

 

 

 

 

 

 

New Observation

 

4.

Several cans of oil were placed on bare ground at Bridge 13A. The Contractor was reminded to provide a drip tray to prevent oil leakage or remove the oil cans if applicable.

5.

Stagnant water was observed within the car wheels at Bridge 15A. The Contractor was reminded to remove the stagnant water to prevent mosquiro breeding.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

15 May 2013

Time:

9:15

Inspection No.:

337

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Construction waste at Gate 28 had been covered with tarpaulin. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

16 May 2013

Time:

14:00

Inspection No.:

338

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

Chemicals placed at Bridge 13A had been removed. (Closed)

2.

Stagnant water within the car wheels at Bridge 15A had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

23 May 2013

Time:

9:15

Inspection No.:

339

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

23 May 2013

Time:

14:00

Inspection No.:

340

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Opened cement bag was placed on bare ground without being covered at Area NLK P4. The Contractor was reminded to cover the bag or remove it if applicable. 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

29 May 2013

Time:

9:15

Inspection No.:

341

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Stagnant water was observed within the construction area at Gate 26. The Contractor was reminded to remove the stagnant water so as to prevent mosquito breeding.

 

 

 2.

The Contractor was reminded to clear the construction waste accumulated at Gate 26 regularly.

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

30 May 2013

Time:

14:00

Inspection No.:

342

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

Opened cement bag at area NLK P4 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

The Contractor was reminded to remove the oil stains on the ground at NB 42.

3.

The Contractor was reminded to cover the soil stockpiles with tarpaulin at Truck Sewer.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil