Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
7 March 2012 |
Time: |
14:00 |
Inspection No.: |
213 |
|
Nil |
|
Follow
Up Observation |
|
|
1. 2. 3. 4. |
Additional sand bags were provided around the sump
pit at W51. The
Contractor was reminded to conduct regular
review and monitoring on the drainage system on site to avoid overflowing of
substandard run-off. Deposited silt should be cleared regularly. (Closed) Additional inlet pipe was provided from the desilting
pit to the sedimentation tank near Bridge 15 AP4 for the wastewater
collection. (Closed) Shotcreting was provided to the exposed slope
near Bridge 15 AP4. (Closed) Silt accumulated inside the u-channel and mud trails on ground at
Bridge 15 AP4 were cleared. Additional sand bags were provided in the
captioned works area to intercept surface run-off. The Contractor was
reminded to conduct regular review and
monitoring on the drainage system on site to avoid overflowing of substandard
run-off. (Closed) |
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
8
March 2012 |
Time: |
14:00 |
Inspection No.: |
214 |
|
Nil |
|
Follow
Up Observations |
|
|
|
Nil. |
|
|
|
New
Observation |
1. . |
Oil stain was
found on ground near NB1b. The Contractor was reminded to clear the oil stain
and dispose of as chemical waste. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
14
March 2012 |
Time: |
9:00 |
Inspection No.: |
215 |
|
Nil |
|
Follow
Up Observation |
1. |
Oil stain on ground near NB1b was cleared and
disposed of as chemical waste. (Closed) |
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
15 March 2012 |
Time: |
14:00 |
Inspection No.: |
216 |
|
Nil |
|
Follow
Up Observations |
|
|
|
Nil. |
|
|
|
|
|
New
Observations |
1. 2. 3. |
Noise Emission Label(NEL) was
found missing for the generator employed in W56b. The Contractor should affix
the NEL to the generator within the works area. Mud trails were observed on ground at the exit
point at Gate 2. The Contractor should clear the mud trails and provide
measure to ensure the vehicles bodies and wheels were kept clean of deposited
silt before leaving the site. Substandard wastewater was found discharging to the public drainage at W51. The Contractor was recommended to clear the
deposited silt regularly and provide sand bags/bundings to the inlet and
outlet of the catchpit to intercept the silt. The Contractor should closely
monitor the effectiveness of the desilting facility. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
21
March 2012 |
Time: |
9:00 |
Inspection No.: |
217 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
New
Observations |
1. 2. |
Sand was observed accumulated around the retained
trees and retained trees were not fenced off at jacking pit.
The Contractor was reminded to setup a tree protection zone and provide proper protective measure to
the retained trees on site. Oil leakage was observed from the power pack placed
at jacking pit. The Contractor was reminded to provide drip tray to retain
any leaked oil. Oil stain on ground should be cleared and disposed of as
chemical waste. |
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
22 March 2012 |
Time: |
14:00 |
Inspection No.: |
218 |
|
Nil |
|
Follow
Up Observations |
|
|
1. 2. 3. |
A generator affixed with noise emission lable was
replaced the said generator in W56b. (Closed) Mud trails on ground at the exit point at Gate 2 were
cleared. (Closed) Deposited silt was cleared and sand bags were
provided at the inlet of the catchpit at W51. However, the mitigation
measures provided to the drainage system still need to improve. The
Contractor was reminded to provide sand bags/bundings at the outlet of the
catchpit to intercept the silt. (Follow-up) |
|
New
Observations |
4. 5. |
Waste was observed inside the drip tray at TW4.
The Contractor was reminded to clear the waste accumulated inside the drip
tray. Access roads were found dry at TW4. The
Contractor was reminded to provide frequent water spraying on the access roads
to avoid fugitive dust emission. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
28
March 2012 |
Time: |
9:00 |
Inspection No.: |
219 |
|
Nil |
|
Follow
Up Observation |
|
|
1. 2. |
Sand accumulated
around the retained trees was cleared and protective measure was provided for
the retained tree at jacking pit. (Closed) Oil leakage from the power pack was cleared and
drip tray was provided to retain oil leakage at jacking pit. (Closed) |
|
|
|
New
Observations |
3. 4. 5. |
Stagnant waster
was observed inside the u-channel at Gate 3. The Contractor was reminded to remove
the stagnant water inside the u-channel. Stockpile of empty cement bags and general refuse
were found under TB1 near Gate 3. The Contractor was reminded to remove the
empty cement bags and general refuse regularly and disposed of properly. Construction
waste was found placed near the retained tree under TB1 near Gate 3. The
Contractor was reminded to remove the construction waste and provide proper
protective measure to the retained tree. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
29 March 2012 |
Time: |
14:00 |
Inspection No.: |
220 |
|
Nil |
|
Follow
Up Observations |
|
|
1. 2. 3. |
Additional sand bags were
provided at the outlet of the catchpit at W51 for silt interception. (Closed) The air compressor and the drip tray were removed
at TW4. (Closed) Access roads were sprayed with water at TW4 to
avoid fugitive dust emission. (Closed) |
|
New
Observations |
4. 5. |
Metal wire was found tied onto
the retained tree at RWB12B. The Contractor was reminded to remove the metal
wire and do not use the retained tree as a physical support. Stagnant water was found accumulated inside the
drip tray at TW2. The Contractor was reminded to clear the stagnant water to
avoid mosquito breeding and dispose of as chemical waste. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |