Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
6 April 2011 |
Time: |
14:00 |
Inspection No.: |
117 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Additional sandbag bunding had been
provided at the slope below the concrete blocks to intercept untreated water
at Bridge 13A Pier 2. (Closed) |
|
|
2. |
The
bottles of chemical on ground at W73 had been removed. (Closed) |
|
|
|
|
|
|
|
New
Observations |
3. |
Dusty
material was observed on ground at W38. The Contractor was reminded to clear
up the dusty material. |
4. |
Oil
stains were observed on ground at W49. The Contractor was reminded to remove
the oil stains and properly maintain the vehicles and plants on site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
7 April 2011 |
Time: |
14:00 |
Inspection No.: |
118 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
14 April 2011 |
Time: |
14:00 |
Inspection No.: |
119 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
14 April 2011 |
Time: |
14:00 |
Inspection No.: |
120 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
The dusty material at W38 had been cleared.
(Closed) |
|
|
2. |
The
oil stains at W49 had been cleared. (Closed) |
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
19 April 2011 |
Time: |
09:00 |
Inspection No.: |
121 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Leaves
were accumulated inside the u-channel along Wall 10 and Wall 17. The
Contractor was reminded to clear the leaves inside the u-channel more
frequently. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
21 April 2011 |
Time: |
14:00 |
Inspection No.: |
122 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
27 April 2011 |
Time: |
09:00 |
Inspection No.: |
123 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Leaves inside the u-channel along Wall 10
and Wall 17 had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
28 April 2011 |
Time: |
14:00 |
Inspection No.: |
124 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |