Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

2 January 2013

Time:

9:00

Inspection No.:

299

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

 

1.

Site haul road at Area TB1 had been dampened. (Closed)

 

 

2.

Breaking tip of breaker at Area TB2 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

3 January 2013

Time:

14:00

Inspection No.:

300

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Oil drums at Area 13A5A had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

C&D wastes were observed accumulated in several site areas. The Contractor was reminded to dispose the C&D wastes regularly and maintain the site cleanliness and tidiness. The Contractor was also reminded to sort the construction waste properly and recycle the sorted construction wastes as regular practice.

3.

Mud trails were observed at the site entrance/exit of Area LB1SA. The Contractor should ensure that wheel washing facilities were operating at all vehicular site entrances/exits to wash off the deposited silt on vehicles’ wheels and bodies before leaving the construction site and combine with cleaning of public roads wherever necessary and practical. Mud trails should be removed as soon as possible. Proper drainage channels/bunds/wheel washing bay should be provided to collect the run-off from wheel washing facilities.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

10 January 2013

Time:

9:30

Inspection No.:

301

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

1.

 

C&D wastes in several site areas had been removed. (Closed)

 

 

2.

Mud trails at the site entrance/exit of Area LB1SA had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

New Observation

 

3.

No dust mitigation measure was provided for broken concrete in Area NLKP10. The Contractor was reminded to provide proper mitigation measures such as provision of water-spraying or covering the broken concrete to provide any fugitive dust generation.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

10 January 2013

Time:

9:00

Inspection No.:

302

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Oil stains were observed on bare ground at Banyan Bridge. The Contractor was reminded to remove the oil stains as soon as possible and handle it as chemical waste.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

16 January 2013

Time:

9:00

Inspection No.:

303

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Oil stains on bare ground at Banyan Bridge had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Mud trails were observed at Gate 3. Although, the mud trails were removed by worker immediately, the Contractor should ensure that wheel washing facilities were operating at all vehicular site entrances/exits to wash off the deposited silt on vehicles’ wheels and bodies and combine with cleaning of public roads wherever necessary and practical.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

17 January 2013

Time:

14:00

Inspection No.:

304

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Broken concrete in Area NLKP10 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Mud trails were observed at site entrance G2. The Contractor should ensure that wheel washing facilities were operating at all vehicular site entrances/exits to wash off the deposited silt on vehicles’ wheels and bodies and combine with cleaning of public roads wherever necessary and practical. The Contractor was also reminded to remove the mud trails.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

23 January 2013

Time:

9:00

Inspection No.:

305

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

1.

Mud tails at Gate 3 were removed and the surface of haul road at Gate 3 was also repaved. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

24 January 2013

Time:

14:00

Inspection No.:

306

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Mud trails at site entrance G2 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

30 January 2013

Time:

9:00

Inspection No.:

307

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Broken concretes were accumulated at Area NB17.  The Contractor was reminded to maintain the surface of broken concretes in wet or cover the broken concretes by tarpaulin sheets.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

31 January 2013

Time:

14:00

Inspection No.:

308

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

1.

No label was provided for recycling bin of alminium’s can at Area NLKSA. The Contractor was reminded to label the recycling bin properly.

2.

C&D wastes were accumulated at Area NLKSA. The Contractor was reminded to remove the C&D wastes regularly.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil