Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

5 January 2011

Time:

09:00

Inspection No.:

091

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Non-inert C&D waste was accumulated at Bridge 10A. The Contractor was reminded to clear the C&D waste in a timely manner.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

5 January 2011

Time:

14:00

Inspection No.:

092

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The dusty material on the ground at Area C had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Identification was missing for the transplanted trees within the site at Area B. The Contractor was reminded to tag the transplanted trees with the identification numbers.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

12 January 2011

Time:

14:00

Inspection No.:

093

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Identification numbers had been reattached to the transplanted trees at Area B. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

13 January 2011

Time:

14:00

Inspection No.:

094

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The site inspection did not cover the area at Bridge 10A. The status of the C&D waste clearance is to be inspected.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

20 January 2011

Time:

09:00

Inspection No.:

095

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The non-inert C&D waste at Bridge 10A had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

20 January 2011

Time:

14:00

Inspection No.:

096

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Uncovered opened bags of cement were left on the ground near the grout mixing plant and near the u-channel at Bridge 12A. The Contractor was advised to cover the opened bags of cement and properly handle cement in the future.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

26 January 2011

Time:

09:00

Inspection No.:

097

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Ropes were tied on some retained trees and, in particular, a nail was found nailed into the tree branch to hang electric wires at Bridge 11A. The Contractor was requested to untie the ropes, pull out the nail and not to hang wires onto the retained trees in the future.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

27 January 2011

Time:

14:00

Inspection No.:

098

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The site inspection did not cover the area at Bridge 12A. The status of the opened bags of cement is to be inspected.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

A stockpile of silt was not properly covered next to the waste storage area at NB42. The Contractor was reminded to cover the stockpile with tarpaulin sheet.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

31 January 2011

Time:

09:00

Inspection No.:

099

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Ropes and nails had been removed from the retained trees and electric wires had been kept away from the trees at Bridge 11A. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Several stockpiles of dusty material were not covered at Slope 13. The Contractor was reminded to properly cover the stockpiles to prevent fugitive dust generation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil