Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

3 October 2012

Time:

9:00

Inspection No.:

273

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Broken sandbags near the entrance of Gate 26 had been replaced. (Closed)

 

2.

Drip tray had been provided for Oil drums at New Banyan West Bridge. (Closed)

 

 

 

 

 

 

 

 

New Observations

 

3.

Silt was accumulated near the gully at Area NB16. Although, sandbags were observed provided at the gully, the Contractor was reminded to remove the silt accumulated near the gully /u-channel and provide sufficient mitigation measure (such as covering the gullies and other relevant measures) to prevent any silty water runoff to public drain due to rainfall.

4.

Excavated mud was accumulated inside a drip tray underneath an air compressor at Area NB16. The Contractor was requested to remove the mud inside the drip tray and handle it as chemical wastes.

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

4 October 2012

Time:

14:00

Inspection No.:

274

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Oily water inside the drip trays at Area W45 had been removed. (Closed)

 

 

 

 

 

 

 

2.

New Observation

 

Breaking tip of breaker was found placed on bare ground at Area NLKSA. The Contractor was reminded to place the breaking tip onto the tarpaulin sheet to avoid the oil leaked from the breaking tip to the ground.

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

11 October 2012

Time:

14:00

Inspection No.:

275

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Silt near the gully at Area NB16 had been removed. (Closed)

 

2.

Excavated mud inside a drip tray underneath an air compressor at Area NB16 had been removed. (Closed)

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

12 October 2012

Time:

14:00

Inspection No.:

276

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Breaking tip of breaker on bare ground at Area NLKSA had been removed. (Closed)

 

 

 

 

 

 

 

2.

New Observation

 

Insufficient dust mitigation measure for broken concrete storage & concreting area next to pedestrian bridge at Gate 15 was observed. The Contractor was reminded to provide proper mitigation measures (such as erection tarpaulin sheet at work areas, covering / dampening of stockpiles and broken concrete) to prevent any dust emission generation and cause the air nuisance to public.

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

17 October 2012

Time:

9:00

Inspection No.:

277

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

18 October 2012

Time:

14:00

Inspection No.:

278

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Dust screen had been erected next to pedestrian bridge at Gate 15. (Closed)

 

 

 

 

 

 

 

2.

New Observation

 

General refuse and C&D waste were accumulated at NB 44. The Contractor was reminded to remove the general refuse and C&D waste regularly and maintain the site tidiness and cleanness.

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

24 October 2012

Time:

9:00

Inspection No.:

279

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Mud trails at the site entrance/exit at Gate 26 were observed. Although, the mud trails were removed by worker immediately, the Contractor should ensure that wheel washing facilities were operating at all vehicular site entrances/exits to wash off the deposited silt on vehicles’ wheels and bodies and combine with cleaning of public roads wherever necessary and practical. Proper drainage channels/bunds/wheel washing bay should be provided to collect the run-off from wheel washing facilities.

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

26 October 2012

Time:

14:00

Inspection No.:

280

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

General refuse and C&D waste at NB 44 had been removed. (Closed)

 

 

 

 

 

 

 

2.

New Observations

 

Stagnant water was accumulated at Area W49. The Contractor was reminded to remove the stagnant water more frequently and maintain the drainage system properly.

3.

The Contractor was reminded to cover the stockpiles at Area W56B by tarpaulin sheet after work.

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

31 October 2012

Time:

9:00

Inspection No.:

281

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Site entrance and public roads are cleaned regularly. Haul road at Gate 26 had been paved by concrete and bunds at the site entrance/exit at Gate 26 had also been provided. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

Improper covering for a stock of cement bags (more than 20 bags) was observed at Area NB20. The Contractor was reminded to properly cover every stock of more than 20 bags of cement / dry PFA by impervious sheeting or placed in an area sheltered on the top and the 3 sides.

3.

Stagnant water was accumulated at NB20 near the site entrance/exit. The Contractor was reminded to remove the stagnant water regularly.

 

 

 

 

 

 

 

Remarks

 

 

Nil