Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
01 December 2011 |
Time: |
14:00 |
Inspection No.: |
186 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Exposed slope near Gate 30 was sprayed
with water. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. 3. 4. |
Oil mixing with water was found underneath the
vehicle at Bridge 18. The Contractor
was reminded to clear the oily mixture. C&D materials, vegetation and excavated materials
waste were found accumulated on ground at Bridge 18 north abatement. The
Contractor should clear up the C&D materials, vegetation and excavated
materials waste and sort out the recyclable waste to keep the site in a tidy
condition. Smoke was observed emitting from the roller at
W72. The Contractor was requested to repair and maintain the plant on site properly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
07 December 2011 |
Time: |
14:00 |
Inspection No.: |
187 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Oily mixture underneath the vehicle at Bridge 18
was cleared. (Closed) |
|
|
2. |
Recyclable wastes were sorted out and C&D
materials were cleared up near Bridge 18 north abatement. (Closed) |
3. |
No dark smoke emitting from the roller at W72 was observed. (Closed) |
|
|
|
|
|
New
Observation |
4. 5. 6. |
Muddy runoff was found on ground near NLKP 9. The
Contractor was reminded to clear the muddy runoff and provide preventive
measures to prevent surface run-off discharge to the nearby public drains. Mud trails were found on ground at the exit point
near NLKP 9. The Contractor was reminded to clear up the mud trails and provide
measure to ensure the vehicles bodies and wheels were kept clean of deposited
silt before leaving the site. Oil stain was found on ground underneath the air
compressor and compressed air tank near NLKP 9. The Contractor was reminded
to clear the oil stain and check potential leakage from containers and
machineries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
8 December 2011 |
Time: |
14:00 |
Inspection No.: |
188 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
14 December 2011 |
Time: |
9:00 |
Inspection No.: |
189 |
|
Nil |
|
Follow
Up Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
1. |
Metal wires were
found tied onto the retained tree near NB16. The Contractor was reminded to
remove the metal wires and do not use the retained tree as a physical
support. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
15 December 2011 |
Time: |
14:00 |
Inspection No.: |
190 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Muddy runoff on ground near NLKP 9 was cleared
and sand bags were provided to intercept the surface run-off from works area.
(Closed) |
|
|
2. |
Mud trails at the exit point near NLKP 9 were cleared and tarpaulin
sheet coverage was provided at the exit point to avoid silt deposition on
vehicles’ bodies and wheels. (Closed) |
3. |
Oil stain on ground underneath the air compressor and compressed air
tank near NLKP 9 was cleared. Sand bag and tarpaulin sheet coverage were
provided to retain any oil leakage, if there is such case. (Closed) |
|
|
|
|
|
New
Observations |
4. |
Exposed soil surfaces/slopes were found at W66
and works area near Gate no. 29. The Contractor was reminded to provide
regular water spraying or tarpaulin sheet coverage to the exposed soil
surfaces/slopes to minimize dust impacts. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
21 December 2011 |
Time: |
9:00 |
Inspection No.: |
191 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Metal wire tied
onto the retained tree near NB16 was removed. The trunk of tree was wrapped
up with protective material. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
21 December 2011 |
Time: |
14:00 |
Inspection No.: |
192 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Exposed soil surfaces/slopes at W66 and works
area near Gate no. 29 was sprayed with water. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
2. |
Cement and C&D waste was found accumulated
inside the u-channel and plastic bag was found blocking the entrance of the
pipe at Link Bridge 1. The Contractor was reminded to clear the cement and
C&D waste and provide traps to intercept the silt and debris before
discharge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
28 December 2011 |
Time: |
9:00 |
Inspection No.: |
193 |
|
Nil |
|
Follow
Up Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
1. |
Two chemical
containers were placed on ground without drip tray at Bridge 10A. The
Contractor was reminded to provide drip tray to the chemical containers on
site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
29 December 2011 |
Time: |
14:00 |
Inspection No.: |
194 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
The blockages at the u-channel and
pipe entrance near Link Bridge 1 were removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
|
Nil. |
2. 3. |
Reminder Construction debris was found accumulated on
bridge deck and inside the waste skip at NLKP 3. The Contractor was reminded
to clear the construction debris on site. The Contractor was reminded to maintain and
review the dust suppression measure regularly at W45-W46. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |