Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

1 November 2012

Time:

14:00

Inspection No.:

282

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

1.

 

Stagnant water at Area W49 had been removed. (Closed)

 

2.

Stockpiles at Area W56B had been covered by tarpaulin sheet after work. (Closed)

 

 

 

 

 

New Observation

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

7 November 2012

Time:

14:00

Inspection No.:

283

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

New Observation

 

1.

Breaking tip of breaker was found placed on bare ground at Area NLKSA. The Contractor was reminded to place the breaking tip onto the tarpaulin sheet to avoid oil leakage from the breaking tip to the ground.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

8 November 2012

Time:

14:00

Inspection No.:

284

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

A stock of cement bags at Area NB20 had been covered by tarpaulin sheet. (Closed)

 

 

 

2.

Stagnant water at NB20 near the site entrance/exit had been removed. (Closed)

 

 

 

 

 

 

New Observation

 

3.

Soil stockpiles were accumulated near the receiving pit. The Contractor was reminded to cover the soil stockpile by tarpaulin sheet properly.

 

 

 

 

Reminder

 

4.

The Contractor was reminded to provide water spraying for site haul road and soil stockpile regularly to prevent any fugitive dust emission.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

14 November 2012

Time:

9:00

Inspection No.:

285

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Soil stockpiles near the receiving pit had been covered by tarpaulin sheet. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

Broken Sandbags were observed at Area NB19. The Contractor was reminded to replace the broken sandbags.

3.

C&D wastes were accumulated at Gate 30. The Contractor was reminded to remove the C&D waste regularly.  

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

15 November 2012

Time:

14:00

Inspection No.:

286

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Breaking tip of breaker placed on bare ground at Area NLKSA had been removed. (Closed)

 

 

 

 

 

New Observations

 

2.

C&D wastes and general refuses were accumulated at Tai Wo West services road and Area NLKNA. The Contractor was reminded to remove the C&D wastes regularly and maintain the site tidiness and cleanliness.

 

3.

Silt from construction site was observed accumulated on haul road at Area NB42. The Contractor was reminded to provide proper mitigation measures (e.g. bunds/sandbags at site work areas) to prevent any silt or silty water running off from the construction site to the haul road and nearby public drains. Silt on the haul road should be removed as soon as possible. The Contractor was also reminded to maintain the haul road in clean condition.

4.

The Contractor was reminded to cover the broken concretes and stockpiles at Hong Lok Yuen road by tarpaulin sheets after works to prevent any fugitive dust generation.

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

21 November 2012

Time:

9:00

Inspection No.:

287

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Broken Sandbags at Area NB19 had been replaced. (Closed)

 

 

 

2.

C&D wastes at Gate 30 had been removed. (Closed)

 

 

 

 

 

 

New Observations

 

3.

Broken concretes were accumulated at New Banyan Bridge. The Contractor was reminded to spray the broken concretes with water or cover the broken concretes by impervious sheet properly to prevent any fugitive dust generation.

 

4.

C&D wastes were accumulated at Area NB6. The Contractor was reminded to remove the C&D waste more frequently and maintain the site cleanliness and tidiness.  

 

 

5.

Stagnant waters were accumulated inside the tray and I-joist at Gate 3. The Contractor was reminded to remove the stagnant water regularly.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

22 November 2012

Time:

14:00

Inspection No.:

288

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

1.

 

C&D wastes and general refuses at Tai Wo West services road and Area NLKNA had been removed. (Closed)

 

2.

Silt on haul road at Area NB42 had been removed. However, the Contractor was reminded to provide proper mitigation measures (e.g. bunds/sandbags at site work areas) to prevent any silt or silty water running off from the construction site to the haul road and nearby public drains. The Contractor was also reminded to maintain the haul road in clean condition. (Closed)

3.

Broken concretes and stockpiles at Hong Lok Yuen road had been covered by tarpaulin sheets. (Closed)

 

 

 

 

New Observations

 

4.

Mud trails were observed near the site entrance/exit at Gate 11 and Gate 15 and wheel washing facility at Gate 15 was also observed malfunction. The Contractor was reminded to repair the wheel washing facility as soon as possible and  provide proper wheel washing facility during the repairing period. The Contractor should ensure that wheel washing facilities were operating at all vehicular site entrances/exits to wash off the deposited silt on vehicles’ wheels and bodies and combine with cleaning of public roads wherever necessary and practical. The Contractor was recommended to provide a maintenance schedule for all wheel washing facilities on site.

5.

Silts were accumulated in wheel washing bays at Gate 11 and Gate 15 and u-channel connecting to sedimentation tank at Gate 15. The Contractor was reminded to remove the silt from wheel washing bays and u-channel more frequently.

6.

C&D wastes were accumulated at Area RWB12B. The Contractor was reminded to remove the C&D waste regularly and maintain the site cleanliness and tidiness.

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

28 November 2012

Time:

9:00

Inspection No.:

289

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Broken concretes at New Banyan Bridge had been removed. (Closed)

 

 

 

2.

C&D wastes at Area NB6 had been removed. (Closed)

 

 

 

3.

Stagnant waters inside the tray and I-joist at Gate 3 had been removed. (Closed)

 

 

 

 

New Observation

 

4.

No drip tray provided for chemical container was observed at Area NB19. The Contractor was reminded to provide drip trays for all oil drums / chemical containers on site to prevent any oil / chemical leakage. The Contractor was also reminded to label all chemical containers properly.

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

29 November 2012

Time:

14:00

Inspection No.:

290

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

1.

 

Mud trails near the site entrance/exit at Gate 11 and Gate 15 had been removed and wheel washing facility at Gate 15 was operating. (Closed)

 

 

2.

Silts in wheel washing bays at Gate 11 and Gate 15 and u-channel connecting to sedimentation tank at Gate 15 had been removed. (Closed)

 

3.

C&D wastes at Area RWB12B had been removed. (Closed)

 

 

 

 

 

New Observation

 

4.

Broken concretes and stockpile of sands were placed at Area NLKSA without mitigation measure. The Contractor was reminded to cover the broken concretes and stockpile of sands by tarpaulin sheets properly to prevent any silty water surface runoff to nearby public road due to rainfall.

 

 

 

 

 

 

 

 

Remarks

 

 

Nil