Site Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
2 January 2013 |
Time: |
9:00 |
Inspection No.: |
299 |
|
Nil |
|
Follow Up Observations |
|
|
|
|
1. |
Site haul road at Area TB1 had been
dampened. (Closed) |
|
|
2. |
Breaking
tip of breaker at Area TB2 had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
New Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
3 January 2013 |
Time: |
14:00 |
Inspection No.: |
300 |
|
Nil |
|
Follow
Up Observation |
1. |
Oil drums at Area 13A5A had been
removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
2. |
C&D wastes were observed
accumulated in several site areas. The Contractor was reminded to dispose the
C&D wastes regularly and maintain the site cleanliness and tidiness. The Contractor
was also reminded to sort the construction waste properly and recycle the
sorted construction wastes as regular practice. |
3. |
Mud trails were observed at the site
entrance/exit of Area LB1SA. The Contractor should ensure that wheel washing
facilities were operating at all vehicular site entrances/exits to wash off
the deposited silt on vehicles’ wheels and bodies before leaving the
construction site and combine with cleaning of public roads wherever
necessary and practical. Mud trails should be removed as soon as possible. Proper
drainage channels/bunds/wheel washing bay should be provided to collect the
run-off from wheel washing facilities. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
10 January 2013 |
Time: |
9:30 |
Inspection No.: |
301 |
|
Nil |
|
Follow
Up Observations |
1. |
C&D wastes in several site areas
had been removed. (Closed) |
|
|
2. |
Mud trails at the site entrance/exit
of Area LB1SA had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
New
Observation |
3. |
No dust mitigation measure was
provided for broken concrete in Area NLKP10. The Contractor was reminded to
provide proper mitigation measures such as provision of water-spraying or
covering the broken concrete to provide any fugitive dust generation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
10 January 2013 |
Time: |
9:00 |
Inspection No.: |
302 |
|
Nil |
|
Follow Up Observation |
|
|
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
1. |
Oil stains were observed on bare
ground at Banyan Bridge. The Contractor was reminded to remove the oil stains
as soon as possible and handle it as chemical waste. |
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
16 January 2013 |
Time: |
9:00 |
Inspection No.: |
303 |
|
Nil |
|
Follow Up Observation |
|
|
|
|
1. |
Oil stains on bare ground at Banyan
Bridge had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
2. |
Mud trails were observed at Gate 3.
Although, the mud trails were removed by worker immediately, the Contractor
should ensure that wheel washing facilities were operating at all vehicular
site entrances/exits to wash off the deposited silt on vehicles’ wheels and
bodies and combine with cleaning of public roads wherever necessary and
practical. |
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
17 January 2013 |
Time: |
14:00 |
Inspection No.: |
304 |
|
Nil |
|
Follow
Up Observation |
1. |
Broken concrete in Area NLKP10 had
been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Mud trails were observed at site
entrance G2. The Contractor should ensure that wheel washing facilities were
operating at all vehicular site entrances/exits to wash off the deposited
silt on vehicles’ wheels and bodies and combine with cleaning of public roads
wherever necessary and practical. The Contractor was also reminded to remove
the mud trails. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
23 January 2013 |
Time: |
9:00 |
Inspection No.: |
305 |
|
Nil |
|
Follow Up Observation |
|
|
|
|
1. |
Mud tails at Gate 3 were removed and
the surface of haul road at Gate 3 was also repaved. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
24 January 2013 |
Time: |
14:00 |
Inspection No.: |
306 |
|
Nil |
|
Follow
Up Observation |
1. |
Mud trails at site entrance G2 had
been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
30 January 2013 |
Time: |
9:00 |
Inspection No.: |
307 |
|
Nil |
|
Follow Up Observation |
|
|
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Observation |
1. |
Broken concretes were accumulated at
Area NB17. The Contractor was
reminded to maintain the surface of broken concretes in wet or cover the
broken concretes by tarpaulin sheets. |
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
31 January 2013 |
Time: |
14:00 |
Inspection No.: |
308 |
|
Nil |
|
Follow
Up Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
1. |
No label was provided for recycling bin of alminium’s can at Area NLKSA.
The Contractor was reminded to label the recycling bin properly. |
2. |
C&D wastes were accumulated at
Area NLKSA. The Contractor was reminded to remove the C&D wastes
regularly. |
|
|
|
|
|
|
|
|
|
|
|
Nil |