Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
4 January 2012 |
Time: |
9:00 |
Inspection No.: |
195 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Drip tray was provided
to two chemical containers at Bridge 10A. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Exposed slope at
abutment NBSA was not completely covered up by tarpaulin sheet. The
Contractor was reminded to cover up the exposed slope with tarpaulin sheet
completely. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
4 January 2012 |
Time: |
14:00 |
Inspection No.: |
196 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Construction debris on bridge
deck and inside the waste skip at NLKP 3 was removed. (Closed) |
2. |
Dust suppression measure at
W45-W46 was provided. The Contractor was reminded to spray the slope and haul
road frequently.(Closed) |
|
|
|
|
|
New
Observation |
3. 4. |
Plants were found stored up on bare ground at
W65b. The Contractor was reminded to clear the plants or place them on
tarpaulin sheet to avoid oil leakage to the bare ground. Reminder The Contractor was advised to provide dust
suppression measure to the exposed slope at S37 as soon as possible. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
11 January 2012 |
Time: |
9:00 |
Inspection No.: |
197 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Exposed slope at
abutment NBSA was covered up with tarpaulin sheet completely. (Closed) |
|
|
|
|
|
|
|
New
Observation |
2. |
Exposed slope
was dry and bunding was found missing along the site boundary at W25. The
Contractor was reminded to provide dust suppression measures to minimize fugitive
dust generation and provide sand bag/bunds to intercept the surface run-off
from works area. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
12 January 2012 |
Time: |
14:00 |
Inspection No.: |
198 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Plants stored up on bare ground at W65b were removed. (Closed) |
|
|
2. |
The exposed slope at S37 was covered up by
erosion control mat. (Closed) |
|
|
|
|
|
|
|
New
Observations |
3. 4. |
Absorptive material wrapping at the breaking tip
at W38 works area should be improved. The Contractor should wrap the breaking
tip of the breaker completely before carry out rock breaking works. Stagnant water was accumulated inside the
u-channel along the site boundary near W38 works area. The Contractor was
reminded to clear the stagnant water to prevent mosquito breeding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
16 January 2012 |
Time: |
14:00 |
Inspection No.: |
199 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Sand bags were
provided along the site boundary and exposed slope without immediate work was
covered with tarpaulin sheet and sprayed with water at work areas at W25.
(Closed) |
|
|
|
|
|
|
|
New
Observations |
2. |
Oil mixing with water was found on ground at site
entrance no.3. The Contractor was reminded to clear the oil mixture. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
19 January 2012 |
Time: |
14:00 |
Inspection No.: |
200 |
|
Nil |
|
Follow
Up Observations |
|
|
1. 2. |
A layer of absorptive material was wrapped at the breaking tip of the
breaker worked at W38 works area. However, the absorptive material wrapping
still needs further improvement. The Contractor was reminded to wrap the
breaking tip of the breaker completely with absorptive material. (Follow-up) Stagnant water accumulated inside the u-channel
along the site boundary near W38 works area was cleared. (Closed) |
|
|
|
|
|
New
Observations |
3. |
Stagnant water was accumulated on ground under
Bridge 15. The Contractor was reminded to clear the stagnant water to prevent
breeding of mosquito. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
27 January 2012 |
Time: |
9:00 |
Inspection No.: |
201 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Oil mixture on
ground at site entrance no.3 was cleared and disposed of as chemical waste.
(Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
27 January 2012 |
Time: |
14:00 |
Inspection No.: |
202 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Absorptive material wrapping was provided to the breaking tip of the breaker
at W38 works area. (Closed) |
|
|
2. |
Stagnant water accumulated on ground under Bridge 15 was cleared. (Closed) |
|
|
|
|
|
|
|
New
Observations |
3. |
Stagnant water was accumulated inside the drip
tray near W49. The Contractor was reminded to clear the stagnant water to
prevent mosquito breeding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |