Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

6 March 2013

Time:

15:00

Inspection No.:

317

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

New Observation

Oil stains were observed on the ground at Area NB 19. The Contractor was reminded to remove the oil stains.

 

2.

Stockpiles of dusty materials were exposed without being covered at Area NB 22. The Contractor was reminded to cover the materials with tarpaulin.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

7 March 2013

Time:

14:00

Inspection No.:

318

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Oil was spilled from the construction machine at area Bridge 12A. The Contractor was reminded to remove the oil stains.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

13 March 2013

Time:

9:00

Inspection No.:

319

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Oil stains observed on the ground at Area NB 19 were removed. (Closed)

 

 

2.

Stockpiles of dusty materials at Area NB 22 were covered. (Closed)

 

 

 

 

 

 

 

 

 

 

New Observation

Nil.

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

14 March 2013

Time:

15:00

Inspection No.:

320

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

Oil stains at area Bridge 12A were removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Recycling bins at area Bridge 15A were not labeled. The Contractor was reminded to label the recycling bins properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

20 March 2013

Time:

9:15

Inspection No.:

321

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Turbid water was accumulated around the chemical storage at area Wall 20A. The Contractor was reminded to remove the turbid water.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

21 March 2013

Time:

15:00

Inspection No.:

322

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

Recycling bins at area Bridge 15A were labeled. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

The U-channel at Gate 23 was blocked by some debris. The Contractor was reminded to remove the debris and maintain the U-channel properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

27 March 2013

Time:

9:15

Inspection No.:

323

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Turbid water stored inside the drip tray at Area Wall 20A had been removed. Due to completion of works, the drip tray had also been removed off site. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

28 March 2013

Time:

14:45

Inspection No.:

324

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

1.

Debris accumulated on the U-channel at Gate 23 was removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Some oil leaked out from the excavator at Area Trunk Sewer. The Contractor was reminded to remove the oil stains on the ground. .

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil