Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
1 February 2011 |
Time: |
14:00 |
Inspection No.: |
100 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
The opened cement bag near the grout mixing
plant had been properly covered with tarpaulin and the opened cement bag next
to the u-channel at Bridge 12A had been removed. (Closed) |
2. |
The stockpile of
silt next to the waste storage area at NB42 had been removed and the dusty
material in the area had been covered with tarpaulin. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
3. |
Oil
stain was observed underneath a boring machine near the site entrance of
W72B. The Contractor was reminded to clean up the oil stain and provide a
tarpaulin sheet underneath all the equipments requiring repair and
maintenance. |
4. |
Mud
trails were observed on ground at the vehicle site entrance of W73. The
Contractor was reminded to properly wash the vehicles before they leave the
site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
10 February 2011 |
Time: |
09:00 |
Inspection No.: |
101 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The stockpiles of dusty material at Slope
13 had been covered with tarpaulin sheets. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
The
bags of cement behind the grout mixer at Bridge 10A were placed on ground
without cover. The Contractor was reminded to cover the bags of cement. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
10 February 2011 |
Time: |
14:00 |
Inspection No.: |
102 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
The boring machine near the site entrance
of W72B had been removed from the site and the oil stain had been cleared.
(Closed) |
|
|
|
|
2. |
The
vehicles leaving the site of W73 were washed manually by water jets and no
mud trail was observed on ground at the vehicle site entrance of W73.
(Closed) |
|
|
|
|
|
|
|
New
Observation |
3. |
Cement
powder was scattered on ground at Bridge 13A. The Contractor was advised to
clean up the cement powder and properly handle them in the future. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
16 February 2011 |
Time: |
14:00 |
Inspection No.: |
103 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The cement bags and grout mixer at Bridge
13A had been removed from the site and temporary storage of cement bags on
site were found to be properly covered. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
17 February 2011 |
Time: |
14:00 |
Inspection No.: |
104 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The cement powder on ground at Bridge 13A
had been cleared. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Leaves
were observed accumulated inside the u-channel at W38. The Contractor was
reminded to remove the leaves from the u-channel regularly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
24 February 2011 |
Time: |
09:00 |
Inspection No.: |
105 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
24 February 2011 |
Time: |
14:00 |
Inspection No.: |
106 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The site inspection did not cover the area
at W38. The status of the u-channel at W38 is to be inspected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
2. |
Stockpiles
of dusty material at Area B were not properly covered. The Contractor was
reminded to cover the stockpiles with tarpaulin sheets. |
3. |
Non-inert
C&D waste, general refuse and metal were found mixed inside a waste skip
in Area B. The Contractor was reminded to sort the waste on site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |