Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

4 January 2012

Time:

9:00

Inspection No.:

195

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Drip tray was provided to two chemical containers at Bridge 10A. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

 

 

 

Exposed slope at abutment NBSA was not completely covered up by tarpaulin sheet. The Contractor was reminded to cover up the exposed slope with tarpaulin sheet completely.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

4 January 2012

Time:

14:00

Inspection No.:

196

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Construction debris on bridge deck and inside the waste skip at NLKP 3 was removed. (Closed)

 

2.

Dust suppression measure at W45-W46 was provided. The Contractor was reminded to spray the slope and haul road frequently.(Closed)

 

 

 

 

 

 

New Observation

 

3.

 

 

 

 

4.

 

 

Plants were found stored up on bare ground at W65b. The Contractor was reminded to clear the plants or place them on tarpaulin sheet to avoid oil leakage to the bare ground.

 

Reminder

 

The Contractor was advised to provide dust suppression measure to the exposed slope at S37 as soon as possible.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

11 January 2012

Time:

9:00

Inspection No.:

197

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Exposed slope at abutment NBSA was covered up with tarpaulin sheet completely. (Closed)

 

 

 

 

 

 

 

New Observation

 

2.

Exposed slope was dry and bunding was found missing along the site boundary at W25. The Contractor was reminded to provide dust suppression measures to minimize fugitive dust generation and provide sand bag/bunds to intercept the surface run-off from works area.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

12 January 2012

Time:

14:00

Inspection No.:

198

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Plants stored up on bare ground at W65b were removed. (Closed)

 

 

2.

The exposed slope at S37 was covered up by erosion control mat. (Closed)

 

 

 

 

 

 

 

 

New Observations

 

3.

 

 

 

4.

Absorptive material wrapping at the breaking tip at W38 works area should be improved. The Contractor should wrap the breaking tip of the breaker completely before carry out rock breaking works.

 

Stagnant water was accumulated inside the u-channel along the site boundary near W38 works area. The Contractor was reminded to clear the stagnant water to prevent mosquito breeding.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

16 January 2012

Time:

14:00

Inspection No.:

199

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Sand bags were provided along the site boundary and exposed slope without immediate work was covered with tarpaulin sheet and sprayed with water at work areas at W25. (Closed)

 

 

 

 

 

 

 

New Observations

 

2.

Oil mixing with water was found on ground at site entrance no.3. The Contractor was reminded to clear the oil mixture.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

19 January 2012

Time:

14:00

Inspection No.:

200

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

 

 

 

 

1.

 

 

 

2.

A layer of absorptive material was wrapped at the breaking tip of the breaker worked at W38 works area. However, the absorptive material wrapping still needs further improvement. The Contractor was reminded to wrap the breaking tip of the breaker completely with absorptive material. (Follow-up)

 

Stagnant water accumulated inside the u-channel along the site boundary near W38 works area was cleared. (Closed)

 

 

 

 

 

 

New Observations

 

3.

Stagnant water was accumulated on ground under Bridge 15. The Contractor was reminded to clear the stagnant water to prevent breeding of mosquito.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

27 January 2012

Time:

9:00

Inspection No.:

201

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Oil mixture on ground at site entrance no.3 was cleared and disposed of as chemical waste. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

27 January 2012

Time:

14:00

Inspection No.:

202

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Absorptive material wrapping was provided to the breaking tip of the breaker at W38 works area. (Closed)

 

 

2.

Stagnant water accumulated on ground under Bridge 15 was cleared. (Closed)

 

 

 

 

 

 

 

New Observations

 

3.

Stagnant water was accumulated inside the drip tray near W49. The Contractor was reminded to clear the stagnant water to prevent mosquito breeding.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil