Appendix I
Location : NM1 (Tai Kwong Secondary School Rooftop - Façade)
Day time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results
  Measured Noise Level for 30-min, dB(A) Baseline Noise Level, dB(A) Corrected Construction Noise Level, dB(A) ** Limit Level, dB(A) Exceedance (Y/N)
Date Start Time Leq L10 L90
1-Mar-11 10:43 65.0 66.5 61.5 64.2 57.3 70 N ####### ####### ####### 57.3 532010 60.0
7-Mar-11 13:10 66.9 68.0 63.5 64.2 63.6 70 N ####### ####### ####### 63.6  
18-Mar-11 10:43 66.8 69.0 63.5 64.2 63.3 70 N ####### ####### ####### 63.3 2156033 50.9
24-Mar-11 11:44 63.9 65.5 62.0 64.2 63.9 70 N ####### ####### ####### #NUM! 2454709 56.6
30-Mar-11 10:10 67.5 68.9 66.3 64.2 64.8 70 N ####### ####### ####### 64.8 2993145 64.1
Corrected                         Noise Level dB(A)
Average 62.6
Max 64.8
Min 57.3
Location : NM2 (38 Ha Wun Yiu G/F - Free Field)
Day time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results
  Measured Noise Level for 30-min, dB(A) Baseline Noise Level, dB(A)* Corrected Construction Noise Level, dB(A) ** Limit Level, dB(A) Exceedance (Y/N)
Date Start Time Leq* L10* L90*
1-Mar-11 10:25 68.4 70.0 65.5 68.1 56.6 75 N ####### ####### ####### 56.6 461767 67.1
7-Mar-11 10:30 69.0 71.0 67.5 68.1 61.7 75 N ####### ####### ####### 61.7  
18-Mar-11 10:00 69.8 72.0 65.5 68.1 64.9 75 N ####### ####### ####### 64.9 3093384 67.2
24-Mar-11 10:57 66.7 68.5 64.5 68.1 66.7 75 N ####### ####### ####### #NUM! 4677351 66.3
30-Mar-11 10:32 68.2 70.0 65.0 68.1 51.8 75 N ####### ####### ####### 51.8 150392 66.8
Corrected                         Noise Level dB(A)
Average 60.3
Max 66.7
Min 51.8
*  +3dB(A) Façade effect correction included
** Construction noise level is only calculated when Measured noise level (Leq) > Baseline noise level. 
    If Measured noise level < Baseline noise level, Corrected noise level = Measured noise level
Appendix I
Location : NM3 (Wong Shiu Chi Middle School Rooftop - Façade)
Day time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results
  Measured Noise Level for 30-min, dB(A) Baseline Noise Level, dB(A) Corrected Construction Noise Level, dB(A) ** Limit Level, dB(A) Exceedance (Y/N)
Date Start Time Leq L10 L90
1-Mar-11 13:50 65.6 67.0 63.0 64.8 57.9 70 N ####### ####### ####### 57.9 610829 53.3
7-Mar-11 10:45 65.5 67.0 63.0 64.8 57.2 70 N ####### ####### ####### 57.2  
18-Mar-11 13:50 65.5 67.5 62.0 64.8 57.2 70 N ####### ####### ####### 57.2 528182 64.7
24-Mar-11 13:00 67.3 69.5 65.0 64.8 63.7 70 N ####### ####### ####### 63.7 2350366 64.1
30-Mar-11 15:10 66.8 69.1 63.2 64.8 62.5 70 N ####### ####### ####### 62.5 1766349 64.7
Corrected                         Noise Level dB(A)
Average 59.7
Max 63.7
Min 57.2
Location : NM4 (Uptown Plaza Block 4 Rooftop - Façade)
Day time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results
  Measured Noise Level for 30-min, dB(A) Baseline Noise Level, dB(A) Corrected Construction Noise Level, dB(A) ** Limit Level, dB(A) Exceedance (Y/N)
Date Start Time Leq L10 L90
1-Mar-11 11:30 67.7 70.0 64.0 67.4 55.9 75 N ####### ####### ####### 55.9 393028 67.4
7-Mar-11 14:30 67.2 69.0 63.0 67.4 67.2 75 N ####### ####### ####### #NUM!  
18-Mar-11 14:45 68.9 70.5 63.5 67.4 63.6 75 N ####### ####### ####### 63.6 2267062 65.5
24-Mar-11 11:40 67.2 69.5 65.5 67.4 67.2 75 N ####### ####### ####### #NUM! 5248075 66.8
30-Mar-11 14:25 67.3 69.4 64.9 67.4 67.3 75 N ####### ####### ####### #NUM! 5370318 66.3
Corrected                         Noise Level dB(A)
Average 64.2
Max 67.3
Min 55.9
** Construction noise level is only calculated when Measured noise level (Leq) > Baseline noise level. 
    If Measured noise level < Baseline noise level, Corrected noise level = Measured noise level
Appendix I
Location : NM5 (The Paragon Clubhouse Rooftop - Façade)
Day time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results
  Measured Noise Level for 30-min, dB(A) Baseline Noise Level, dB(A) Corrected Construction Noise Level, dB(A) ** Limit Level, dB(A) Exceedance (Y/N)
Date Start Time Leq L10 L90
1-Mar-11 13:05 64.3 65.5 61.0 65.2 64.3 75 N ####### ####### ####### #NUM! 2691535 63.3
7-Mar-11 13:35 64.0 65.5 62.5 65.2 64.0 75 N ####### ####### ####### #NUM!  
18-Mar-11 13:05 64.7 66.0 60.5 65.2 64.7 75 N ####### ####### ####### #NUM! 2951209 62.1
24-Mar-11 10:44 64.7 66.0 63.0 65.2 64.7 75 N ####### ####### ####### #NUM! 2951209 62.3
30-Mar-11 13:45 67.0 68.4 63.8 65.2 62.3 75 N ####### ####### ####### 62.3 1700561 63.7
Corrected                         Noise Level dB(A)
Average 64.0
Max 64.7
Min 62.3
Location : NM6 (PLK Tin Ka Ping Primary School near the entrance - Free Field)
Day time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results
  Measured Noise Level for 30-min, dB(A) Baseline Noise Level, dB(A)* Corrected Construction Noise Level, dB(A) ** Limit Level, dB(A) Exceedance (Y/N)
Date Start Time Leq* L10* L90*
1-Mar-11 11:10 64.8 65.5 63.0 64.5 53.0 70 N ####### ####### ####### 53.0 201569 56.2
7-Mar-11 11:10 64.1 65.0 62.0 64.5 64.1 70 N ####### ####### ####### #NUM!  
18-Mar-11 11:00 65.1 66.5 63.5 64.5 56.2 70 N ####### ####### ####### 56.2 417554 51.2
24-Mar-11 13:00 65.8 67.0 62.0 64.5 59.9 70 N ####### ####### ####### 59.9 983511 64.2
30-Mar-11 11:30 64.2 66.5 59.7 64.5 64.2 70 N ####### ####### ####### #NUM! 2630268 64.1
Corrected                         Noise Level dB(A)
Average 59.5
Max 64.2
Min 53.0
Remarks
*  +3dB(A) Façade effect correction included
** Construction noise level is only calculated when Measured noise level (Leq) > Baseline noise level. 
    If Measured noise level < Baseline noise level, Corrected noise level = Measured noise level
Appendix I
Location : NM7 (Riverain Bayside Switch Room Rooftop - Façade)
Day time 07:00-19:00 hrs Normal Weekdays Impact Noise Monitoring Results
  Measured Noise Level for 30-min, dB(A) Baseline Noise Level, dB(A) Corrected Construction Noise Level, dB(A) ** Limit Level, dB(A) Exceedance (Y/N)
Date Start Time Leq L10 L90
1-Mar-11 10:03 60.0 61.0 57.5 61.5 60.0 75 N ####### ####### ####### #NUM! 1000000 60.1
7-Mar-11 9:44 59.5 60.5 57.5 61.5 59.5 75 N ####### ####### ####### #NUM!  
18-Mar-11 9:44 62.8 65.0 57.5 61.5 56.9 75 N ####### ####### ####### 56.9 492923 58.8
24-Mar-11 14:03 66.1 68.0 64.5 61.5 64.3 75 N ####### ####### ####### 64.3 2661265 59.6
30-Mar-11 11:20 58.4 59.0 54.0 61.5 58.4 75 N ####### ####### ####### #NUM! 691831 58.8
Corrected                         Noise Level dB(A)
Average 59.8
Max 64.3
Min 56.9
Remarks
** Construction noise level is only calculated when Measured noise level (Leq) > Baseline noise level. 
    If Measured noise level < Baseline noise level, Corrected noise level = Measured noise level