Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

6 December 2012

Time:

14:00

Inspection No.:

291

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Broken concretes and stockpile of sands at Area NLKSA were covered by tarpaulin sheet. (Closed)

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Muddy water was observed accumulated inside the u-channel at Area W46 and likely flowing outside to the public drain. The Contractor was reminded to properly maintain and review the drainage systems provided within works area and ensure that the muddy water was properly desilted prior to discharging to public drains. Any untreated water should be avoided from flowing to public drains.

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

7 December 2012

Time:

14:00

Inspection No.:

292

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Chemical container at Area NB19 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Stagnant water was accumulated at Area NB19. The Contractor was reminded to remove the stagnant water regularly.

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

12 December 2012

Time:

9:00

Inspection No.:

293

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Stagnant water at Area NB19 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

Silt was accumulated at the site boundary of Gate 26 and public road. The Contractor was reminded to remove the silt as soon as possible to avoid any silty water discharging to nearby gully. The Contractor was also reminded to maintain the sandbag bunding properly to prevent surface runoff from construction work flowing outside the work area and discharging to public drain. The Contractor was recommended to review and maintain the effectiveness of sandbag bunding regularly.

 

 

 

3.

Broken concretes were accumulated at TB1 without proper dust mitigation measure. The Contractor was reminded to dampen the broken concretes or cover the broken concretes by impervious sheet properly to prevent any fugitive dust generation.

 

 

 

Reminder

 

4.

The Contractor was reminded to provide continuously water spraying for all breaking activities on site.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

13 December 2012

Time:

14:00

Inspection No.:

294

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

The discharging outlet of the u-channel at Area W46 had been blocked. (Closed)

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

Chemical containers were placed on ground without providing drip trays at Trunk Sewer Manhole (STS 10_160-170). The Contractor was reminded to provide drip trays for all chemical containers or oil drums to prevent any chemical / oil leakage.

 

3.

Stockpile of sand was accumulated at Area NB42 without proper dust mitigation measure. The Contractor was reminded to dampen the stockpile or cover the stockpile by impervious sheet properly to prevent any fugitive dust generation.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

19 December 2012

Time:

9:00

Inspection No.:

295

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

 

1.

Silt at the site boundary of Gate 26 and public road had been removed. (Closed)

 

 

 

 

2.

Mitigation measure was provided for broken concretes at TB1. (Closed)

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

20 December 2012

Time:

13:30

Inspection No.:

296

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

1.

 

Chemical containers at Trunk Sewer Manhole (STS 10_160-170) had been removed. (Closed)

 

 

2.

Stockpile of sand at Area NB42 had been covered. (Closed)

 

 

 

 

 

 

New Observations

 

3.

Debris and oily water were accumulated inside the drip tray of oil drums at Area NLK P3. The Contractor was reminded to remove the debris and oily water and handle it as chemical wastes. The Contractor was also reminded to provide a larger size of drip tray with sufficient capacity for the oil drums.

 

 

4.

Mud trails were observed at the site entrance/exit of Area NLK South Ramp. The Contractor should ensure that wheel washing facilities were operating at all vehicular site entrances/exits to wash off the deposited silt on vehicles’ wheels and bodies before leaving the construction site and combine with cleaning of public roads wherever necessary and practical. Mud trails should be removed as soon as possible. Proper drainage channels/bunds/wheel washing bay should be provided to collect the run-off from wheel washing facilities.

 

 

5.

Breaking tip of breaker was found placed on bare ground at Area NLK South Ramp. The Contractor was reminded to place the breaking tip onto the tarpaulin sheet to avoid oil leakage from the breaking tip to the ground.

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

27 December 2012

Time:

9:00

Inspection No.:

297

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

1.

Site haul road at Area TB1 was observed in dry condition. Although, no vehicle was traveling on the site haul road during the site inspection, the Contractor was reminded to dampen the site haul road and maintain the road surface wet to prevent any fugitive dust generation.

 

 

2.

Breaking tip of breaker was found placed on bare ground at Area TB2. The Contractor was reminded to place the breaking tip onto the tarpaulin sheet to avoid oil leakage from the breaking tip to the ground.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

27 December 2012

Time:

14:00

Inspection No.:

298

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

1.

 

The oil drums and drip tray at Area NLK P3 had been removed. (Closed)

 

 

2.

Mud trails at the site entrance/exit of Area NLK South Ramp had been removed. However, the Contractor should ensure that wheel washing facilities were operating at all vehicular site entrances/exits to wash off the deposited silt on vehicles’ wheels and bodies before leaving the construction site and combine with cleaning of public roads wherever necessary and practical. Proper drainage channels/bunds/wheel washing bay should be also provided to collect the run-off from wheel washing facilities.  (Closed)

 

 

 

 

3.

Breaking tip of breaker at Area NLK South Ramp had been removed. (Closed)

 

 

 

 

 

 

New Observation

 

4.

Oil drums were observed placed on the ground at Area 13A5A. The Contractor was reminded to provide drip trays for all oil drums on site to prevent any oil leakage.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil