Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
5 January 2011 |
Time: |
09:00 |
Inspection No.: |
091 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Non-inert
C&D waste was accumulated at Bridge 10A. The Contractor was reminded to
clear the C&D waste in a timely manner. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
5 January 2011 |
Time: |
14:00 |
Inspection No.: |
092 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The dusty material on the ground at Area C
had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Identification
was missing for the transplanted trees within the site at Area B. The
Contractor was reminded to tag the transplanted trees with the identification
numbers. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
12 January 2011 |
Time: |
14:00 |
Inspection No.: |
093 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Identification numbers had been reattached
to the transplanted trees at Area B. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
13 January 2011 |
Time: |
14:00 |
Inspection No.: |
094 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The site inspection did not cover the area
at Bridge 10A. The status of the C&D waste clearance is to be inspected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
20 January 2011 |
Time: |
09:00 |
Inspection No.: |
095 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The non-inert C&D waste at Bridge 10A
had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
20 January 2011 |
Time: |
14:00 |
Inspection No.: |
096 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Uncovered
opened bags of cement were left on the ground near the grout mixing plant and
near the u-channel at Bridge 12A. The Contractor was advised to cover the
opened bags of cement and properly handle cement in the future. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
26 January 2011 |
Time: |
09:00 |
Inspection No.: |
097 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Ropes
were tied on some retained trees and, in particular, a nail was found nailed
into the tree branch to hang electric wires at Bridge 11A. The Contractor was
requested to untie the ropes, pull out the nail and not to hang wires onto
the retained trees in the future. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
27 January 2011 |
Time: |
14:00 |
Inspection No.: |
098 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The site inspection did not cover the area
at Bridge 12A. The status of the opened bags of cement is to be inspected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
A
stockpile of silt was not properly covered next to the waste storage area at
NB42. The Contractor was reminded to cover the stockpile with tarpaulin
sheet. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
31 January 2011 |
Time: |
09:00 |
Inspection No.: |
099 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Ropes and nails had been removed from the
retained trees and electric wires had been kept away from the trees at Bridge
11A. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Several
stockpiles of dusty material were not covered at Slope 13. The Contractor was
reminded to properly cover the stockpiles to prevent fugitive dust
generation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |