Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

4 October 2011

Time:

9:00

Inspection No.:

169

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The exposed slope near work area NB1 was fully covered up with tarpaulin sheet. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

7 October 2011

Time:

14:00

Inspection No.:

170

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

 The air compressor was removed from Bridge 18A. (Closed)

 

 

2.

Parts of equipment were covered with tarpaulin sheet at W66. (Closed)

 

 

3.

 

4.

Recyclable waste inside waste skip at W66 was removed. (Closed)

 

No muddy run-off discharge to public drainage at 15AP4. However, deposited silt was found accumulated in desilting pit at 15AP4. The Contractor was reminded to clear up deposited silt and provide additional sand bags around the desilting pit to prevent overflowing of untreated surface run-off. (Follow-up)

 

 

 

 

New Observation

 

5.

Exposed stockpile was not completely covered with tarpaulin sheet at Bridge 15ASA and NLKP Pier 10. The Contractor was reminded to fully cover the exposed stockpile with tarpaulin sheet.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

12 October 2011

Time:

14:00

Inspection No.:

171

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Oil stains were observed on the bridge surface at Bridge 11A. The Contractor was reminded to clear the oil stains.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

13 October 2011

Time:

14:00

Inspection No.:

172

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Deposited silt was cleared up and additional sand bags were provided around the desilting pit at 15AP4. (Closed)

 

 

2.

Exposed stockpiles were fully covered by tarpaulin sheet at Bridge 15ASA and NLKP Pier 10. (Closed)

 

 

 

 

 

 

 

New Observations

 

3.

Stagnant water was accumulated on the bridge at NLKP Pier 5. The Contractor was reminded to clear the stagnant water.

4.

Muddy water was found accumulated on the ground under NLKP Pier 5. The Contractor was reminded to clear the muddy water to prevent muddy water flowing to nearby public drainage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

19 October 2011

Time:

9:00

Inspection No.:

173

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Oil stains on the bridge surface at Bridge 11A were cleared. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

20 October 2011

Time:

14:00

Inspection No.:

174

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Stagnant water accumulated on the bridge at NLKP Pier 5 was cleared. (Closed)

 

 

2.

Muddy water accumulated on the ground under NLKP Pier 5 was cleared. (Closed)

 

 

 

 

 

 

 

 

 

New Observations

 

3.

General refuse and C&D materials were found accumulated inside the u-channel at Slope 41. The Contractor was reminded to remove them from the u-channel and maintain the site in a clean and tidy condition.

 

 

4.

Stagnant water was accumulated inside the drip tray near Gate 7. The Contractor was reminded to clear the stagnant water to prevent mosquito breeding.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

26 October 2011

Time:

14:00

Inspection No.:

175

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

1.

Cement was observed on the ground at Wall 4-7. The Contractor was reminded to clean up or spray water on the cement.

 

 

2.

Soil stockpile at site entrance 24 was observed dry. The Contractor was reminded to implement dust suppression measure on the soil stockpile.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

27 October 2011

Time:

14:00

Inspection No.:

176

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

General refuse and C&D materials accumulated inside the u-channel at Slope 41 were cleared. (Closed)

 

 

2.

Stagnant water accumulated inside the drip tray placed near Gate 7 was cleared. (Closed)

 

 

 

 

 

 

 

New Observations

 

3.

Stockpiles of used cement bags were observed at W38 works area. The Contractor was reminded to clear the used cement bags regularly and disposed of them properly.

4.

Access roads in W38 works area was found dry. The Contractor was reminded to provide regular water spraying on access roads within works area to minimize the dust impacts.

 

5.

Accumulation of silty water was observed inside the u-channel along the site boundaries of W38 works area. The Contractor was recommended to clear the deposited silt inside the u-channel regularly and maintain the drainage channels properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil