Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
3 October
2012 |
Time: |
9:00 |
Inspection No.: |
273 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Broken sandbags near the entrance of Gate 26 had
been replaced. (Closed) |
2. |
Drip
tray had been provided for Oil drums at New Banyan West Bridge. (Closed) |
|
|
|
|
|
|
|
New
Observations |
3. |
Silt was accumulated near the gully at Area NB16.
Although, sandbags were observed provided at the gully, the Contractor was
reminded to remove the silt accumulated near the gully /u-channel and provide
sufficient mitigation measure (such as covering the gullies and other
relevant measures) to prevent any silty water runoff to public drain due to
rainfall. |
4. |
Excavated mud was accumulated inside a drip tray
underneath an air compressor at Area NB16. The Contractor was requested to
remove the mud inside the drip tray and handle it as chemical wastes. |
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
4 October 2012 |
Time: |
14:00 |
Inspection No.: |
274 |
|
Nil |
|
Follow Up
Observation |
1. |
Oily water inside the drip trays at Area W45 had
been removed. (Closed) |
|
|
|
|
2. |
New Observation Breaking tip of breaker was found placed on bare
ground at Area NLKSA. The Contractor was reminded to place the breaking tip
onto the tarpaulin sheet to avoid the oil leaked from the breaking tip to the
ground. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
11 October
2012 |
Time: |
14:00 |
Inspection No.: |
275 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Silt near the gully at Area NB16 had been
removed. (Closed) |
2. |
Excavated
mud inside a drip tray underneath an air compressor at Area NB16 had been
removed. (Closed) |
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
12 October 2012 |
Time: |
14:00 |
Inspection No.: |
276 |
|
Nil |
|
Follow Up
Observation |
1. |
Breaking tip of breaker on bare ground at Area
NLKSA had been removed. (Closed) |
|
|
|
|
2. |
New Observation Insufficient dust mitigation measure for broken
concrete storage & concreting area next to pedestrian bridge at Gate 15
was observed. The Contractor was reminded to provide proper mitigation
measures (such as erection tarpaulin sheet at work areas, covering /
dampening of stockpiles and broken concrete) to prevent any dust emission
generation and cause the air nuisance to public. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
17 October
2012 |
Time: |
9:00 |
Inspection No.: |
277 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
18 October 2012 |
Time: |
14:00 |
Inspection No.: |
278 |
|
Nil |
|
Follow Up
Observation |
1. |
Dust screen had been erected next to pedestrian
bridge at Gate 15. (Closed) |
|
|
|
|
2. |
New Observation General refuse and C&D waste were accumulated
at NB 44. The Contractor was reminded to remove the general refuse and
C&D waste regularly and maintain the site tidiness and cleanness. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
24 October
2012 |
Time: |
9:00 |
Inspection No.: |
279 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Mud trails at the site entrance/exit at Gate 26
were observed. Although, the mud trails were removed by worker immediately, the
Contractor should ensure that wheel washing facilities were operating at all
vehicular site entrances/exits to wash off the deposited silt on vehicles’
wheels and bodies and combine with cleaning of public roads wherever
necessary and practical. Proper drainage channels/bunds/wheel washing bay
should be provided to collect the run-off from wheel washing facilities. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
26 October 2012 |
Time: |
14:00 |
Inspection No.: |
280 |
|
Nil |
|
Follow Up
Observation |
1. |
General refuse and C&D waste at NB 44 had
been removed. (Closed) |
|
|
|
|
2. |
New Observations Stagnant water was accumulated at Area W49. The
Contractor was reminded to remove the stagnant water more frequently and
maintain the drainage system properly. |
3. |
The Contractor was
reminded to cover the stockpiles at Area W56B by tarpaulin sheet after work. |
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
31 October
2012 |
Time: |
9:00 |
Inspection No.: |
281 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Site entrance and public roads are cleaned
regularly. Haul road at Gate 26 had been paved by concrete and bunds at the
site entrance/exit at Gate 26 had also been provided. (Closed) |
|
|
|
|
|
|
|
|
|
New
Observations |
2. |
Improper covering for a stock of cement bags
(more than 20 bags) was observed at Area NB20. The Contractor was reminded to
properly cover every stock of more than 20 bags of cement / dry PFA by
impervious sheeting or placed in an area sheltered on the top and the 3 sides.
|
3. |
Stagnant water was accumulated at NB20 near the
site entrance/exit. The Contractor was reminded to remove the stagnant water
regularly. |
|
|
|
|
|
|
|
Nil |