Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

7 July 2011

Time:

09:15

Inspection No.:

143

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Stockpile of C&D wastes at works area at Bridge 11A had been cleared. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Noise Emission Label (NEL) was found missing for the air compressor at Bridge 10A West Abutment.    The Contractor was reminded to affix NEL to the air compressor.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

7 July 2011

Time:

14:00

Inspection No.:

144

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Accumulation of silty water was observed inside the wheel washing bays provided in Retaining Wall W65 works area. The Contractor was reminded to clear the deposited silt inside the wheel washing bays regularly and maintain the wheel washing facilities properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

13 July 2011

Time:

14:00

Inspection No.:

145

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Noise Emission Label (NEL) had been affixed to the air compressor at Bridge 10A West Abutment. (Closed)  

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

14 July 2011

Time:

14:00

Inspection No.:

146

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1. 

The deposited silt in the wheel washing bays near Retaining Wall W65 has been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

20 July 2011

Time:

9:40

Inspection No.:

147

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

21 July 2011

Time:

14:00

Inspection No.:

148

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1. 

Waste inside the waste skip near work area RW72 was found mixing with some recyclable waste, like aluminum cans and plastic bottles. The Contractor was reminded to implement the waste sorting system properly and convey the message to the sub-contractors.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

27 July 2011

Time:

9:20

Inspection No.:

149

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

Reminder

 

 

 

1.

Slightly smoky emission was observed from an excavator working at Wall 10. The Contractor was reminded to conduct regular maintenance of the machineries working on site to avoid any dark smoke emission.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

28 July 2011

Time:

14:00

Inspection No.:

150

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Recyclable waste inside waste skip near work area RW72 was removed from the skip and placed in suitable recycle bins.  (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Waste inside the waste skip near work area S29 was found mixing with some recyclable waste, like aluminum cans and cardboard.  The Contractor was reminded to implement the waste sorting system properly and convey the message to the sub-contractors.

 

(2)

 

 

3.

A hole was found on a drip tray at work area S29.  The Contractor was reminded to seal up the hole before placing chemical inside the drip tray.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil