Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
1 November 2012 |
Time: |
14:00 |
Inspection No.: |
282 |
|
Nil |
|
Follow Up
Observations |
1. |
Stagnant water at Area W49 had been removed.
(Closed) |
2. |
Stockpiles at Area W56B had been
covered by tarpaulin sheet after work. (Closed) |
|
|
|
New Observation Nil. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
7 November 2012 |
Time: |
14:00 |
Inspection No.: |
283 |
|
Nil |
|
Follow Up
Observation |
|
Nil. |
|
|
|
|
|
New Observation |
1. |
Breaking tip of breaker was
found placed on bare ground at Area NLKSA. The Contractor was reminded to
place the breaking tip onto the tarpaulin sheet to avoid oil leakage from the
breaking tip to the ground. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
8 November
2012 |
Time: |
14:00 |
Inspection No.: |
284 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
A stock of cement bags at Area NB20 had been
covered by tarpaulin sheet. (Closed) |
|
|
2. |
Stagnant
water at NB20 near the site entrance/exit had been removed. (Closed) |
|
|
|
|
|
New
Observation |
3. |
Soil stockpiles were accumulated near the
receiving pit. The Contractor was reminded to cover the soil stockpile by
tarpaulin sheet properly. |
|
|
|
Reminder |
4. |
The Contractor was reminded to provide water
spraying for site haul road and soil stockpile regularly to prevent any
fugitive dust emission. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
14 November
2012 |
Time: |
9:00 |
Inspection No.: |
285 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Soil stockpiles near the receiving pit had been
covered by tarpaulin sheet. (Closed) |
|
|
|
|
|
|
|
|
|
New
Observations |
2. |
Broken Sandbags were observed at Area NB19. The
Contractor was reminded to replace the broken sandbags. |
3. |
C&D wastes were accumulated at Gate 30. The
Contractor was reminded to remove the C&D waste regularly. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
15 November 2012 |
Time: |
14:00 |
Inspection No.: |
286 |
|
Nil |
|
Follow Up
Observation |
1. |
Breaking tip of
breaker placed on bare ground at Area NLKSA had been removed. (Closed) |
|
|
|
New Observations |
2. |
C&D wastes and general
refuses were accumulated at Tai Wo West services road and Area NLKNA. The
Contractor was reminded to remove the C&D wastes regularly and maintain
the site tidiness and cleanliness. |
3. |
Silt from
construction site was observed accumulated on haul road at Area NB42. The
Contractor was reminded to provide proper mitigation measures (e.g.
bunds/sandbags at site work areas) to prevent any silt or silty water running
off from the construction site to the haul road and nearby public drains.
Silt on the haul road should be removed as soon as possible. The Contractor
was also reminded to maintain the haul road in clean condition. |
4. |
The Contractor was
reminded to cover the broken concretes and stockpiles at Hong Lok Yuen road
by tarpaulin sheets after works to prevent any fugitive dust generation. |
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
21 November
2012 |
Time: |
9:00 |
Inspection No.: |
287 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Broken Sandbags at Area NB19 had been replaced.
(Closed) |
|
|
2. |
C&D
wastes at Gate 30 had been removed. (Closed) |
|
|
|
|
|
New
Observations |
3. |
Broken concretes were accumulated at New Banyan
Bridge. The Contractor was reminded to spray the broken concretes with water
or cover the broken concretes by impervious sheet properly to prevent any
fugitive dust generation. |
4. |
C&D wastes were accumulated at Area NB6. The
Contractor was reminded to remove the C&D waste more frequently and
maintain the site cleanliness and tidiness. |
|
|
5. |
Stagnant waters were accumulated inside the tray
and I-joist at Gate 3. The Contractor was reminded to remove the stagnant
water regularly. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
22 November 2012 |
Time: |
14:00 |
Inspection No.: |
288 |
|
Nil |
|
Follow Up
Observations |
1. |
C&D wastes and
general refuses at Tai Wo West services road and Area NLKNA had been removed. (Closed) |
2. |
Silt on haul road
at Area NB42 had been removed. However, the Contractor was reminded to
provide proper mitigation measures (e.g. bunds/sandbags at site work areas)
to prevent any silt or silty water running off from the construction site to
the haul road and nearby public drains. The Contractor was also reminded to
maintain the haul road in clean condition. (Closed) |
3. |
Broken concretes
and stockpiles at Hong Lok Yuen road had been covered by tarpaulin sheets.
(Closed) |
|
|
|
New Observations |
4. |
Mud trails were observed near the site
entrance/exit at Gate 11 and Gate 15 and wheel washing facility at Gate 15
was also observed malfunction. The Contractor was reminded to repair the
wheel washing facility as soon as possible and provide proper wheel washing facility
during the repairing period. The Contractor should ensure that wheel washing
facilities were operating at all vehicular site entrances/exits to wash off
the deposited silt on vehicles’ wheels and bodies and combine with cleaning
of public roads wherever necessary and practical. The Contractor was
recommended to provide a maintenance schedule for all wheel washing
facilities on site. |
5. |
Silts were accumulated in wheel washing bays at
Gate 11 and Gate 15 and u-channel connecting to sedimentation tank at Gate
15. The Contractor was reminded to remove the silt from wheel washing bays
and u-channel more frequently. |
6. |
C&D wastes were accumulated at Area RWB12B.
The Contractor was reminded to remove the C&D waste regularly and
maintain the site cleanliness and tidiness. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
28 November
2012 |
Time: |
9:00 |
Inspection No.: |
289 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Broken concretes at New Banyan Bridge had been
removed. (Closed) |
|
|
2. |
C&D
wastes at Area NB6 had been removed. (Closed) |
|
|
3. |
Stagnant
waters inside the tray and I-joist at Gate 3 had been removed. (Closed) |
|
|
|
New
Observation |
4. |
No drip tray provided for chemical container was
observed at Area NB19. The Contractor was reminded to provide drip trays for
all oil drums / chemical containers on site to prevent any oil / chemical
leakage. The Contractor was also reminded to label all chemical containers properly. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
29 November 2012 |
Time: |
14:00 |
Inspection No.: |
290 |
|
Nil |
|
Follow Up
Observations |
1. |
Mud trails near the site
entrance/exit at Gate 11 and Gate 15 had been removed and wheel washing
facility at Gate 15 was operating. (Closed) |
2. |
Silts in wheel washing bays at Gate 11 and Gate
15 and u-channel connecting to sedimentation tank at Gate 15 had been removed. (Closed) |
3. |
C&D wastes at Area RWB12B had been removed.
(Closed) |
|
|
|
New Observation |
4. |
Broken concretes and stockpile of sands were
placed at Area NLKSA without mitigation measure. The Contractor was reminded
to cover the broken concretes and stockpile of sands by tarpaulin sheets
properly to prevent any silty water surface runoff to nearby public road due
to rainfall. |
|
|
|
|
|
|
|
Nil |