Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

1 June 2011

Time:

09:00

Inspection No.:

133

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

2 June 2011

Time:

14:00

Inspection No.:

134

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Sand bag bunding at NLKP Pier 2 had been improved to intercept site runoff from entering the u-channel. (Closed)

 

 

2.

The exposed slope near u-channel at NLKP Pier 2 had been covered with tarpaulin sheets. (Closed)

 

 

 

 

 

 

 

 

 

New Observation

 

3.

Leaves were accumulated inside the u-channel at Gate 28. The Contractor was reminded to remove the leaves inside u-channel more frequently.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

8 June 2011

Time:

14:00

Inspection No.:

135

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The leaves inside the u-channel at Gate 28 had been cleared. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

Empty cement bags were accumulated on ground at Gate 2 and Wall 56. Although they were dampened, the Contractor was reminded to remove empty cement bags off site in a timely manner.

3.

Stagnant water was accumulated inside trays and a pile cap at Gate 2. The Contractor was reminded to clear the stagnant water and provide mitigation measures to prevent mosquito breeding.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

9 June 2011

Time:

14:00

Inspection No.:

136

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

16 June 2011

Time:

14:00

Inspection No.:

137

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The empty cement bags on ground at Gate 2 and Wall 56 has been removed. (Closed)

 

 

2.

The trays at Gate 2 had been placed upside down and the pile cap at Gate 2 had been filled with silt to prevent accumulation of stagnant water inside. (Closed)

 

 

 

 

 

 

 

 

 

New Observation

 

3.

Lid or cover was missing for a chemical container at Lam Kam Flyover and rainwater was accumulating inside the container. The Contractor was reminded to provide lid for all chemicals on site to prevent accumulation of water and hence overflow of the chemical contents.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

16 June 2011

Time:

15:30

Inspection No.:

138

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

22 June 2011

Time:

09:00

Inspection No.:

139

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

23 June 2011

Time:

14:00

Inspection No.:

140

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The chemical containers at Lam Kam Flyover had been covered up to prevent accumulation of rainwater inside the container. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

29 June 2011

Time:

09:15

Inspection No.:

141

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Stockpile of C&D wastes was observed within works area at Bridge 11A. The Contractor was reminded to clear the C&D wastes accumulated within the works area regularly and sort and dispose of them properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

30 June 2011

Time:

14:00

Inspection No.:

142

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil