Site
Inspection Summary
| Contract No.  | HY/2008/09 (Between Island House
  Interchange and Ma Wo) | 
| Date: | 3 March 2011 | 
| Time: | 09:00 | 
| Inspection No.: | 107 | 
|  | Nil | 
|  | Follow
  Up Observation | 
|  |  | 
|  | Nil. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | New
  Observation | 
|  | Nil. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | Nil | 
Site
Inspection Summary
| Contract No.  | HY/2009/08 (Between Ma Wo and Tai Hang) | 
| Date: | 3 March 2011 | 
| Time: | 14:00 | 
| Inspection No.: | 108 | 
|  | Nil | 
|  | Follow
  Up Observations | 
|  |  | 
| 1. | The leaves inside the u-channel at W38 had
  been removed. (Closed) | 
|  |  | 
| 2. | The
  stockpiles of dusty material at Area B had been covered properly. (Closed) | 
|  |  | 
| 3. | Non-inert
  C&D waste, general refuse and metal had been sorted and separated from
  one another on site. (Closed) | 
|  |  | 
|  | New
  Observations | 
| 4. | Dark
  smoke was observed emitted from a drill rig at Bridge 13A Pier 2. The
  Contractor was reminded to properly maintain the plants on site. | 
| 5. | Seepage
  of muddy water was observed from the gaps of concrete blocks under the piling
  area at Bridge 13A Pier2. To prevent muddy water from running off to the
  adjacent stream, the Contractor was requested to align a bunding at the foot
  of the concrete blocks to divert the seeped water to desilting facility. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | Nil | 
Site
Inspection Summary
| Contract No.  | HY/2008/09 (Between Island House
  Interchange and Ma Wo) | 
| Date: | 9 March 2011 | 
| Time: | 14:00 | 
| Inspection No.: | 109 | 
|  | Nil | 
|  | Follow
  Up Observation | 
|  |  | 
|  | Nil. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | New
  Observations | 
| 1. | Two
  chemical containers were placed on ground without drip tray at Bridge 10A.
  The Contractor was reminded to provide drip tray to all chemicals on site. | 
|  |  | 
| 2. | Ropes
  to hang clothes were found tied on retained trees at Bridge 10A. The
  Contractor was reminded to untie the ropes and not to hang anything on the
  retained trees in the future. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | Nil | 
Site
Inspection Summary
| Contract No.  | HY/2009/08 (Between Ma Wo and Tai Hang) | 
| Date: | 10 March 2011 | 
| Time: | 14:00 | 
| Inspection No.: | 110 | 
|  | Nil | 
|  | Follow
  Up Observations | 
|  |  | 
| 1. | No dark smoke was observed emitted from the
  drill rig at Bridge 13A Pier 2. (Closed) | 
|  |  | 
| 2. | Sand
  bag bunding had been aligned at the bottom of the concrete blocks at Bridge
  13A Pier 2 to divert the seeped water to a desilting pit. (Closed) | 
|  |  | 
|  |  | 
|  |  | 
|  | New
  Observations | 
| 3. | Dusty
  material from soil nailing works was accumulated at Bridge 18 C35. The
  Contractor was reminded to clear up the dusty material in a timely manner.  | 
| 4. | Soil
  nail installation controller was placed on ground without drip tray at Bridge
  18 C35. The Contractor was reminded to provide drip tray to all soil nail
  installation controllers on site. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | Nil | 
Site
Inspection Summary
| Contract No.  | HY/2008/09 (Between Island House
  Interchange and Ma Wo) | 
| Date: | 17 March 2011 | 
| Time: | 09:00 | 
| Inspection No.: | 111 | 
|  | Nil | 
|  | Follow
  Up Observations | 
|  |  | 
| 1.  | The chemical containers on ground without
  drip tray at Bridge 10A had been removed. (Closed) | 
|  |  | 
|  |  | 
| 2. | Ropes had been untied from the retained
  trees at Bridge 10A. (Closed) | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | New
  Observation | 
|  | Nil. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | Nil | 
Site
Inspection Summary
| Contract No.  | HY/2009/08 (Between Ma Wo and Tai Hang) | 
| Date: | 17 March 2011 | 
| Time: | 14:00 | 
| Inspection No.: | 112 | 
|  | Nil | 
|  | Follow
  Up Observations | 
|  |  | 
| 1. | The dusty material from soil nailing works
  at Bridge 18 C35 had been cleared. (Closed) | 
|  |  | 
| 2. | The
  soil nail installation controller at Bridge 18 C35 had been provided with
  drip tray. (Closed) | 
|  |  | 
|  |  | 
|  |  | 
|  | New
  Observation | 
| 3. | The
  flap of an air compressor at NLKP 7 was opened during operation. The
  Contractor was reminded to close the flaps of mechanical equipments during
  operation.  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | Nil | 
Site
Inspection Summary
| Contract No.  | HY/2008/09 (Between Island House
  Interchange and Ma Wo) | 
| Date: | 23 March 2011 | 
| Time: | 09:00 | 
| Inspection No.: | 113 | 
|  | Nil | 
|  | Follow
  Up Observation | 
|  |  | 
|  | Nil. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | New
  Observation | 
| 1. | Noise
  emission label was missing on an air compressor at West abutment of Bridge
  10A. The Contractor was reminded to attach the noise emission label on the
  body of the air compressor. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | Nil | 
Site
Inspection Summary
| Contract No.  | HY/2009/08 (Between Ma Wo and Tai Hang) | 
| Date: | 24 March 2011 | 
| Time: | 14:00 | 
| Inspection No.: | 114 | 
|  | Nil | 
|  | Follow
  Up Observation | 
|  |  | 
| 1. | The flap of an air compressor at NLKP 7 had
  been closed during operation.  (Closed) | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | New
  Observation | 
| 2. | The
  sand bag bunding at the bottom of the concrete blocks at Bridge 13A Pier2 was
  covered up by shotcrete layer which rendered the sand bags ineffective to
  prevent untreated water from running off to the adjacent stream. The
  Contractor was advised to provide an effective bunding to divert the
  untreated water to desilting facility. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | Nil | 
Site
Inspection Summary
| Contract No.  | HY/2008/09 (Between Island House
  Interchange and Ma Wo) | 
| Date: | 31 March 2011 | 
| Time: | 09:00 | 
| Inspection No.: | 115 | 
|  | Nil | 
|  | Follow
  Up Observation | 
|  |  | 
| 1. | Noise emission label had been fitted on the
  air compressor at West abutment of Bridge 10A. (Closed) | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | New
  Observation | 
|  | Nil. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | Nil | 
Site
Inspection Summary
| Contract No.  | HY/2009/08 (Between Ma Wo and Tai Hang) | 
| Date: | 31 March 2011 | 
| Time: | 14:00 | 
| Inspection No.: | 116 | 
|  | Nil | 
|  | Follow
  Up Observation | 
|  |  | 
| 1. | The site inspection did not cover the area
  at Bridge 13A Pier2. The status of the bunding to divert untreated water was
  to be inspected. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | New
  Observation | 
| 2. | Two
  bottles of chemical were placed on ground without drip tray at W73. The
  Contractor was reminded to provide drip tray to all chemicals on site. | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  |  | 
|  | Nil |