Appendix
I |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location
: NM1 (Tai Kwong Secondary School Rooftop - Façade) |
|
|
|
|
|
|
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level,
dB(A) |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A)# |
Exceedance (Y/N) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
|
|
|
|
|
|
10-Jun-11 |
11:30 |
66.4 |
68.1 |
63.3 |
64.2 |
62.4 |
65 |
N |
|
|
|
####### |
####### |
####### |
####### |
62.4 |
1734890 |
60.0 |
|
|
|
|
|
|
|
|
16-Jun-11 |
11:24 |
64.8 |
66.5 |
63.0 |
64.2 |
55.9 |
65 |
N |
|
|
|
####### |
####### |
####### |
####### |
55.9 |
|
|
|
|
|
|
|
|
|
|
22-Jun-11 |
10:34 |
64.7 |
66.5 |
62.0 |
64.2 |
55.1 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
55.1 |
|
|
|
|
|
|
|
|
|
|
28-Jun-11 |
10:23 |
68.3 |
70.0 |
67.0 |
64.2 |
66.2 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
66.2 |
4130562 |
56.6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
62.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Max |
66.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Min |
55.1 |
|
|
|
|
|
|
|
|
Location
: NM2 (38 Ha Wun Yiu G/F - Free Field) |
|
|
|
|
|
|
|
|
|
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A)* |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
Leq* |
L10* |
L90* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10-Jun-11 |
10:58 |
67.6 |
69.0 |
64.0 |
68.1 |
67.6 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
5754399 |
67.1 |
|
|
|
|
|
|
|
|
16-Jun-11 |
10:02 |
67.3 |
69.5 |
65.0 |
68.1 |
67.3 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
|
|
|
|
|
|
|
|
|
|
22-Jun-11 |
11:35 |
67.8 |
69.5 |
65.0 |
68.1 |
67.8 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
|
|
|
|
|
|
|
|
|
|
28-Jun-11 |
10:44 |
69.2 |
71.0 |
67.5 |
68.1 |
62.7 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
62.7 |
1861095 |
66.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
66.8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Max |
67.8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Min |
62.7 |
|
|
|
|
|
|
* +3dB(A) Façade effect correction included |
|
|
|
|
|
|
|
|
|
|
|
#
- Limit Level of 70dB(A) applies to education institutes while 65dB(A)
applies during school examination period. |
|
|
|
|
|
|
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
|
|
|
|
|
|
|
|
|
|
If Measured noise level < Baseline
noise level, Corrected noise level = Measured noise level |
|
|
|
|
|
|
|
|
|
|
Appendix I |
|
|
|
|
|
|
|
|
|
|
|
|
Location
: NM3 (Wong Shiu Chi Middle School Rooftop - Façade) |
|
|
|
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level,
dB(A) |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A)# |
Exceedance (Y/N) |
|
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
|
|
10-Jun-11 |
13:05 |
64.4 |
66.0 |
61.5 |
64.8 |
64.4 |
65 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
2754229 |
53.3 |
|
|
16-Jun-11 |
13:17 |
67.1 |
70.0 |
64.0 |
64.8 |
63.2 |
65 |
N |
|
|
|
####### |
####### |
####### |
####### |
63.2 |
|
|
|
|
22-Jun-11 |
11:00 |
64.3 |
65.5 |
61.0 |
64.8 |
64.3 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
|
|
|
|
28-Jun-11 |
14:17 |
68.2 |
70.0 |
66.5 |
64.8 |
65.5 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
65.5 |
3586983 |
64.1 |
|
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
Average |
64.4 |
|
|
|
|
|
|
|
|
Max |
65.5 |
|
|
|
|
|
|
|
|
Min |
63.2 |
|
|
|
|
|
|
|
|
|
|
|
Location
: NM4 (Uptown Plaza Block 4 Rooftop - Façade) |
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A) |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
10-Jun-11 |
13:00 |
66.4 |
67.5 |
65.2 |
67.4 |
66.4 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
4365158 |
67.4 |
|
16-Jun-11 |
13:00 |
66.4 |
68.0 |
62.5 |
67.4 |
66.4 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
|
|
|
22-Jun-11 |
11:35 |
65.8 |
67.5 |
63.0 |
64.8 |
58.9 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
58.9 |
|
|
|
28-Jun-11 |
14:02 |
67.4 |
70.0 |
65.0 |
67.4 |
67.4 |
75 |
N |
|
|
|
####### |
####### |
####### |
0.0 |
#NUM! |
5495409 |
66.8 |
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
Average |
65.7 |
|
|
|
|
|
|
|
|
Max |
67.4 |
|
|
|
|
|
Min |
58.9 |
|
|
#
- Limit Level of 70dB(A) applies to education institutes while 65dB(A)
applies during school examination period. |
|
|
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
|
|
|
|
|
|
If Measured noise level < Baseline
noise level, Corrected noise level = Measured noise level |
|
|
|
|
|
|
Appendix I |
|
|
|
|
|
|
|
|
|
|
|
|
Location
: NM5 (The Paragon Clubhouse Rooftop - Façade) |
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A) |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
|
|
10-Jun-11 |
14:13 |
62.7 |
64.0 |
60.5 |
65.2 |
62.7 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
1862087 |
63.3 |
|
|
16-Jun-11 |
11:09 |
68.2 |
69.5 |
65.0 |
65.2 |
65.2 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
65.2 |
|
|
|
|
22-Jun-11 |
13:00 |
64.7 |
66.5 |
62.0 |
64.8 |
64.7 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
|
|
|
|
28-Jun-11 |
9:21 |
69.2 |
71.0 |
68.0 |
65.2 |
67.0 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
67.0 |
5006326 |
62.3 |
|
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
65.2 |
|
|
|
|
|
|
|
|
Max |
67.0 |
|
|
|
|
|
|
|
|
Min |
62.7 |
|
|
Location
: NM6 (PLK Tin Ka Ping Primary School near the entrance - Free Field) |
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A)* |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A)# |
Exceedance (Y/N) |
|
|
|
|
|
|
|
Date |
Start Time |
Leq* |
L10* |
L90* |
|
|
|
|
|
|
|
|
10-Jun-11 |
13:52 |
64.3 |
65.5 |
58.0 |
64.5 |
64.3 |
65 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
2691535 |
56.2 |
|
|
16-Jun-11 |
14:12 |
67.9 |
69.6 |
63.5 |
64.5 |
65.2 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
65.2 |
|
|
|
|
22-Jun-11 |
10:45 |
66.6 |
67.5 |
63.5 |
64.8 |
61.9 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
61.9 |
|
|
|
|
28-Jun-11 |
15:09 |
67.4 |
69.0 |
66.5 |
64.5 |
64.3 |
70 |
N |
|
|
|
####### |
####### |
####### |
####### |
64.3 |
2677026 |
64.2 |
|
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
64.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Max |
65.2 |
|
|
|
|
|
|
|
|
Min |
61.9 |
|
|
Remarks |
|
|
|
|
|
|
|
|
|
* +3dB(A) Façade effect correction included |
|
|
|
|
|
|
|
#
- Limit Level of 70dB(A) applies to education institutes while 65dB(A)
applies during school examination period. |
|
|
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
|
|
|
|
|
|
If Measured noise level < Baseline
noise level, Corrected noise level = Measured noise level |
|
|
|
|
|
|
Appendix I |
|
|
|
|
|
|
|
|
|
Location
: NM7 (Riverain Bayside Switch Room Rooftop - Façade) |
|
|
|
Day
time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Measured
Noise Level for 30-min, dB(A) |
Baseline Noise Level, dB(A) |
Corrected Construction
Noise Level, dB(A) ** |
Limit Level, dB(A) |
Exceedance (Y/N) |
|
|
|
|
|
|
Date |
Start Time |
Leq |
L10 |
L90 |
|
|
|
|
|
|
10-Jun-11 |
14:45 |
59.2 |
61.1 |
56.5 |
61.5 |
59.2 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
831764 |
60.1 |
|
16-Jun-11 |
9:45 |
65.5 |
68.0 |
63.0 |
64.8 |
57.2 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
57.2 |
|
|
|
22-Jun-11 |
9:54 |
59.0 |
60.5 |
57.0 |
61.5 |
59.0 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
#NUM! |
|
|
|
28-Jun-11 |
9:06 |
68.1 |
69.5 |
66.5 |
61.5 |
67.0 |
75 |
N |
|
|
|
####### |
####### |
####### |
####### |
67.0 |
5044005 |
59.6 |
|
|
|
|
|
|
Corrected
Noise Level dB(A) |
|
|
|
|
|
|
|
|
|
|
Average |
62.6 |
|
|
|
|
|
|
|
Max |
67.0 |
|
|
|
|
|
|
|
|
Min |
57.2 |
|
|
Remarks |
|
|
|
|
|
**
Construction noise level is only calculated when Measured noise level (Leq)
> Baseline noise level. |
|
|
If Measured noise level < Baseline
noise level, Corrected noise level = Measured noise level |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|