Site Inspection
Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
01 September 2011 |
Time: |
14:00 |
Inspection No.: |
160 |
|
Nil |
|
Follow
Up for Reminder |
|
|
1. |
Water
accumulated inside the bay of base slab of retaining wall under construction
near work area W73 was removed. (Closed) |
|
|
2. |
Stagnant water and mud in the sump pit of the u-channel near work area
W73 was removed. (Closed) |
|
|
|
|
|
|
|
|
|
New
Observation |
3. |
It was observed that u-channel at work area 15AP3
was full of weeds. The Contractor was reminded to maintain the drainage
system properly, including weeding. |
|
|
4. |
Grout mixing process was found carrying out in an
area without shelter at work area 15AP1. The Contractor was reminded to cover
up with tarpaulin sheet on the top and the 3 sides. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection
Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
07 September 2011 |
Time: |
14:00 |
Inspection No.: |
161 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Weeds observed at u-channel at work area
15AP3 were removed. (Closed) |
2. |
Grouting mixing process at work area 15AP1 was completed. (Closed) |
|
|
|
|
|
|
|
|
|
New
Observations |
3. |
Debris was found accumulated inside the drainage
near work area W53. The Contractor was reminded to clear up the obstacles and
maintain the drainage system properly. |
4. |
Exposed soil stockpile was found stored up on site
without covering in work area S28. The Contractor was reminded to cover up
the stockpile with tarpaulin sheet to avoid soil erosion. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection
Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
8 September 2011 |
Time: |
14:00 |
Inspection No.: |
162 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Concrete blocks
were found placed near the retained tree in work area TB1. The Contractor was
reminded to remove the concrete blocks and provide proper protection measures
to the retained trees in works area. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection
Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
14 September 2011 |
Time: |
9:00 |
Inspection No.: |
163 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Concrete blocks
were removed and protection measure for the retained tree was provided in
work area TB1. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Dust suppression
measure on the exposed slope at S17 was found insufficient. The Contractor
was reminded to cover up the exposed slopes with tarpaulin sheet to avoid
soil erosion. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection
Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
15 September 2011 |
Time: |
14:00 |
Inspection No.: |
164 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Debris
accumulated inside the drainage near work area W53 was removed. (Closed) |
|
|
2. |
Exposed soil stockpile at work area S28 was
covered. (Closed) |
|
|
|
|
|
|
|
New
Observations |
|
Nil. |
|
Reminder |
|
|
3. |
Stockpile of soil at work area MB42 was found
without dust suppression measure. The Contractor was reminded to spray water
frequently or cover up with tarpaulin sheet especially in the coming dry
season. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection
Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
22 September 2011 |
Time: |
9:00 |
Inspection No.: |
165 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Exposed slopes
at S17 were covered up with tarpaulin sheet. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection
Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
22 September 2011 |
Time: |
14:00 |
Inspection No.: |
166 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Stockpile of
soil at work area MB42 was removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
2. |
Oil stains were
observed on the ground at W56. The Contractor was reminded to clear the oil
stains and treat the contaminated soil as chemical waste. |
3. |
Empty cement bags were accumulated on ground at
Gate 15. The Contractor was reminded to clear up the empty cement bags. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection
Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
28 September 2011 |
Time: |
9:00 |
Inspection No.: |
167 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Exposed slope
near work area NB1 was not completely covered by tarpaulin sheet. The Contractor was reminded to fully cover the
exposed slopes with tarpaulin sheet |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection
Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
30 September 2011 |
Time: |
14:00 |
Inspection No.: |
168 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Oil stains on
ground at work area W56 was removed. (Closed) |
|
|
2. |
Empty cement bags on ground at Gate 15 were
cleared. (Closed) |
|
|
|
|
|
|
|
New
Observations |
3. |
Noise Emission Label (NEL) was found missing for the air compressor at
18A. The Contractor was reminded to affix NEL to the air compressor. |
4. |
Parts of equipment were found stored up at W66.
The Contractor was reminded to clear up the plants to suitable area or place
them onto tarpaulin sheet to avoid contamination to the soil from the oil
leaked from parts. |
|
|
5. |
Recyclable waste such as steel was found mixing
with general refuse inside the waste skip at W66. The Contractor was reminded
to sort out the recyclable waste and clear the waste skip regularly. |
|
|
6. |
Muddy run-off was found discharging to public drainage at 15AP4. The
Contractor was requested to construct
bunds to divert the muddy run-off to desilting facility and closely monitor the
drainage system to ensure the drainage system is properly maintained. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |