Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
7 July 2011 |
Time: |
09:15 |
Inspection No.: |
143 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Stockpile of
C&D wastes at works area at Bridge 11A had been cleared. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Noise Emission Label (NEL) was found missing for
the air compressor at Bridge 10A West Abutment. The Contractor was reminded to affix NEL
to the air compressor. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
7
July 2011 |
Time: |
14:00 |
Inspection No.: |
144 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Accumulation
of silty water was observed inside the wheel washing bays provided in
Retaining Wall W65 works area. The Contractor was reminded to clear the
deposited silt inside the wheel washing bays regularly and maintain the wheel
washing facilities properly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
13 July 2011 |
Time: |
14:00 |
Inspection No.: |
145 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Noise Emission
Label (NEL) had been affixed to the air compressor at Bridge 10A West
Abutment. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
14
July 2011 |
Time: |
14:00 |
Inspection No.: |
146 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The deposited
silt in the wheel washing bays near Retaining Wall W65 has been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
20 July 2011 |
Time: |
9:40 |
Inspection No.: |
147 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
21
July 2011 |
Time: |
14:00 |
Inspection No.: |
148 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Waste inside the waste skip near work area RW72
was found mixing with some recyclable waste, like aluminum cans and plastic bottles.
The Contractor was reminded to implement the waste sorting system properly
and convey the message to the sub-contractors. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
27 July 2011 |
Time: |
9:20 |
Inspection No.: |
149 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
Reminder |
|
|
1. |
Slightly smoky emission was observed from an excavator working at Wall
10. The Contractor was reminded to conduct regular maintenance of the
machineries working on site to avoid any dark smoke emission. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
28
July 2011 |
Time: |
14:00 |
Inspection No.: |
150 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Recyclable waste
inside waste skip near work area RW72 was removed from the skip and placed in
suitable recycle bins. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Waste inside the waste skip near work area S29
was found mixing with some recyclable waste, like aluminum cans and cardboard. The Contractor was reminded to implement
the waste sorting system properly and convey the message to the
sub-contractors. (2) |
|
|
3. |
A hole was found on a drip tray at work area
S29. The Contractor was reminded to
seal up the hole before placing chemical inside the drip tray. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |