Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
05 July 2012 |
Time: |
14:00 |
Inspection No.: |
247 |
|
Nil |
|
Follow Up
Observations |
1. 2. |
Cement on ground in the works area and on the access road at Bridge
15A were sprayed with water. (Closed) Stagnant water accumulated inside the gullies and tyres on the bridge
deck at Bridge 15A were removed. (Closed) |
3. 4. |
New Observations Vegetation wastes were found accumulated along
the site boundary at W35A. The Contractor was reminded to clear up the
vegetation wastes to keep the site in a tidy condition. Recyclable waste such as wood was found mixing
with general refuse and construction material inside the waste skip at W38.
The contractor was reminded to sort out the recyclable waste and clear the
waste skip regularly. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
06
July 2012 |
Time: |
14:00 |
Inspection No.: |
248 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Exposed
slopes at NBWNA were covered up by tarpaulin sheet completely. (Closed) |
|
|
|
New
Observation |
2. |
Stagnant water was found
accumulated inside the excavation area near W8 Bay 2-3 and inside the drip
tray at NB16. The Contractor was reminded to remove the stagnant water and
dispose of as chemical waste. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
11
July 2012 |
Time: |
9:00 |
Inspection No.: |
249 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Stagnant
water accumulated inside the excavation area near W8 Bay 2-3 and inside the
drip tray at NB16 were removed. (Closed) |
|
|
|
New
Observation |
|
Nil. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
12 July 2012 |
Time: |
14:00 |
Inspection No.: |
250 |
|
Nil |
|
Follow Up
Observations |
1. 2. |
Vegetation wastes accumulated along the site
boundary at W35A were cleared. (Closed) Recyclable waste inside the waste skip at W38 was
removed. (Closed) |
3. |
New Observation General refuse and C&D materials were
observed near the u-channel at S20. The Contractor was reminded to remove the
general refuse and C&D materials from the u-channel and properly maintain
the drainage system on-site. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
18
July 2012 |
Time: |
9:00 |
Inspection No.: |
251 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
New
Observation |
|
Nil. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
19 July 2012 |
Time: |
14:00 |
Inspection No.: |
252 |
|
Nil |
|
Follow Up
Observations |
1. |
General refuse and C&D materials near the
u-channel at S20 were removed. (Closed) |
2. |
New Observation Substandard run-off was found discharging to the
public drainage at NB42. The Contractor was reminded to properly maintain and
review the temporary drainage systems provided within works area and ensure
that run-off was properly desilted prior to discharging to public drains. Any
untreated run-off should be avoided from overflowing to public drains. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
25
July 2012 |
Time: |
9:00 |
Inspection No.: |
253 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
New
Observation |
|
Nil. |
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
26 July 2012 |
Time: |
14:00 |
Inspection No.: |
254 |
|
Nil |
|
Follow Up
Observation |
1. |
Untreated waste water was still observed running
off and discharging to the public drain at NB42. The Contractor was reminded
to enhance the drainage system properly and avoid any untreated water running
off from site area and discharging to public drains. (Follow-up) |
|
|
2. |
New Observation Cans and bottles were observed in site area at
NB42. The Contractor was reminded to remove the cans and bottles regularly.
The Contractor was also reminded to maintain the site cleanliness and
tidiness. |
|
|
|
Nil |