Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

1 February 2011

Time:

14:00

Inspection No.:

100

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The opened cement bag near the grout mixing plant had been properly covered with tarpaulin and the opened cement bag next to the u-channel at Bridge 12A had been removed. (Closed)

 

2.

The stockpile of silt next to the waste storage area at NB42 had been removed and the dusty material in the area had been covered with tarpaulin. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

3.

Oil stain was observed underneath a boring machine near the site entrance of W72B. The Contractor was reminded to clean up the oil stain and provide a tarpaulin sheet underneath all the equipments requiring repair and maintenance.

4.

Mud trails were observed on ground at the vehicle site entrance of W73. The Contractor was reminded to properly wash the vehicles before they leave the site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

10 February 2011

Time:

09:00

Inspection No.:

101

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The stockpiles of dusty material at Slope 13 had been covered with tarpaulin sheets. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

The bags of cement behind the grout mixer at Bridge 10A were placed on ground without cover. The Contractor was reminded to cover the bags of cement.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

10 February 2011

Time:

14:00

Inspection No.:

102

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The boring machine near the site entrance of W72B had been removed from the site and the oil stain had been cleared. (Closed)

 

 

 

 

2.

The vehicles leaving the site of W73 were washed manually by water jets and no mud trail was observed on ground at the vehicle site entrance of W73. (Closed)

 

 

 

 

 

 

 

 

 

New Observation

 

3.

Cement powder was scattered on ground at Bridge 13A. The Contractor was advised to clean up the cement powder and properly handle them in the future.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

16 February 2011

Time:

14:00

Inspection No.:

103

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The cement bags and grout mixer at Bridge 13A had been removed from the site and temporary storage of cement bags on site were found to be properly covered. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

17 February 2011

Time:

14:00

Inspection No.:

104

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The cement powder on ground at Bridge 13A had been cleared. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Leaves were observed accumulated inside the u-channel at W38. The Contractor was reminded to remove the leaves from the u-channel regularly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

24 February 2011

Time:

09:00

Inspection No.:

105

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

24 February 2011

Time:

14:00

Inspection No.:

106

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The site inspection did not cover the area at W38. The status of the u-channel at W38 is to be inspected.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

Stockpiles of dusty material at Area B were not properly covered. The Contractor was reminded to cover the stockpiles with tarpaulin sheets.

3.

Non-inert C&D waste, general refuse and metal were found mixed inside a waste skip in Area B. The Contractor was reminded to sort the waste on site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil