Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

7 March 2012

Time:

14:00

Inspection No.:

213

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

 

 

 

2.

 

 

3.

 

4.

 

 

 

Additional sand bags were provided around the sump pit at W51. The Contractor was reminded to conduct regular review and monitoring on the drainage system on site to avoid overflowing of substandard run-off. Deposited silt should be cleared regularly. (Closed)

 

Additional inlet pipe was provided from the desilting pit to the sedimentation tank near Bridge 15 AP4 for the wastewater collection. (Closed)

 

Shotcreting was provided to the exposed slope near Bridge 15 AP4. (Closed)

 

Silt accumulated inside the u-channel and mud trails on ground at Bridge 15 AP4 were cleared. Additional sand bags were provided in the captioned works area to intercept surface run-off. The Contractor was reminded to conduct regular review and monitoring on the drainage system on site to avoid overflowing of substandard run-off. (Closed)

 

 

 

New Observation

 

 

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

8 March 2012

Time:

14:00

Inspection No.:

214

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

New Observation

 

1.

 

 

 

.

Oil stain was found on ground near NB1b. The Contractor was reminded to clear the oil stain and dispose of as chemical waste.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

14 March 2012

Time:

9:00

Inspection No.:

215

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

1.

 

Oil stain on ground near NB1b was cleared and disposed of as chemical waste. (Closed)

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

15 March 2012

Time:

14:00

Inspection No.:

216

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

Nil.

 

 

 

 

 

New Observations

 

1.

 

 

2.

 

 

 

3.

 

Noise Emission Label(NEL) was found missing for the generator employed in W56b. The Contractor should affix the NEL to the generator within the works area.

 

Mud trails were observed on ground at the exit point at Gate 2. The Contractor should clear the mud trails and provide measure to ensure the vehicles bodies and wheels were kept clean of deposited silt before leaving the site.

 

Substandard wastewater was found discharging to the public drainage at W51. The Contractor was recommended to clear the deposited silt regularly and provide sand bags/bundings to the inlet and outlet of the catchpit to intercept the silt. The Contractor should closely monitor the effectiveness of the desilting facility.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

21 March 2012

Time:

9:00

Inspection No.:

217

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

New Observations

 

1.

 

 

 

2.

Sand was observed accumulated around the retained trees and retained trees were not fenced off at jacking pit. The Contractor was reminded to setup a tree protection zone and provide proper protective measure to the retained trees on site.

 

Oil leakage was observed from the power pack placed at jacking pit. The Contractor was reminded to provide drip tray to retain any leaked oil. Oil stain on ground should be cleared and disposed of as chemical waste.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

22 March 2012

Time:

14:00

Inspection No.:

218

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

 

 

 

1.

 

2.

 

3.

 

 

A generator affixed with noise emission lable was replaced the said generator in W56b. (Closed)

 

Mud trails on ground at the exit point at Gate 2 were cleared. (Closed)

 

Deposited silt was cleared and sand bags were provided at the inlet of the catchpit at W51. However, the mitigation measures provided to the drainage system still need to improve. The Contractor was reminded to provide sand bags/bundings at the outlet of the catchpit to intercept the silt. (Follow-up)

 

 

New Observations

 

4.

 

 

5.

 

Waste was observed inside the drip tray at TW4. The Contractor was reminded to clear the waste accumulated inside the drip tray.

 

Access roads were found dry at TW4. The Contractor was reminded to provide frequent water spraying on the access roads to avoid fugitive dust emission.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

28 March 2012

Time:

9:00

Inspection No.:

219

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

 

 

2.

Sand accumulated around the retained trees was cleared and protective measure was provided for the retained tree at jacking pit. (Closed)

 

Oil leakage from the power pack was cleared and drip tray was provided to retain oil leakage at jacking pit. (Closed)

 

 

 

 

New Observations

 

3.

 

 

4.

 

 

 

5.

Stagnant waster was observed inside the u-channel at Gate 3. The Contractor was reminded to remove the stagnant water inside the u-channel.

 

Stockpile of empty cement bags and general refuse were found under TB1 near Gate 3. The Contractor was reminded to remove the empty cement bags and general refuse regularly and disposed of properly.

 

Construction waste was found placed near the retained tree under TB1 near Gate 3. The Contractor was reminded to remove the construction waste and provide proper protective measure to the retained tree.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

29 March 2012

Time:

14:00

Inspection No.:

220

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

 

2.

 

3.

Additional sand bags were provided at the outlet of the catchpit at W51 for silt interception. (Closed)

 

The air compressor and the drip tray were removed at TW4. (Closed)

 

Access roads were sprayed with water at TW4 to avoid fugitive dust emission. (Closed)

 

New Observations

 

4.

 

 

5.

 

 

Metal wire was found tied onto the retained tree at RWB12B. The Contractor was reminded to remove the metal wire and do not use the retained tree as a physical support.

 

Stagnant water was found accumulated inside the drip tray at TW2. The Contractor was reminded to clear the stagnant water to avoid mosquito breeding and dispose of as chemical waste.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil