Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
6 March 2013 |
Time: |
15:00 |
Inspection No.: |
317 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
1. |
New
Observation Oil stains were
observed on the ground at Area NB 19. The Contractor was reminded to remove
the oil stains. |
2. |
Stockpiles of dusty materials were exposed
without being covered at Area NB 22. The Contractor was reminded to cover
the materials with tarpaulin. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
7 March 2013 |
Time: |
14:00 |
Inspection No.: |
318 |
|
Nil |
|
Follow Up
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
1. |
Oil was spilled from the construction machine at
area Bridge 12A. The Contractor was reminded to remove the oil stains. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
13 March 2013 |
Time: |
9:00 |
Inspection No.: |
319 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Oil stains observed on the ground at Area NB 19 were removed. (Closed) |
|
|
2. |
Stockpiles
of dusty materials at Area NB 22 were covered. (Closed) |
|
|
|
|
|
|
|
|
|
New
Observation Nil. |
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
14 March 2013 |
Time: |
15:00 |
Inspection No.: |
320 |
|
Nil |
|
Follow Up
Observations |
1. |
Oil stains at area Bridge
12A were removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
2. |
Recycling bins at area Bridge 15A were not
labeled. The Contractor was reminded to label the recycling bins properly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
20 March 2013 |
Time: |
9:15 |
Inspection No.: |
321 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Turbid water was accumulated around the chemical
storage at area Wall 20A. The Contractor was reminded to remove the turbid
water. |
|
|
|
|
|
|
|
Nil |
Site Inspection
Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
21 March 2013 |
Time: |
15:00 |
Inspection No.: |
322 |
|
Nil |
|
Follow Up
Observations |
1. |
Recycling bins at area Bridge 15A were labeled. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
2. |
The U-channel at Gate 23 was blocked by some
debris. The Contractor was reminded to remove the debris and maintain the
U-channel properly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
27 March 2013 |
Time: |
9:15 |
Inspection No.: |
323 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Turbid water stored inside the drip tray at Area
Wall 20A had been removed. Due to completion of works, the drip tray had also
been removed off site. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
28 March 2013 |
Time: |
14:45 |
Inspection No.: |
324 |
|
Nil |
|
Follow Up
Observations |
1. |
Debris accumulated on the U-channel at Gate 23
was removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
2. |
Some oil leaked out from the excavator at Area
Trunk Sewer. The Contractor was reminded to remove the oil stains on the
ground. . |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |