Appendix
I Impact Daytime
Construction Noise Monitoring Results |
|
¡@ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location
: NM1A (168 Shek Kwu Lung Village G/F- Façade) |
|
¡@ |
|
|
|
|
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
¡@ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
|
|
|
|
|
|
|
|
|
¡@ |
|
|
|
|
|
|
|
¡@ |
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level,
dB(A) |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
|
|
|
|
|
2-Jan-13 |
13:50 |
64.0 |
67.4 |
61.2 |
64.2 |
64.0 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
8-Jan-13 |
10:45 |
63.8 |
65.2 |
61.6 |
64.2 |
63.8 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
14-Jan-13 |
11:30 |
63.8 |
65.5 |
61.5 |
64.2 |
63.8 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
25-Jan-13 |
10:45 |
63.5 |
65.0 |
60.5 |
64.2 |
63.5 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
31-Jan-13 |
10:46 |
63.9 |
65.5 |
61.7 |
64.2 |
63.9 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Average |
63.8 |
|
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Max |
64.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Min |
63.5 |
|
|
|
|
|
|
|
Location
: NM2 (38 Ha Wun Yiu G/F - Free Field) |
|
¡@ |
|
|
|
|
|
|
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
¡@ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
|
|
|
|
|
|
|
|
|
¡@ |
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A)* |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
Leq* |
L10* |
L90* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2-Jan-13 |
13:05 |
63.6 |
67.0 |
60.3 |
68.1 |
63.6 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
8-Jan-13 |
11:29 |
67.3 |
69.1 |
65.7 |
68.1 |
67.3 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
14-Jan-13 |
13:15 |
67.6 |
69.5 |
65.0 |
68.1 |
67.6 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
25-Jan-13 |
13:08 |
66.3 |
68.3 |
61.6 |
68.1 |
66.3 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
31-Jan-13 |
11:27 |
67.2 |
69.1 |
64.6 |
68.1 |
67.2 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Average |
66.6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Max |
67.6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Min |
63.6 |
|
|
|
|
|
* +3dB(A) Façade effect correction
included |
|
¡@ |
|
|
|
|
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
¡@ |
|
|
|
|
|
|
|
|
If Measured noise level
< Baseline noise level, Corrected noise level = Measured noise level |
¡@ |
|
|
|
|
|
|
|
|
Appendix I Impact Daytime
Construction Noise Monitoring Results |
|
¡@ |
|
|
|
|
|
|
|
|
|
Location
: NM3 (Wong Shiu Chi Middle School Rooftop - Façade) |
|
¡@ |
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
¡@ |
|
|
|
|
|
|
¡@ |
|
|
|
|
|
|
¡@ |
|
|
|
|
|
¡@ |
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level,
dB(A) |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A)# |
Exceedance (Y/N) |
|
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
|
|
2-Jan-13 |
10:30 |
61.2 |
63.1 |
58.6 |
64.8 |
61.2 |
70 |
N |
|
|
|
|
|
|
|
8-Jan-13 |
10:43 |
65.6 |
68.1 |
63.7 |
64.8 |
57.9 |
70 |
N |
|
|
|
|
|
|
|
14-Jan-13 |
10:59 |
63.4 |
65.6 |
60.3 |
64.8 |
63.4 |
70 |
N |
|
|
|
|
|
|
|
25-Jan-13 |
10:53 |
65.6 |
67.3 |
61.8 |
64.8 |
57.9 |
70 |
N |
|
|
|
|
|
|
|
31-Jan-13 |
13:11 |
65.2 |
67.5 |
63.5 |
64.8 |
54.6 |
70 |
N |
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
¡@ |
|
Average |
60.0 |
|
|
|
|
|
¡@ |
|
Max |
63.4 |
|
|
|
|
|
¡@ |
|
Min |
54.6 |
|
|
|
|
¡@ |
|
|
|
|
Location
: NM4 (Uptown Plaza Block 4 Rooftop - Façade) |
|
¡@ |
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
¡@ |
|
|
|
|
|
|
¡@ |
|
|
|
|
¡@ |
|
¡@ |
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A) |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
2-Jan-13 |
11:15 |
59.8 |
60.9 |
58.1 |
67.4 |
59.8 |
75 |
N |
|
|
|
|
|
|
8-Jan-13 |
9:55 |
64.0 |
66.1 |
62.3 |
67.4 |
64.0 |
75 |
N |
|
|
|
|
|
|
14-Jan-13 |
10:13 |
65.2 |
66.8 |
63.2 |
67.4 |
65.2 |
75 |
N |
|
|
|
|
|
|
25-Jan-13 |
10:05 |
67.2 |
69.1 |
63.7 |
67.4 |
67.2 |
75 |
N |
|
|
|
|
|
|
31-Jan-13 |
14:03 |
66.5 |
68.5 |
63.0 |
67.4 |
66.5 |
75 |
N |
|
|
|
|
|
|
|
|
|
¡@ |
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
¡@ |
|
Average |
65.2 |
|
|
|
|
|
¡@ |
|
Max |
67.2 |
|
|
¡@ |
|
Min |
59.8 |
|
#
- Limit Level of 70dB(A) applies to education institutes while 65dB(A)
applies during school examination period. |
¡@ |
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
¡@ |
|
|
|
|
If Measured noise level
< Baseline noise level, Corrected noise level = Measured noise level |
¡@ |
|
|
|
|
Appendix I Impact Daytime
Construction Noise Monitoring Results |
|
¡@ |
|
|
|
|
|
|
|
|
|
Location
: NM5 (The Paragon Clubhouse Rooftop - Façade) |
|
¡@ |
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
¡@ |
|
|
|
|
¡@ |
|
|
|
|
¡@ |
|
¡@ |
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A) |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
|
|
2-Jan-13 |
13:45 |
63.0 |
65.9 |
61.2 |
65.2 |
63.0 |
75 |
N |
|
|
|
|
|
|
|
8-Jan-13 |
14:27 |
63.8 |
65.0 |
62.0 |
65.2 |
63.8 |
75 |
N |
|
|
|
|
|
|
|
14-Jan-13 |
13:05 |
66.1 |
67.6 |
63.9 |
65.2 |
58.8 |
75 |
N |
|
|
|
|
|
|
|
25-Jan-13 |
13:03 |
66.7 |
68.0 |
63.5 |
65.2 |
61.4 |
75 |
N |
|
|
|
|
|
|
|
31-Jan-13 |
13:23 |
65.8 |
67.1 |
63.9 |
65.2 |
56.9 |
75 |
N |
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Average |
61.5 |
|
|
|
|
|
¡@ |
|
Max |
63.8 |
|
|
|
|
|
¡@ |
|
Min |
56.9 |
|
Location
: NM6 (PLK Tin Ka Ping Primary School near the entrance - Free Field) |
|
¡@ |
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
¡@ |
|
|
|
|
¡@ |
|
|
|
|
¡@ |
|
¡@ |
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A)* |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A)# |
Exceedance (Y/N) |
|
|
|
|
|
|
|
Date |
Start Time |
Leq* |
L10* |
L90* |
|
|
|
|
|
|
|
|
2-Jan-13 |
14:40 |
64.2 |
67.9 |
61.6 |
64.5 |
64.2 |
70 |
N |
|
|
|
|
|
|
|
8-Jan-13 |
13:40 |
61.9 |
63.5 |
59.5 |
64.5 |
61.9 |
70 |
N |
|
|
|
|
|
|
|
14-Jan-13 |
13:55 |
61.8 |
64.1 |
58.7 |
64.5 |
61.8 |
70 |
N |
|
|
|
|
|
|
|
25-Jan-13 |
13:50 |
65.0 |
67.2 |
59.9 |
64.5 |
55.4 |
70 |
N |
|
|
|
|
|
|
|
31-Jan-13 |
14:05 |
66.3 |
68.1 |
63.2 |
64.5 |
61.6 |
70 |
N |
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Average |
61.8 |
|
|
|
|
|
|
|
|
|
|
|
¡@ |
|
Max |
64.2 |
|
|
|
|
|
¡@ |
|
Min |
55.4 |
|
Remarks |
|
|
|
¡@ |
|
|
|
|
* +3dB(A) Façade effect correction
included |
|
¡@ |
|
|
|
|
#
- Limit Level of 70dB(A) applies to education institutes while 65dB(A)
applies during school examination period. |
¡@ |
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
¡@ |
|
|
|
|
If Measured noise level
< Baseline noise level, Corrected noise level = Measured noise level |
¡@ |
|
|
|
|
Appendix I Impact Daytime
Construction Noise Monitoring Results |
|
¡@ |
|
|
|
|
Location
: NM7 (Riverain Bayside Switch Room Rooftop - Façade) |
|
¡@ |
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
¡@ |
|
|
|
|
¡@ |
|
|
|
|
¡@ |
|
¡@ |
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A) |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
2-Jan-13 |
13:10 |
63.3 |
68.4 |
60.6 |
61.5 |
58.6 |
75 |
N |
|
|
|
|
|
|
8-Jan-13 |
13:32 |
63.3 |
65.2 |
61.0 |
61.5 |
58.6 |
75 |
N |
|
|
|
|
|
|
14-Jan-13 |
10:47 |
63.2 |
64.5 |
60.5 |
61.5 |
58.3 |
75 |
N |
|
|
|
|
|
|
25-Jan-13 |
14:05 |
63.7 |
65.5 |
61.0 |
61.5 |
59.7 |
75 |
N |
|
|
|
|
|
|
31-Jan-13 |
15:00 |
63.0 |
65.0 |
60.0 |
61.5 |
57.7 |
75 |
N |
|
|
|
|
|
|
|
|
|
¡@ |
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
¡@ |
|
Average |
58.6 |
|
|
|
|
¡@ |
|
Max |
59.7 |
|
|
|
|
|
¡@ |
|
Min |
57.7 |
|
Remarks |
|
|
|
¡@ |
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
¡@ |
|
If Measured noise level
< Baseline noise level, Corrected noise level = Measured noise level |
¡@ |
|
|
|
|
|
¡@ |
|
|
|
|
|
¡@ |
|
|
|
|
|
¡@ |
|
|
|
|
|
¡@ |
|
|
|
|
|
¡@ |
|
|
|
|
|
¡@ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|