Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
1 June 2011 |
Time: |
09:00 |
Inspection No.: |
133 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
2 June 2011 |
Time: |
14:00 |
Inspection No.: |
134 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Sand bag bunding at NLKP Pier 2 had been
improved to intercept site runoff from entering the u-channel. (Closed) |
|
|
2. |
The
exposed slope near u-channel at NLKP Pier 2 had been covered with tarpaulin
sheets. (Closed) |
|
|
|
|
|
|
|
New
Observation |
3. |
Leaves
were accumulated inside the u-channel at Gate 28. The Contractor was reminded
to remove the leaves inside u-channel more frequently. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
8 June 2011 |
Time: |
14:00 |
Inspection No.: |
135 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The leaves inside the u-channel at Gate 28
had been cleared. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
2. |
Empty
cement bags were accumulated on ground at Gate 2 and Wall 56. Although they
were dampened, the Contractor was reminded to remove empty cement bags off
site in a timely manner. |
3. |
Stagnant
water was accumulated inside trays and a pile cap at Gate 2. The Contractor
was reminded to clear the stagnant water and provide mitigation measures to
prevent mosquito breeding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
9 June 2011 |
Time: |
14:00 |
Inspection No.: |
136 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
16 June 2011 |
Time: |
14:00 |
Inspection No.: |
137 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
The empty cement bags on ground at Gate 2
and Wall 56 has been removed. (Closed) |
|
|
2. |
The
trays at Gate 2 had been placed upside down and the pile cap at Gate 2 had
been filled with silt to prevent accumulation of stagnant water inside.
(Closed) |
|
|
|
|
|
|
|
New
Observation |
3. |
Lid
or cover was missing for a chemical container at Lam Kam Flyover and
rainwater was accumulating inside the container. The Contractor was reminded
to provide lid for all chemicals on site to prevent accumulation of water and
hence overflow of the chemical contents. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
16 June 2011 |
Time: |
15:30 |
Inspection No.: |
138 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
22 June 2011 |
Time: |
09:00 |
Inspection No.: |
139 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
23 June 2011 |
Time: |
14:00 |
Inspection No.: |
140 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The chemical containers at Lam Kam Flyover
had been covered up to prevent accumulation of rainwater inside the
container. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
29 June 2011 |
Time: |
09:15 |
Inspection No.: |
141 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Stockpile
of C&D wastes was observed within works area at Bridge 11A. The
Contractor was reminded to clear the C&D wastes accumulated within the works
area regularly and sort and dispose of them properly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
30
June 2011 |
Time: |
14:00 |
Inspection No.: |
142 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |