Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

5 September 2012

Time:

9:00

Inspection No.:

265

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Valid noise emission label for air compressor at Bridge 10A had been displayed. (Closed)

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

6 September 2012

Time:

14:00

Inspection No.:

266

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

General refuse, papers, plastic bottles and aluminum cans at Area NLKB SA had been sorted properly and labels had been also provided to the recycling bins on site. (Closed)

 

 

 

 

 

 

 

New Observation

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

13 September 2012

Time:

14:00

Inspection No.:

267

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

1.

New Observation

 

General refuse were accumulated at Gate 30 and LB3 WA. The Contractor was reminded to dispose the general refuse more frequently and provide sufficient receptacles for general refuse collection on site. The Contractor was also reminded to maintain the site cleanness and tidiness.

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

14 September 2012

Time:

14:30

Inspection No.:

268

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

New Observations

 

1.

Stagnant water was accumulated at Area NB16. The Contractor was reminded to remove the stagnant water regularly. The Contractor was also recommended to maintain the drainage system properly.

 

2.

No drip tray provided for a generator at Area NB16 was observed and oil leakage was also found from the generator. The Contractor was reminded to provide drip tray for the generator to retain any leaked oil. Oil stain on ground should be removed and disposed as chemical wastes.

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

19 September 2012

Time:

9:00

Inspection No.:

269

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Stagnant water at Area NB16 had been removed. (Closed)

 

2.

Oil stains on ground at Area NB16 had been cleared and the generator at Area NB16 had also been removed from the site. (Closed)

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

20 September 2012

Time:

14:00

Inspection No.:

270

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

General refuse at Gate 30 and LB3 WA had been removed. (Closed)

 

 

 

 

 

 

 

2.

New Observation

 

Oil drum was observed placed on ground at Area NLKP9 without drip tray. The Contractor was reminded to provide drip tray or equivalent measures for all oil drums on site to avoid any oil leakage occurred.

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

26 September 2012

Time:

9:00

Inspection No.:

271

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

New Observations

 

1.

Broken sandbags were observed near the entrance of Gate 26. The Contractor was reminded to replace all broken sandbags and maintain the sandbag bunding properly to prevent surface runoff from construction work flowing outside the work area and discharging to public drain. Silt accumulated near the broken sandbags should be removed as soon as possible to avoid any silty water discharging to nearby gully. The Contractor was also recommended to review and maintain the effectiveness of sandbag bunding regularly.

 

2.

Oil drums were observed placed on ground without drip tray at New Banyan West Bridge. The Contractor was reminded to provide drip trays for all oil drums on site to prevent oil leakage.

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

27 September 2012

Time:

14:00

Inspection No.:

272

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Oil drum at Area NLKP9 had been removed. (Closed)

 

 

 

 

 

 

 

2.

New Observation

 

Oily water was accumulated inside the drip trays at Area W45. The Contractor was reminded to remove the oily water and handle it chemical waste. The Contractor was recommended to remove the oily water / leaked oil inside the drip trays regularly to prevent any overflow.

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil