Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
4 October 2011 |
Time: |
9:00 |
Inspection No.: |
169 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The exposed slope
near work area NB1 was fully covered up with tarpaulin sheet. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
7 October 2011 |
Time: |
14:00 |
Inspection No.: |
170 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
The air compressor was removed from Bridge
18A. (Closed) |
|
|
2. |
Parts of equipment were covered with tarpaulin sheet at W66. (Closed) |
|
|
3. 4. |
Recyclable waste inside waste skip at W66 was removed.
(Closed) No muddy run-off discharge to public drainage at
15AP4. However, deposited silt was found accumulated in desilting pit at
15AP4. The Contractor was reminded to clear up deposited silt and provide
additional sand bags around the desilting pit to prevent overflowing of untreated
surface run-off. (Follow-up) |
|
|
|
New
Observation |
5. |
Exposed stockpile was not completely covered with tarpaulin sheet at Bridge
15ASA and NLKP Pier 10. The Contractor was reminded to fully cover the
exposed stockpile with tarpaulin sheet. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
12 October 2011 |
Time: |
14:00 |
Inspection No.: |
171 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Oil stains were
observed on the bridge surface at Bridge 11A. The Contractor was reminded to
clear the oil stains. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
13 October 2011 |
Time: |
14:00 |
Inspection No.: |
172 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Deposited silt
was cleared up and additional sand bags were provided around the desilting
pit at 15AP4. (Closed) |
|
|
2. |
Exposed stockpiles were fully covered by tarpaulin sheet at Bridge 15ASA
and NLKP Pier 10. (Closed) |
|
|
|
|
|
|
|
New
Observations |
3. |
Stagnant water was accumulated on the bridge at
NLKP Pier 5. The Contractor was reminded to clear the stagnant water. |
4. |
Muddy water was found accumulated on the ground under NLKP Pier 5. The
Contractor was reminded to clear the muddy water to prevent muddy water
flowing to nearby public drainage. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
19 October 2011 |
Time: |
9:00 |
Inspection No.: |
173 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Oil stains on the bridge
surface at Bridge 11A were cleared. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
20 October 2011 |
Time: |
14:00 |
Inspection No.: |
174 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Stagnant water accumulated on the
bridge at NLKP Pier 5 was cleared. (Closed) |
|
|
2. |
Muddy water accumulated on the ground under NLKP
Pier 5 was cleared. (Closed) |
|
|
|
|
|
|
|
|
|
New
Observations |
3. |
General refuse and C&D materials were found
accumulated inside the u-channel at Slope 41. The Contractor was reminded to
remove them from the u-channel and maintain the site in a clean and tidy
condition. |
|
|
4. |
Stagnant water was accumulated inside the drip tray near Gate 7. The
Contractor was reminded to clear the stagnant water to prevent mosquito
breeding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
26 October 2011 |
Time: |
14:00 |
Inspection No.: |
175 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
1. |
Cement was
observed on the ground at Wall 4-7. The Contractor was reminded to clean up
or spray water on the cement. |
|
|
2. |
Soil stockpile
at site entrance 24 was observed dry. The Contractor was reminded to
implement dust suppression measure on the soil stockpile. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
27 October 2011 |
Time: |
14:00 |
Inspection No.: |
176 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
General refuse and C&D materials accumulated inside the u-channel at Slope 41
were cleared. (Closed) |
|
|
2. |
Stagnant water accumulated
inside the drip tray placed near Gate 7 was cleared. (Closed) |
|
|
|
|
|
|
|
New
Observations |
3. |
Stockpiles of used cement bags were observed at
W38 works area. The Contractor was reminded to clear the used cement bags
regularly and disposed of them properly. |
4. |
Access roads in W38 works area was found dry. The Contractor was
reminded to provide regular water spraying on access roads within works area
to minimize the dust impacts. |
5. |
Accumulation of silty water was observed inside the u-channel along
the site boundaries of W38 works area. The Contractor was recommended to clear
the deposited silt inside the u-channel regularly and maintain the drainage
channels properly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |