Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

01 September 2011                        

Time:

14:00

Inspection No.:

160

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up for Reminder

 

 

1.

Water accumulated inside the bay of base slab of retaining wall under construction near work area W73 was removed. (Closed)

 

 

 

2.

Stagnant water and mud in the sump pit of the u-channel near work area W73 was removed. (Closed)

 

 

 

 

 

 

 

 

 

New Observation

 

3.

It was observed that u-channel at work area 15AP3 was full of weeds. The Contractor was reminded to maintain the drainage system properly, including weeding.

 

 

4.

Grout mixing process was found carrying out in an area without shelter at work area 15AP1. The Contractor was reminded to cover up with tarpaulin sheet on the top and the 3 sides.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

07 September 2011                        

Time:

14:00

Inspection No.:

161

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

 Weeds observed at u-channel at work area 15AP3 were removed. (Closed)

 

2.

Grouting mixing process at work area 15AP1 was completed. (Closed)

 

 

 

 

 

 

 

 

 

New Observations

 

3.

Debris was found accumulated inside the drainage near work area W53. The Contractor was reminded to clear up the obstacles and maintain the drainage system properly.

4.

Exposed soil stockpile was found stored up on site without covering in work area S28. The Contractor was reminded to cover up the stockpile with tarpaulin sheet to avoid soil erosion.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

8 September 2011

Time:

14:00

Inspection No.:

162

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Concrete blocks were found placed near the retained tree in work area TB1. The Contractor was reminded to remove the concrete blocks and provide proper protection measures to the retained trees in works area.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

14 September 2011

Time:

9:00

Inspection No.:

163

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Concrete blocks were removed and protection measure for the retained tree was provided in work area TB1. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Dust suppression measure on the exposed slope at S17 was found insufficient. The Contractor was reminded to cover up the exposed slopes with tarpaulin sheet to avoid soil erosion.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

15 September 2011                        

Time:

14:00

Inspection No.:

164

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Debris accumulated inside the drainage near work area W53 was removed. (Closed)

 

 

2.

Exposed soil stockpile at work area S28 was covered. (Closed)

 

 

 

 

 

 

 

New Observations

 

 

Nil.

 

Reminder

 

 

3.

Stockpile of soil at work area MB42 was found without dust suppression measure. The Contractor was reminded to spray water frequently or cover up with tarpaulin sheet especially in the coming dry season.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

22 September 2011

Time:

9:00

Inspection No.:

165

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Exposed slopes at S17 were covered up with tarpaulin sheet. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

22 September 2011                        

Time:

14:00

Inspection No.:

166

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Stockpile of soil at work area MB42 was removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

Oil stains were observed on the ground at W56. The Contractor was reminded to clear the oil stains and treat the contaminated soil as chemical waste.

3.

Empty cement bags were accumulated on ground at Gate 15. The Contractor was reminded to clear up the empty cement bags.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

28 September 2011

Time:

9:00

Inspection No.:

167

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Exposed slope near work area NB1 was not completely covered by tarpaulin sheet.  The Contractor was reminded to fully cover the exposed slopes with tarpaulin sheet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

30 September 2011                        

Time:

14:00

Inspection No.:

168

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Oil stains on ground at work area W56 was removed. (Closed)

 

 

2.

Empty cement bags on ground at Gate 15 were cleared. (Closed)

 

 

 

 

 

 

 

New Observations

 

3.

Noise Emission Label (NEL) was found missing for the air compressor at 18A. The Contractor was reminded to affix NEL to the air compressor.

4.

Parts of equipment were found stored up at W66. The Contractor was reminded to clear up the plants to suitable area or place them onto tarpaulin sheet to avoid contamination to the soil from the oil leaked from parts.

 

 

5.

Recyclable waste such as steel was found mixing with general refuse inside the waste skip at W66. The Contractor was reminded to sort out the recyclable waste and clear the waste skip regularly.

 

 

6.

Muddy run-off was found discharging to public drainage at 15AP4. The Contractor was requested to construct bunds to divert the muddy run-off to desilting facility and closely monitor the drainage system to ensure the drainage system is properly maintained.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil