Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
2 November 2011 |
Time: |
9:00 |
Inspection No.: |
177 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Cement observed
on the ground at Wall 4-7 was cleaned up. (Closed) |
|
|
2. |
Soil stockpile at site entrance 24 was covered up
with tarpaulin sheet. (Closed) |
|
|
|
|
|
|
|
|
|
New
Observation |
3. |
Noise Emission Label
(NEL) was found missing for the air compressor at NB16. The Contractor was
reminded to affix NEL to the air compressor. |
4. |
Stagnant water was found accumulated in the
precast gully at NB14-18. The Contractor was reminded to clear the stagnant
water and provide mitigation measures to prevent mosquito breeding. |
|
|
5. |
An oil drum was found placed on ground without
drip tray at NB14-18. The Contractor was reminded to provide drip tray to oil
drum in the site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
3 November 2011 |
Time: |
14:00 |
Inspection No.: |
178 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Stockpile of empty cement bags at W38 works area
were cleared. (Closed) |
|
|
2. |
Access roads in W38 works area were sprayed with water. (Closed) |
|
Silty water and deposited silt inside the u-channel along the site boundaries of W38 works area were
cleared. (Closed) |
3. |
Silty water and deposited silt inside the u-channel along the site boundaries of W38 works area were
cleared. (Closed) |
|
|
|
New
Observation |
4. |
Waste was observed at material storage area near
RW71. The Contractor was advised to store the wastes in designated storage
area. Waste should be disposed of regularly and sorted properly. Waste inside
the waste skip near RW71 was found mixing with some recyclable waste, like
woods and papers. The Contractor was reminded to clear the waste and
implement the waste sorting system properly. |
5. |
Access roads near RW71 were observed dry. The Contractor was reminded
to spray water more frequently. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
9 November 2011 |
Time: |
14:00 |
Inspection No.: |
179 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Waste at material storage area and recyclable waste inside the waste skip near
RW71 was removed. (Closed) |
|
|
2. |
Access roads near RW71 were dampened. (Closed) |
|
|
|
|
|
|
|
New
Observation |
3. |
Oil mixing with
water was observed on ground near NB42. The Contractor was reminded to clear
the oily mixture and treat the oily mixture as chemical waste. |
|
|
4. |
Empty cement
bags were found accumulated near NLK Pier 9. The Contractor was reminded to
clear up the empty cement bag. |
5. |
Deposited silt
was observed inside the water recycling tank at NLK Pier 9. The Contractor
was reminded to clear the deposited silt. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
10 November 2011 |
Time: |
14:00 |
Inspection No.: |
180 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Noise Emission
Label (NEL) was affixed to the air compressor at NB16. (Closed) |
|
|
2. |
Stagnant water in the precast gully at NB14-18
was cleared and covered by impervious sheet. (Closed) |
|
|
3. |
Oil drum on ground at NB14-18 was removed off.
(Closed) |
|
|
|
New
Observations |
4. |
Silty water and
waste was found accumulated along the site boundary at W4-7. The Contractor
was reminded to drain off the silty water and clear the waste. |
5. |
Soil stockpile and exposed slope was found
covered up incompletely at central divider works area at NB2. The Contractor
was reminded to cover the soil stockpile and exposed slope completely. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
16 November 2011 |
Time: |
9:00 |
Inspection No.: |
181 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Silty water was
drained off and waste was cleared along the site boundary at W47. (Closed) |
|
|
2. |
Soil stockpile and exposed slope at central
divider works area at NB2 were covered up completely. (Closed) |
|
|
|
|
|
|
|
New
Observations |
3. |
Stagnant water was found accumulated in trench at NB27. The Contractor
was reminded to drain off the stagnant water to prevent mosquito breeding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
17 November 2011 |
Time: |
14:00 |
Inspection No.: |
182 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Oily mixture on ground near NB42 was cleared.
(Closed) |
|
|
2. |
Empty cement bags near NLK Pier 9 were covered up
with tarpaulin sheet. (Closed) |
3. |
Deposited silt inside the water recycling tank at
NLK Pier 9 was clear. (Closed) |
|
|
|
|
|
|
|
New
Observations |
4. |
The drain hole of a drip tray at work area TW1
was unplugged. The Contractor was reminded to seal up the hole to prevent
chemical oil leakage from the equipment. |
|
|
5. |
Muddy water was found on ground near Gate 30. The
Contactor was reminded to cover the slope with tarpaulin sheet or provide
shotcreting to the slope. Proper bunding should be provided along the
boundary to intercept surface runoff from flowing into the nearby public
drainage. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
23 November 2011 |
Time: |
9:00 |
Inspection No.: |
183 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Stagnant water accumulated
in trench at NB27 was drained off. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
24 November 2011 |
Time: |
14:00 |
Inspection No.: |
184 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Drain hole of a drip tray at work area TW1 was
sealed up. (Closed) |
|
|
2. |
The slope near Gate 30 was covered up with tarpaulin sheet and bunding
was provided along the boundary. (Closed) |
|
|
|
|
|
|
|
New
Observations |
3. |
Exposed slope
near Gate 30 was found dry. The Contractor was reminded to spray water more
frequently during the dry season. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
30 November 2011 |
Time: |
9:00 |
Inspection No.: |
185 |
|
Nil |
|
Follow
Up Observations |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |