Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

2 May 2012

Time:

9:00

Inspection No.:

229

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

New Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

3 May 2012

Time:

14:00

Inspection No.:

230

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

 

 

2.

 

Stagnant water accumulated inside the drip trays of chemical contianers on Lam Kam Bridge Pier 2 was cleared. (Closed)

 

Construction waste accumulated on Lam Kam Bridge was cleared. (Closed)

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

9 May 2012

Time:

14:00

Inspection No.:

231

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

New Observation

 

1.

Construction material was found placed near the retained tree at NB44. The Contractor was reminded to remove the construction material and provide proper protective measure to the retained tree.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

10 May 2012

Time:

9:00

Inspection No.:

232

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

New Observations

 

1.

 

 

 

2.

 

 

 

Oil stains were found on ground near the breaking tip of breaker under Bridge 11 near Gate 4. The Contractor was reminded to clear the oil stains and provide tarpaulin sheet to the breaking tip to retain oil leakage.

 

Mud was found accumulated inside the u-channel at Wall 8. The Contractor was reminded to clear the mud inside the u-channel.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

16 May 2012

Time:

9:00

Inspection No.:

233

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

 

 

2.

Oil stains on ground near the breaking tip of breaker were cleared and coverage of tarpaulin sheet was provided to the breaking tip to retain oil leakage under Bridge 11 near Gate 4. (Closed)

 

Mud accumulated inside the u-channel at Wall 8 was cleared. (Closed)

 

 

 

Mud accumulated inside the u-channel at Wall 8 was cleared. (Closed)

 

 

New Observations

 

3.

 

 

4.

Mud trails were observed at the site entrance in Gate 44. The Contractor should clear the mud trails on the public road.

 

The absorptive material wrapping to the breaking tip of the breakers working in works area were found improper at Gate 44. The Contractor should provide proper absorptive material wrapping to the breaking tips of the breakers working in works area to minimize the noise impact.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

17 May 2012

Time:

9:00

Inspection No.:

234

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

 

 

 

1.

Construction material placed near the retained tree at NB44 was removed and protective measure was provided for the retained tree. (Closed)

 

New Observations

 

2.

 

 

 

3.

 

 

 

 

4.

 

Breaking tip of breaker was found placed on bare ground at S38. The Contractor was reminded to place the breaking tip onto the tarpaulin sheet to avoid the oil leaked from the breaking tip to the ground.

 

Mud trails were observed on ground at the site entrance at S37. The Contractor should review and maintain the wheel washing facilities provided at works area regularly to ensure the deposited silt on vehicles’ wheels and bodies was washed off effectively. Mus trails on the piblic road should be cleared.

 

Accumulation of silty water was observed inside the wheel washing bay at W71. The Contractor was reminded to clear the deposited silt inside the wheel washing bay regularly and maintain the wheel washing facilities properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

23 May 2012

Time:

9:00

Inspection No.:

235

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

 

 

2.

 

Mud trails at the site entrance at Gate 44 were cleared. High pressure water jet was provided at the site entrance to remove any dusty materials from their bodies and wheels before leaving construction site. A water truck was arranged to clean the site entrance regularly. (Closed)

 

Absorptive material wrapping was provided to the breaking tip of the breaker worked at Gate 44. (Closed)

 

 

 

New Observations

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

24 May 2012

Time:

14:00

Inspection No.:

236

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

 

2.

 

 

 

3

Breaking tip of breaker placed on bare ground at S38 was placed on tarpaulin sheet. (Closed)

 

Mud trails on ground at the site entrance at S37 were cleared. The Contractor was reminded to review and maintain the wheel washing facilities provided at works area regularly to ensure the deposited silt on vehicles’ wheels and bodies was washed off effectively. (Closed)

 

Silty water inside the wheel washing bay at W71 was cleared. However, the Contractor should clear the deposited silt inside the wheel washing bay regularly and maintain the wheel washing facilities properly. (Follow-up)

 

 

New Observations

 

4.

 

 

Some leaves were observed inside the u-channel at access to W35A. The Contractor was reminded to remove the leaves inside the drainage channel to maintain the drainage system properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

30 May 2012

Time:

9:00

Inspection No.:

237

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

New Observations

 

1.

 

 

2.

 

Muddy water was found accumulated inside the sump pit at NB20. The Contractor was reminded to clear the muddy water to avoid any substandard water flowing outside the works area.

 

Cement water was found accumulated inside the u-channel at Bridge 10 East Abutment. The Contractor was reminded to clear the cement water and deposited cement inside the u-channel.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

31 May 2012

Time:

14:00

Inspection No.:

238

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

 

2.

Deposited silt inside the wheel washing bay at W71 was cleared. (Closed)

 

Leaves inside the u-channel at access to W35A were removed. (Closed)

 

New Observations

 

3.

 

 

 

Broken sand bags were observed placed on ground near the public drainage at Bridge 12A. The Contractor was reminded to replace the broken sand bags on ground.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 