Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
6 February 2013 |
Time: |
14:00 |
Inspection No.: |
309 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Broken concretes at Area NB17 had been removed.
(Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Insufficient mitigation measure was observed for
an exposed slope at area TB1 West Abutment. The Contractor was reminded to
cover the exposed slope by tarpaulin sheets properly. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
7 February 2013 |
Time: |
14:00 |
Inspection No.: |
310 |
|
Nil |
|
Follow Up
Observations |
1. |
Label had
been provided for recycling bin of alminium’s can at Area NLKSA. (Closed) |
|
|
2. |
C&D wastes at Area NLKSA had been removed.
(Closed) |
|
|
|
|
|
|
|
|
|
New Observations |
3. |
Soil stockpiles were accumulated without cover at
Area Bridge 15A North Ramp. The Contractor was reminded to cover the soil
stockpiles. |
4. |
C&D wastes were not well sorted at Area
Bridge 15A North Ramp. The Contractor was reminded to properly sort the
C&D wastes. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
15 February 2013 |
Time: |
9:30 |
Inspection No.: |
311 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
The exposed slope at area TB1 West Abutment had
been covered. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
15 February 2013 |
Time: |
14:00 |
Inspection No.: |
312 |
|
Nil |
|
Follow Up
Observations |
1. |
Soil stockpiles at Area Bridge 15A North Ramp had
been covered. (Closed) |
|
|
2. |
C&D wastes at Area Bridge 15A North Ramp had
been sorted. (Closed) |
|
|
|
|
|
|
|
|
|
New Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
20 February 2013 |
Time: |
9:00 |
Inspection No.: |
313 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Mud trails were observed at Gate 33. The Contractor was reminded to implement
preventive measures to avoid the spread of mud trails on the public road. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
21 February 2013 |
Time: |
14:00 |
Inspection No.: |
314 |
|
Nil |
|
Follow Up
Observations |
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
1. |
General wastes were disposed near the river. The
Contractor was reminded to clear the wastes. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
27 February 2013 |
Time: |
9:00 |
Inspection No.: |
315 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
1. |
Mud trail outside site entrance was cleaned at
once. The site entrance had been concrete paved to prevent dusty material
from carrying out to public road. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
28 February 2013 |
Time: |
14:00 |
Inspection No.: |
316 |
|
Nil |
|
Follow Up
Observations |
1. |
General wastes at area Bridge 12A were removed.
(Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |