Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

5 April 2012

Time:

9:00

Inspection No.:

221

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

 

2.

 

3.

 

Stagnant waster inside the u-channel at Gate 3 was removed. (Closed)

 

Stockpile of empty cement bags and general refuse under TB1 near Gate 3 were removed.  (Closed)

 

Construction waste placed near the retained tree under TB1 near Gate 3 was removed. (Closed)

 

 

New Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

5 April 2012

Time:

14:00

Inspection No.:

222

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

 

2.

 

Metal wire tied onto the retained tree at RWB12B was removed. (Closed)

 

Stagnant water accumulated inside the drip tray at TW2 was cleared. (Closed)

 

 

 

 

 

New Observation

 

3.

 

 

 

.

Muddy surface run-off was observed discharging outside the site area and sand bags/bundings provided at the boundary of the work areas were insufficient at TW1, Link Bridge 3 and Link Bridge 1 North Abutment. The Contracor should clear the mud on ground and provide sufficient sand bags/bundings at the boundaries. Muddy run-off should be directed to sedimentation tank to avoid generation of muddy run-off overflowing outside the works area.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

11 April 2012

Time:

14:00

Inspection No.:

223

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Sand bags/bundings were provided at the site boundaries and mud on ground were cleared at TW1, Link Bridge 3 and Link Bridge 1 North Abutment. The Contracor was reminded to conduct regular review and monitoring on the drainage system on site to avoid generation of muddy run-off overflowing outside the works area during wet season. (Closed)

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

13 April 2012

Time:

14:00

Inspection No.:

224

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

New Observations

 

1.

 

 

 

2.

 

 

 

Stagnant water was found accumulated on ground at jacking pit and inside the drip tray near TB2. The Contractor was reminded to remove the stagnant water to avoid mosquito breeding and dispose of the stagnant water inside the drip tray as chemical waste

 

Oil stains were observed on the bare ground at TB2. The Contractor was reminded to clear the oil stains and dispose of as chemical waste.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

18 April 2012

Time:

9:00

Inspection No.:

225

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

 

2.

Stagnant water on ground at jacking pit and inside the drip tray near TB2 was removed. (Closed)

 

Oil stains on the bare ground at TB2 were cleared. (Closed)

 

 

 

 

New Observations

 

3.

 

 

 

 

 

 

4.

Stagnant water was found accumulated inside the drip tray and the drain hole of drip tray was unplugged on Bridge 10A. The Contractor was reminded to remove the stagnant water to avoid mosquito breeding and dispose of the stagnant water inside the drip tray as chemical waste. Drain hole of drip tray should be sealed up to prevent chemical oil leakage from the chemical container.

 

Reminder

 

Construction materials were found accumulated on the Bridge 10A. The Contractor was reminded to clear the construction materials on site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

19 April 2012

Time:

14:00

Inspection No.:

226

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

 

 

 

 

Nil.

 

 

New Observations

 

1.

 

 

 

Muddy water was found discharging to the public drainage and loose sand bags were observed in the catchpit at W51. The Contractor was recommended to provide additional sand bags/bundings with shotcreting around the sump pit and additional sand bags/bundings to the inlet and outlet of the catchpit. Also, the Contractor was recommended to provide geotextile coverage on site boundary to prevent seepage of surface run-off generated from works area. Temporary exposed slopes/surface should cover up with tarpaulin sheet to minimize the generation of silty run-off. Deposited silt and debris inside drainage in W51 should be cleared. Muddy run-off should be diverted to desilting facility and closely monitor the drainage system to ensure the drainage system is properly maintained. No substandard surface run-off from construction site shall be discharge to public drains.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

25 April 2012

Time:

9:00

Inspection No.:

227

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

 

2.

 

Stagnant water accumulated inside the drip tray was removed and the said drip tray was replaced by a sealed drip tray on Bridge 10A. (Closed)

 

Construction materials accumulated on the Bridge 10A were cleared. (Closed)

 

 

 

New Observations

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

26 April 2012

Time:

14:00

Inspection No.:

228

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Additional sand bags/bundings were provided around the sump pit and the inlet and outlet of the catchpit at W51. Coverage of geotextile was provided along the site boundary and soil surface was compacted to prevent seepage of surface run-off generated from works area. The Contractor was reminded to closely review and monitor the drainage system to ensure the drainage system is properly maintained. Mitigation measures should be provided to prevent generation of muddy surface run-off from construction works area. (Closed)

 

New Observations

 

2.

 

 

 

 

 

3.

 

Stagnent water was found accumulated inside the drip trays of chemical contianers on Lam Kam Bridge Pier 2. The Contractor was reminded to clear the stagnent water and dispose of as chemical waste.

 

Reminder

 

The Contractor was reminded to clear the construction waste regularly on Lam Kam Bridge.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil