Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

4 May 2011

Time:

09:00

Inspection No.:

125

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Dark smoke was emitted from an excavator at S14. The Contractor was reminded to properly service the excavator to avoid dark smoke emission.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

5 May 2011

Time:

14:00

Inspection No.:

126

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

11 May 2011

Time:

14:00

Inspection No.:

127

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Stagnant water was observed inside the waste skip at Gate 7. The Contractor was reminded to clear the stagnant was and take mitigation measures to prevent mosquito breeding.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

12 May 2011

Time:

09:00

Inspection No.:

128

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The site inspection did not cover the area at S14. The status of emission from the plants at S14 is to be inspected. (Follow-up)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

The haul road at Wall 4-7 was dry. The Contractor was reminded to take dust suppression measures more frequently to minimize fugitive dust generation.

 

 

3.

Stagnant water was observed inside a waste skip at Wall 4-7. The Contractor was reminded to clear the stagnant water and take mitigation measures to prevent mosquito breeding.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

18 May 2011

Time:

09:00

Inspection No.:

129

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Stagnant water inside the waste skip at Gate 7 had been cleared and coverage was provided to prevent rainwater from accumulating inside the skips. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

19 May 2011

Time:

14:00

Inspection No.:

130

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

No dark smoke emission was observed from the plants at S14. (Closed)

 

 

 

2.

Water spraying was provided to the haul road at Wall 4-7 and the entire haul road was sufficiently dampened. (Closed)

 

 

3.

The waste skip at Wall 4-7 was flipped over to prevent accumulation of stagnant water inside. (Closed)

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

25 May 2011

Time:

09:00

Inspection No.:

131

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

26 May 2011

Time:

14:00

Inspection No.:

132

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

1.

The level of the concrete layer at NLKP Pier 2 had become higher than the sand bag bunding next to the u-channel. The Contractor was reminded to improve the bunding to intercept site runoff from entering the u-channel.

2.

Exposed slope was observed near the u-channel at NLKP Pier 2. The Contractor was reminded to either cover the slope with tarpaulin or hydro-seed the slope to prevent surface runoff into the u-channel.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil