Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
5
April 2012 |
Time: |
9:00 |
Inspection No.: |
221 |
|
Nil |
|
Follow
Up Observation |
|
|
1. 2. 3. |
Stagnant waster inside the u-channel at Gate 3
was removed. (Closed) Stockpile of empty cement bags and general refuse
under TB1 near Gate 3 were removed.
(Closed) Construction waste placed near the retained tree
under TB1 near Gate 3 was removed. (Closed) |
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
5 April 2012 |
Time: |
14:00 |
Inspection No.: |
222 |
|
Nil |
|
Follow
Up Observations |
|
|
1. 2. |
Metal wire tied onto the retained tree at RWB12B was
removed. (Closed) Stagnant water accumulated inside the drip tray at TW2 was cleared.
(Closed) |
|
New
Observation |
3. . |
Muddy surface run-off was
observed discharging outside the site area and sand bags/bundings provided at
the boundary of the work areas were insufficient at TW1, Link Bridge 3 and
Link Bridge 1 North Abutment. The Contracor should clear the mud on ground
and provide sufficient sand bags/bundings at the boundaries. Muddy run-off
should be directed to sedimentation tank to avoid generation of muddy run-off
overflowing outside the works area. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
11 April 2012 |
Time: |
14:00 |
Inspection No.: |
223 |
|
Nil |
|
Follow
Up Observation |
1. |
Sand bags/bundings were provided at the site
boundaries and mud on ground were cleared at TW1, Link Bridge 3 and Link
Bridge 1 North Abutment. The Contracor was reminded to conduct regular review
and monitoring on the drainage system on site to avoid generation of muddy
run-off overflowing outside the works area during wet season. (Closed) |
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
13
April 2012 |
Time: |
14:00 |
Inspection No.: |
224 |
|
Nil |
|
Follow
Up Observations |
|
|
|
Nil. |
|
|
|
|
|
New
Observations |
1. 2. |
Stagnant water was found accumulated on ground at
jacking pit and inside the drip tray near TB2. The Contractor was reminded to
remove the stagnant water to avoid mosquito breeding and dispose of the
stagnant water inside the drip tray as chemical waste Oil stains were observed on the bare ground at
TB2. The Contractor was reminded to clear the oil stains and dispose of as
chemical waste. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
18
April 2012 |
Time: |
9:00 |
Inspection No.: |
225 |
|
Nil |
|
Follow
Up Observation |
|
|
1. 2. |
Stagnant water on ground at jacking pit and inside the drip tray near TB2 was
removed. (Closed) Oil stains on the bare ground at TB2 were
cleared. (Closed) |
|
|
|
New
Observations |
3. 4. |
Stagnant water was found accumulated inside the
drip tray and the drain hole of drip tray was unplugged on Bridge 10A. The
Contractor was reminded to remove the stagnant water to avoid mosquito
breeding and dispose of the stagnant water inside the drip tray as chemical
waste. Drain hole of drip tray should be sealed up to prevent chemical oil
leakage from the chemical container. Reminder Construction materials were found accumulated on
the Bridge 10A. The Contractor was reminded to clear the construction
materials on site. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
19 April 2012 |
Time: |
14:00 |
Inspection No.: |
226 |
|
Nil |
|
Follow
Up Observations |
|
|
|
Nil. |
|
New
Observations |
1. |
Muddy water was found
discharging to the public drainage and loose sand bags were observed in the
catchpit at W51. The Contractor was recommended to provide additional sand
bags/bundings with shotcreting around the sump pit and additional sand
bags/bundings to the inlet and outlet of the catchpit. Also, the Contractor
was recommended to provide geotextile coverage on site boundary to prevent
seepage of surface run-off generated from works area. Temporary exposed
slopes/surface should cover up with tarpaulin sheet to minimize the
generation of silty run-off. Deposited silt and debris inside drainage in W51
should be cleared. Muddy run-off should be diverted to desilting facility and
closely monitor the drainage system to ensure the drainage system is properly
maintained. No substandard surface run-off from construction site shall be
discharge to public drains. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
25
April 2012 |
Time: |
9:00 |
Inspection No.: |
227 |
|
Nil |
|
Follow
Up Observation |
1. 2. |
Stagnant water accumulated
inside the drip tray was removed and the said drip tray was replaced by a
sealed drip tray on Bridge 10A. (Closed) Construction
materials accumulated on the Bridge 10A were cleared. (Closed) |
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
26 April 2012 |
Time: |
14:00 |
Inspection No.: |
228 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Additional sand bags/bundings were provided around
the sump pit and the inlet and outlet of the catchpit at W51. Coverage of
geotextile was provided along the site boundary and soil surface was
compacted to prevent seepage of surface run-off generated from works area.
The Contractor was reminded to closely review and monitor the drainage system
to ensure the drainage system is properly maintained. Mitigation measures
should be provided to prevent generation of muddy surface run-off from construction
works area. (Closed) |
|
New
Observations |
2. 3. |
Stagnent water was found
accumulated inside the drip trays of chemical contianers on Lam Kam Bridge
Pier 2. The Contractor was reminded to clear the stagnent water and dispose
of as chemical waste. Reminder The Contractor was reminded to clear the
construction waste regularly on Lam Kam Bridge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |