|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
Measured Noise Level for
30-min, dB(A) |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| Remarks: (1) The monitoring
station at Tai Kwong Secondary School (NM1) was relocated to 168 Shek Kwu
Lung Village (NM1A) |
|
|
|
| starting
from 1 September 2011 due to the mentioned school was closed down; |
|
|
|
| (2)
Measured noise level would be shown if Measured noise level (Leq) <=
Baseline noise level |
|
|
|
|
|
|
|
|
|
Environmental Team for the
Widening of Tolo Highway between
Island House Interchange and Tai Hang - Investigation |
SCALE |
N.T.S. |
DATE |
Mar-12 |
|
|
| CHECK |
ENFL |
DRAWN |
JWYM |
|
| Graphical
Presentation of Impact Daytime Construction Noise Monitoring Results |
JOB NO. |
60102979 |
APPENDIX No. |
Rev. |
|
| I |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|