Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
5 April 2013 |
Time: |
9:15 |
Inspection No.: |
325 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
5 April 2013 |
Time: |
14:15 |
Inspection No.: |
326 |
|
Nil |
|
Follow Up
Observations |
1. |
Oil stains on the ground had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
10 April 2013 |
Time: |
14:00 |
Inspection No.: |
327 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Cement bags at Area Gate 3 were exposed. The
Contractor was reminded to cover the cement bags properly. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
11 April 2013 |
Time: |
14:15 |
Inspection No.: |
328 |
|
Nil |
|
Follow Up
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
1. |
Construction wastes were placed near the retained
trees at Area LB 2. The Contractor was reminded to remove the wastes and
avoid disposing of the wastes near the retained trees. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
17 April 2013 |
Time: |
9:15 |
Inspection No.: |
329 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Cement bags at Area Gate 3 had been removed.
(Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
18 April 2013 |
Time: |
14:15 |
Inspection No.: |
330 |
|
Nil |
|
Follow Up
Observations |
1. |
Construction wastes placed near the retained
trees at Area LB 2 had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
24 April 2013 |
Time: |
9:15 |
Inspection No.: |
331 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Standing water was observed at Gate 3. The
Contractor was reminded to remove the standing water to prevent mosquito
breeding. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
25 April 2013 |
Time: |
14:00 |
Inspection No.: |
332 |
|
Nil |
|
Follow Up
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
1. |
General refuse was dumped on bare ground at Area
C. The Contractor was reminded to clear the general refuse regularly. |
2. |
General
refuse was found dumped into the recycling bins. The Contractor was reminded
to remove the general refuse and dump only the recylcing materials into the
recycling bins. |
|
|
|
|
|
|
|
|
|
|
|
Nil |